Radiation-safe area for electronics, or laser or

Slides:



Advertisements
Similar presentations
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Advertisements

Fast, Accurate and Reliable Robotic Storage System
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
KLINGE’S NMR 262 Two Independent Systems Integrated into one Unit This Requires Special Features:  Total Redundancy of Refrigeration Components  Total.
MERIT Collaboration Meeting ISSUES RELATING TO THE Hg-JET TARGET SYSTEM P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University November 17, 2005.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
The ISOLDE robots upgrade JL GRENARD EN-HE ISOLDE Workshop and Users meeting
Stereo microscope – 5.4% air manual mm spacing manual.
Radiation Environment at AWAKE Silvia Cipiccia, Eduard Feldbaumer, Helmut Vincke.
Printer Installation Ben Wu A&S IT 09/18/2007. Outline  Preparation  Local Printer Installation  Network Printer Installation  Printer Sharing  Other.
TSP800II Series Thermal Printers. Receipt & Specialty Printer Extra-Wide Format fits many applications. Label Printing Provides for Dual-Purpose Printing.
Neuro-MEP-MICRO Delivery Set Electronic unit Small table holder Slider for Neuro-MEP-Micro Set of EMG electrodes Surface electrode.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA DESIGN Ans Pardons HiRadMat review, 26 th of May 2011 Outline  Location of experimental area & services.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
PicoTRAIN IC Only oscillator (no MOPA design)  more simplicity and reliability Dimensions: 480*200*101.6mm3 ongoing volume production High stability.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
Alignment (results by Jo van den Brand) Preparing IP 8 Velo arrived at IP 8 Preparing UXA C3 Installation transfer lines for the cooling system Next steps.
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Fantastic Fridges alias Refrigeration and Air Conditioning your name your company.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
YETS activities in n_TOF O. Aberle, S. Montesano (EN/STI)
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
HIGH RADIATION TO MATERIALS: HIRADMAT STATUS HiRadMat Scientific Board, 23/4/2012 Outline  Location  Status  Beam line  Infrastructure  Exp. Area.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
ARIEL Building Pierre Bricault. Proton Beam specification The proton beam energy must be between 450 to 500 MeV. 200 µA with proton beam intensity losses.
Integration of CLIC TBM in CLEX Electronics allocation and cables tracing Wilfrid Farabolini (CEA/IRFU) 16 October 2013.
PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone 22 th November 2012 LIU-PSB.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Possible Layout of Positron Target Region Peter Sievers and Kaoru Yokoya MiniWS, KEK 2016/4/19 Target Region Layout, Yokoya 1.
Ag Power Ag Mechanics Reduce Preventive maintenance on tractors will _____ repairs and downtime.
Long-Baseline Neutrino Facility LBNF Beamline optimization schedule Vaia Papadimitriou LBNF Beamline Manager Accelerator and Beam Interface Group Meeting.
STORAGE AND MAINTENANCE OF LARGE FARM EQUIPMENT Prepared by : Von G. Peavy South Region Ag Mechanics.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Computer Bunker Training Most classrooms contain a bunker equipped with a computer with an integrated DVD player and an ELMO for your use.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
H.-G. Moser, April 25, 2016 Gemba Summary 1 Plan: Shipment (sea transport in summer) 6-8 weeks => arrival August/September Commissioning: After October.
Integration of the Spectrometer Solenoid Magnets
I. Bergevoet - Training preparation
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
St. George Infrastructure
CBETA Technical Review
TAXS and TAXN ABSORBERS - OVERVIEW
News from Integration WG
n_TOF “Draft” plans for YETS and LS2
FCC Tunnel and Shaft Cross Sections
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
LUCID Mechanical support and cooling proposal Status of the current design development Erik Richards, Raphael Vuillermet December 10th 2013.
Antiproton decelerator
Electrical and fluid couplings
Polarized 3He target installation
Presentation transcript:

Radiation-safe area for electronics, or laser or Radiation-safe area for electronics, or laser or ??? (drill connection to TNC) Cool-down area Lab to prepare test objects – space is limited and in high demand Cable trays that carry service hoses & cables for test area automatic plug-in plus additional user-specific services Old T9 target becomes muon dump: Replace target with dump core, TED type (cooling, window, N2) Add shielding TJ7

Common base table: aligned before start-up. (check during shut-down possible) Test object table: Different table for each test object Auto-aligned with base table Connections (manual) towards racks in TT61 or to TJ7 for user-specific services Interface: Mechanical auto-alignment, precision up to ~0.1mm Possibly remote plug-ins for water, current, compressed air and signal/control Such that several (or only one) of different sized and shaped test object tables can be integrated Connection for remote lifting, placing or moving operations by overhead crane