IBL activities ATLAS Meeting Milano, 14 May 2012 S. Coelli,

Slides:



Advertisements
Similar presentations
MVD A SSEMBLY T WO HALF FRAME DONE – D IMENSION T ESTED A NCILLARIES FOR F RAMES DONE – D IMENSION T ESTED F RAME A SSEMBLY & F INAL M ACHINING – MUST.
Advertisements

Wrap up of the thermal and thermo mechanical simulation on the IBL stave Simone Coelli Mauro Monti INFN Milano ATLAS PIXEL Inserted B-Layer Eng. Meeting.
Alice ITS L5,6 Integration 1 End wheels and local services design – services layout on the end wheels: patch panels, routing, cooling and qualification.
IBL Brazing Study April the 20 th 2012 Eric Vigeolas.
Saga of the IBL Staves Franck Cadoux on behalf of the ATLAS IBL engineering team (and Eric Vigeolas in particular)
31 août 2011 Didier Laporte – LPNHE Paris 1 IBL Integration Stave Review Université de Genève.
25/06/2015Robert King, Oxford University - Graduate Seminar Series 1 Electronic speckle pattern interferometry at the SLHC.
1. Start with Kit of Parts Original kit of parts New carbon fiber (CF) parts Flexure elements Links Steel triangles Steel faceplate Polyester flexure 2.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
? ? ? ? ? ?.  3 POINT BENDING TEST :  Varying loads and spans  Variables measured in the gravity center:  Deflections with vision machine  Strains.
Thermo-mechanical infrastructure: Environmental Monitoring with FOS AIDA WP9.3 meeting November 21 th DESY, Hamburg. David Moya Martin Instituto de Física.
ATLAS POH.P, G.D12/5/2009 IBL Update H. Pernegger, G. Darbo (PO 12/5/09) Organization and WG coordinator Schedule Decision Items Organization Tools & Meetings.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
1 S. Coelli, M. Monti - INFN MILANO Istituto Nazionale di Fisica Nucleare Sezione di Milano LHCb – UT TRACKER UPGRADE 30 September 2013 UT TRACKER DETECTOR.
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: News about mechanics components Report on first test of cooling plant.
ILC Vertex Tracker Ladder Studies At LBNL M Battaglia, D Contarato, L Greiner, D Shuman LBNL, Berkeley.
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 31/8/2015 Simone Coelli For the Milano UT group INFN Milano 1 Istituto.
Pixel/IBL status and plans A.Rozanov A.Rozanov ATLAS-France
Pixel Heaters Refurbishment A.Bitadze.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 8/7/2015 Simone Coelli For the Milano UT group INFN milano 1 Istituto.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
IBL - Opening G. Darbo - INFN / Genova AW, 25 February 2009 o IBL Introduction & Project Organization ATLAS Upgrade Week CERN, 25 February 2009 Session:
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
12/3/2015R. Mountain, Syracuse University LHCb CO2 Cooling EDR2.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
Dec
FEM/CFD thermo-mechanical analyses on IBL Mock-up A. Sciuccati.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Installation of the T600 at Fermilab CSN2, September 22,
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
ATLAS ITk - Activities Common Mechanics group (Lukasz Zwalinski, Paolo Petagna, … ) Plant →PP1 DEMO & BABY DEMO 14/03/2016C. Rossi - INFN Genova1 Detector.
1 Disk Sectors Integrated support and cooling for disk modules. Each sector has 6 modules Number of sectors is 2x9+4x8=50. Fabrication of all sectors in.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov Design of the.
Introduction to the IBL D. Giugni Jan 30 th 2009 D. Giugni1ATLAS Milano -Jan 2009-
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
Stave thermal analysis Cooling connections CO2 warm Test
Crab Cavity Technical Coordination meeting:
ATLAS Internal ID Service Integration
Feedback on transfer line sizing and flow calculations for UT
IBL project for DT Science-Techno Tea
Stress and cool-down analysis of the cryomodule
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Micro Vertex Detector of PANDA Strip Detector
SILICON PIXELS DETECTOR
WP9 ITS Mechanics and Cooling
Update on WG4 A.Tauro - R.Santoro 11/10/11 ITS upgrade meeting.
ALICE PD group meeting Andrea Francescon.
Clic Vertex Thermal Setup and stave studies
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
update on UT cooling system
WG4 – Progress report R. Santoro and A. Tauro.
MicroMegas Mechanical Meeting --- Cern April 2014
2th EuCard Col/Mat WP Meeting
Communications Share Point Collaborative WS:
CO2 cooling requirements for the IBL
Phase II Collimators : design status
Thermal test (lab modules)
Update on ATLAS insertable B-layer
Presentation transcript:

