EYETS septa status Septa activities TE/ABT Thierry Masson

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
MTTR and spare parts policy for BT equipment 23/1/2008 ATC/ABOC days MTTR and spare parts policy for BT equipment BT equipment with long MTTR PSB ISOLDE.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
SEPTA and spares follow-up J. Borburgh for SEpta section.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
IEFC Workshop 9 th March 2012 – Magnet activities in IEF during LS1 – J. Bauche 1 Magnet activities during LS1 J.Bauche, on behalf of the TE/MSC/MNC section.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
LSC May 2013 Outcome of the magnets tests from the PS, Leir and transfer lines Dominique Bodart.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
ELENA KICKERS AND SEPTA ELENA Meeting, Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
Report Technical Director Storage-Ring-Installation Completed
Magnet activities in SPS during EYETS
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
YETS & LS2 Works EN-EL / Power distribution
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review
ABT-EC EYETS Activities 2nd reports
PS / Booster septa control
Operating the septa beyond their design specs
CT Hardware Overview and Issues
TE-MSC activities in SPS during LS2
EYETS David Hay EN-OSS.
Dielectric Oil Installations
K. Foraz on behalf of OSS members
EC Activities Status for LIU September 2017
LIU – EVM status and next steps
AD consolidation activities in LS2
SPS - EYETS 2016/17 Vacuum systems planning
Planning and Installation
EC Activities Status for the LIU
n_TOF “Draft” plans for YETS and LS2
TE-ABT Activities for LS2
Possible causes for SPS ZS2 misalignment
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
SPS EN-CV Planning LS (initial draft)
ELENA electron cooler and SEM grids status
SPS Planning for the EYETS Meeting 8 (07/12/2016)
Update on MKP Strategy ACKNOWLEDGEMENTS M.J. Barnes
EN-CV interventions during EYETS for PS and PSB
YETS PS + PS SWY + TT2 Facility Coordinator:
YETS & LS2 Works EN-EL / Power distribution
TE-MSC activities in SPS during YETS
EYETS septa status Septa activities TE/ABT Thierry Masson
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Magnet electrical and hydraulic (dis)connections for coating
Experimental Areas – LS2 planning
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
SPS Planning meeting for LS2 #25 Vacuum sectors status
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

EYETS 2016-2017 septa status Septa activities TE/ABT Thierry Masson 28/02/2017 EYETS 2016-2017 Septa status

CPS General maintenance Exchange of water filters (PS, PSB & Leir) done SEH 3M station maintenance done Removal SMH42.3 done 8/02/2017 leak detected on SMH42.3 (removed from PS 8/2/2017) SMH42.2 (2 years run) to be refurbishment asap spare coil available (last one), ready to be chrome plated (external company) new coil has to be ordered (EN/MME) ordered SMH26 First new interlock control system installed (TE-ABT-EC) done Tests (Marco and Antoine) done Exchange of SEH23 done, under vacuum, HV connected SMB to be re-installed after MU exchange Exchange BESMH planned 6/03/2017 Installation SMH42.1 planned 14/03/2017 28/02/2017 EYETS 2016-2017 Septa status

CPS General maintenance LEIR extraction septum SMH40 Magnet removed from beam line for bake out (13-02-2017) Refurbishment septa workshop (b.867) done Silver coating of return conductor in TE/VSC lab ongoing installation in Leir planned this week Bake out septa wk.10 (PS), wk.12 (PSB), wk.11&12 (LEIR) according to TE/VSC Hardware tests (SEH & SMH) PS planned 31-03 PSB to be planned (20-04 until 07-04) 28/02/2017 EYETS 2016-2017 Septa status

SPS General maintenance MSE exchange in LSS4 (30-01-2017) MSE refurbished installed in LSS4 (14-02-2017) Vacuum leak test done Bake out (200°C) water filters (x21) done Installation of water filter in LSS2 done ZS 3M station maintenance activities done ZS Anode/Cathode movement check (pot. cleaning) done 28/02/2017 EYETS 2016-2017 Septa status

SPS General maintenance To be done LSS2 3 oil containers (HV resistor) to be replaced ongoing Water filter in LSS4 planned next week Refill demineralized water from 13th March (EN-CV) planned 13-03 Testing girders movement, flow interlocks, WinCC Need demineralized water 28/02/2017 EYETS 2016-2017 Septa status

Summary EYETS progressing as planned, except: SMH40, refurbishment of return conductors started Refurbishment of SMH42.2 started, ready by May. 28/02/2017 EYETS 2016-2017 Septa status