LHCb Upgrade Chris Parkes Stefano de Capua May 17, 2013

Slides:



Advertisements
Similar presentations
Development of super module structures at Glasgow Calum I. Torrie 20 th April 2007.
Advertisements

1 st Petal Prototype Fabrication completed October 27, 2008.
ATLAS Module building at Glasgow
LCWS 31/5/2007Erik Johnson STFC,RAL1 ILC Vertex Detector Mechanical Studies Erik Johnson On behalf of the LCFI collaboration STFC, Rutherford Appleton.
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,
The Layup of the Multi-chip Module Note: Assuming all two glues are of silicone type.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
1 Outer Tracker Mechanics, indico: May 2014, A.Onnela 21 May 2014 Thermally conductive carbon-fibre composite material for module and mechanics.
Pixel Upgrade Local Supports Based on Thermally Conducting Carbon Foam E. Anderssen, M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman,
Velo Module 0 minus minus Paula Collins. Investigating Module 0 thermal performance Baseline module design combines elements of different CTE (and Young’s.
1 CARRIER BUS LAYOUT(a) ± 193 mm ladder1ladder mm mm Pixel chip Michel Morel EP/ED 09/ x 425µ 256 x 50µ Decoupling capacitors
NEWS  Internal Review  November 20  Presentation covering most of the relevant L4 WBS activities: rf shielding, substrate,Vacuum vessel, Position control.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
SLHC Strip Tracker Module Envelopes (Tim) WP4 Meeting Glasgow, 13 th June 2011.
M. Gilchriese ATLAS Upgrade Mechanics/Cooling and System Design by LBL January 2008.
LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
M. Gilchriese SLHC Pixel Local Supports Based on Thermally Conducting Carbon Foam E. Anderssen, M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese,
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
FVTX substrate FEA1 FVTX Substrate FEA C. M. Lei March 02, 2006.
Thermal & Mechanical Support for Diamond Pixel Modules Justin Albert Univ. of Victoria Nov. 6, 2008 ATLAS Tracker Upgrade Workshop.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
Simon Kwan - FermilabCMS Tracker Upgrade Workshop – June 3, Update on the Phase 1 FPIX Half Disk Design Simon Kwan Fermilab on behalf of the USCMS.
Thermal Model of Pixel Blade Conceptual Design C. M. Lei 11/20/08.
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
The LHCb Vertex Locator Lars Eklund LHCb VELO Group of the LHCb Collaboration CERN (Geneva), EPFL (Lausanne), NIKHEF (Amsterdam), University of Glasgow,
VELO upgrade news 19 January VELO Upgrade Survey  Not yet filled in, but last answers arriving in the next 24 hours....!  Hope to soon appoint.
Dummy Modules The next step is to build and test 10 thermal modules for tests and distribution. What do we want to test? Thermal performance and variation.
Pixel upgrade test structure: CO 2 cooling test results and simulations Nick Lumb IPN-Lyon MEC Meeting, 10/02/2010.
Report on dummy detector Equipped with Heater & sensors NA62 GigaTracker Working Group Meeting May 24 th 2011.
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
(Tim Jones).  Who am I? ATLAS-UK Tracker Upgrade work-package leader for WP4 (Mechanics)  Materials, Cooling, Stave Core Assembly, Module Mounting,
1 1F.Bosi, M.Massa, SuperB Meeting, Isola d’Elba, May 31, 2008 Update on Thin Mechanics/Cooling R&D for the Layer 0 of the SuperB Factory F. Bosi - M.
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
FVTX substrate FEA1 FVTX Substrate FEA C. M. Lei March 02, 2006.
Thermal modeling, interfaces, test results LBNL Composites Workshop February 29-March 3, 2016.
First Thermal Estimates for Serial Powering at Chip/Module Level Yadira Padilla Joe Conway, Charlie Strohman, Jim Alexander, Anders Ryd, Julia Thom Cornell.
13 May 2011 Eddy Jans 0 Plans for the VELOpix-module LHCb-Nikhef discussion some specifications some requirements some ideas about the VELOpix-module some.
P. Sutcliffe Liverpool University
KIT TA Status Felix Bögelspacher, Bärbel Bräunling, Wim de Boer, Alexander Dierlamm Prof. Dr. Max Mustermann | Name of Faculty.
Developing Radiation Hard Silicon for the Vertex Locator
Summary LBNL LSWG meeting
T. Bowcock University of Liverpool
Local Supports for Inclined Layout: CERN Update
Hybrid Pixel R&D and Interconnect Technologies
Simulated vertex precision
Phase 2 Outer Tracker Module analysis
Low Mass mechanical design
TK Upgrade report.
Studies of Quad Pixel Module assembly using paper laminate
2S module geometry updates Module positioning concepts
WG4 – Progress report R. Santoro and A. Tauro.
Group meeting, 2nd Sept, 2013; JAW
Work packages status in Torino and perspectives
Silicon tracker and sensor R&D for sPHENIX
UNIZH and EPFL at LHCb.
Tests on a dummy facet of PIX upgrade using CO2 cooling
Outer Tracker Module Design meeting, 27 January 2014 News on the PS and 2S module geometries 200 W / 2m 100 W / 5m News on PS and 2S module geometries,
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

LHCb Upgrade Chris Parkes Stefano de Capua May 17, 2013

Pixel Prototype Make a mechanical prototype of a pixel module0 for testing mechanical stability/stiffness + cooling properties with a dummy sensor, dummy chips and a resistor. May 17, 2013 Stefano de Capua

silicon/silicon bonding Components The substrate is made of carbon foam encapsulated in carbon fibre. 200 mm thick silicon for both the sensor and the chips. Kapton/Copper heaters from Tony. Carbon foam (allcomp) 5 mm Tc = 70 Wm-1K-1 (isotropic) Carbon Fiber 150 mm Tc = (297, 140, 1.29) Wm-1K-1 Silicon sensors 44.0 x 14.6 x 0.2 mm3 Silicon chips 16.1 x 14.1 x 0.2 mm3 Epolite FH-5313 Epoxy silicon/silicon bonding Tc = 0.28 Wm-1K-1 DowCorning SE4445 CV silicon/CF bonding Tc = 1.34 Wm-1K-1 Hysol EA9396 C fibre/foam bonding Tc = 0.21 Wm-1K-1 Epoxy glue for PT sensors Tc = 0.84 Wm-1K-1 25 chips (1x) May 17, 2013 Stefano de Capua

Scheme sensor epolite fh5313 heater epolite fh5313 chip chip chip dowcorning se4445 carbon fibre hysol ea9396 carbon foam hysol ea9396 carbon fibre May 17, 2013 Stefano de Capua

May 17, 2013 Stefano de Capua

FPGA Processing Simon is working on data processing for pixel sensors in FPGAs Work completed so far – compile EPFL prototype and show fits in proposed FPGA Next steps: develop API, implements time-descrambling of packets Partner on VELO algorithms is AGH-Krakow May 17, 2013 Stefano de Capua

FPGA Processing Simon is working on data processing for pixel sensors in FPGAs Work completed so far – compile EPFL prototype and show fits in proposed FPGA Next steps: develop API, implements time-descrambling of packets Partner on VELO algorithms is AGH-Krakow May 17, 2013 Stefano de Capua

Software Tom Bird (student) has optimised pixel layout