IBL activities ATLAS Meeting Milano, 14 May 2012 S. Coelli, Servizio Progettazione e Officina Meccanica – INFN MILANO A. Capsoni, M. Monti, F. Tomasi, E. Viscione

IBL project EDMS reports FEM SIMULATION REPORTS FOR THE IBL STAVE Number: ATU-SYS-EA-0007  v.1 THE SUB-DOCUMENTS ATTACHED TO THIS ONE INCLUDE THE REPORT USED FOR THE IBL TDR. THERMAL FIGURE OF MERIT USING A FACEPLATE STAVE DEFORMATIONS UNDER THERMAL AND GRAVITATIONAL LOADS, SEVERAL BOUNDARY CONDITIONS. DYNAMIC ANALYSIS WORK IN PROGRESS => EXPERIMENTAL MEASUREMENT OF THE STAVE DEFORMATION INDUCED BY THE COOLING https://edms.cern.ch/document/1211313/1 IBL STAVE FEM SIMULATIONS REPORTS FOR THE TDR 01 - MECHANICAL SIMULATIONS VALIDATION REPORT 02 - STEADY-STATE THERMAL ANALYSIS OF THE STAVE 03 - STRUCTURAL ANALYSIS OF THE COOLING CARBON PIPE 04 - THERMO-MECHANICAL ANALYSIS OF THE STAVE 05 - STAVE_THERMAL_FIGURE_OF_MERIT 06 - CF-Ti JOINT OVERBRAID OPTIMIZATION 07 - REFINED STAVE THERMAL FIGURE OF MERIT 08 - STAVE DYNAMIC ANALYSIS

RECENTLY MEASURED THERMAL PERFORMANCE OF THE IBL STAVE PROTOTYPE CONFIRMS THE DESIGN ANALYSIS

EXTRACT AS EXAMPLE ..EFFECTS OF DIFFERENT FLEXBUS DESIGN ..EFFECTS OF DIFFERENT FACEPLATE DESIGN

EXPERIMENTAL MEASUREMENT OF THE STAVE DEFORMATION INDUCED BY THE COOLING TEST OF INFRARED TRANSPARENT MATERIALS FOR THERMAL IMAGE TAKEN USING A I.R. CAMERA (FLIR) TEST BOX INSTALLED IN THE LASA METROLOGY LAB. COOLED USING NITROGEN SPILLED FROM A LN2 RANGER OPTICAL MEASUREMENT OF THE STAVE DISPLACEMENT IN SEVERAL POINTS CONSTRAINS ATTACHED TO INVAR REFERENCE BAR TEMPERATURE THERMORESISTANCE PT100 SENSORS

ATLAS PIXEL DETECTOR INTEGRATION AND TESTING TOOL (ITT) SET-UP OF THE TOOL INTO THE CERN CLEAN ROOM (SR-1) ASSEMBLING STARTED IN MARCH 2012 THE SCOPE (TO BE DECIDED) TO MAKE POSSIBLE THE INTEGRATION OF: - NEW SERVICE QUARTER PANELS (nSQP) - NEW BEAM-PIPE - WITH INTEGRATED IBL

ATLAS PIXEL DETECTOR INTEGRATION AND TESTING TOOL (ITT) MARCH 2012 SET-UP INTO CERN CLEAN ROOM SR-1

ATLAS PIXEL DETECTOR INTEGRATION and INSTALLATION 2006 2006