16L2 aperture measurements

Slides:



Advertisements
Similar presentations
FLUKA studies: channeled ions on LHC IP7 L. Lari (CERN & IFIC (CSIC-UV)) D. Mirarchi (CERN & ICL) A. Lechner (CERN) ColUSM#32 December the 6 th,
Advertisements

Analysis. Start with describing the features you see in the data.
Investigations of Unidentified Lying Objects in the LHC D. Mirarchi, R. Bruce, P. Hermes, S. Redaelli, B. Salvachua, G. Valentino On behalf of the LHC.
1 Analysis of MD on IR1 and IR5 aperture at 3.5 TeV – progress report C. Alabau Pons, R. Assmann, R. Bruce, M. Giovannozzi, G. Müller, S. Redaelli F. Schmidt,
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Vacuum system Available beam scraper Beam dimensions, Target cell Machine Studies on February 7 th 2009.
SPS aperture measurements MSWG 26/03/2013 Stéphane Cettour Cavé.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
PS Booster Studies with High Intensity Beams Magdalena Kowalska supervised by Elena Benedetto Space Charge Collaboration Meeting May 2014.
DANIELE MIRARCHI CERN FOR UA9 COLLABORATION Data reduction and analysis of SPS data.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Beam Background Simulations for HL-LHC at IR1 Regina Kwee-Hinzmann, R.Bruce, A.Lechner, N.V.Shetty, L.S.Esposito, F.Cerutti, G.Bregliozzi, R.Kersevan,
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
“Beam Losses” Christian Carli PSB H - Injection Review, 9 th November 2011 Several topics more or less related to beam losses, a study still somewhat at.
LHC 8:30 meetingEBH 11 Thursday 24 November 2011.
With a lot of help from Reine Versteegen, John Jowett, Richard Jacobson, Burkhard Schmidt, Gilda Scioli, Werner Herr CERN-LHC * IP5 IP1 IP8 Spectrometer.
LHC Crystal MD 22/09/2015 – LSWG #7 R. Rossi for the LHC Collimation team and the UA9 Collaboration.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
Primary beam production: progress - Extraction from LSS2 - Switching from TT20 at 100 GeV B.Goddard F.Velotti, A.Parfenova, R.Steerenberg, K.Cornelis,
Update on HI beams study Magdalena Kowalska supervised by Elena Benedetto BE/ABP/HSC 16 September 2015.
Draft MD Planning Thu (3.11.) DayTimeMDMP Thu05:00 Ramp down, cycle 07: GeV: Injection stability and losses – check steering constraints, define.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Injection status W. Bartmann, C. Bracco, B. Goddard, V. Kain, A. Macpherson, M. Meddahi, S. Redaelli, J. Uythoven, J. Wenninger LIBD Meeting, 20 th Sept.
Benchmarking Headtail with e-cloud observations with LHC 25ns beam H. Bartosik, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo.
Results of TCL scans D. Mirarchi, M. Deile, S. Redaelli, B. Salvachua, Collimation Working Group, 22 nd February 2016.
R.W. Assmann, V. Boccone, F. Cerutti, M. Huhtinen, A. Mereghetti
Operating IP8 at high luminosity in the HL-LHC era
Alignment and beam-based correction
LHC Wire Scanner Calibration
MD Planning Fri – Sat (26. – 27.8.)
Tracking simulations of protons quench test
Jim Crittenden CHESS Simulation Working Group 30 March 2015
Transfer line test: Beam stability measurements
R. Kersevan, TE-VSC-VSM 30/06/2016
Saturday 21st April 00:33 Interlock during ramp on BLM HV
16 T dipole in common coil configuration: mechanical design
C.Octavio Domínguez, Frank Zimmermann
Spectrometer Operation in IP2 & 8
Electron Observations from ATIC and HESS
Results from crystal H on Beam 2
MD2490: Measurement of the TMCI Threshold at Flat-Top
Update on the PSB Transfer Lines
Energy deposition studies in IR7 for HL-LHC
Interpretation and use of BLM Data
Alice solenoid – orbit distortion
Assessment of BLM thresholds at cold magnets
Orbit Response Measurement Update
Startup program, 1 Machine setup (i.e. R:\Controls\matlab\acceleratorcontrol\docs\SRSetupUsingMatlab_ALS.doc) Bergoz BPM/orbit checks: monbpms, correct.
CNGS Proton beam line: news since NBI2002 OUTLINE 1. Overview
Planning at 5 o’clock meeting Friday
Global aperture measurements at 450 GeV with 170 mrad crossing angle
Saturday 7th May Sat – Sun night
HL-LHC operations with LHCb at high luminosity
Beam Loss Simulations LHC
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
Pushing the LHC nominal luminosity with flat beams
Studies on orbit corrections
FLUKA Energy deposition simulations for quench tests
Preliminary analysis of PS septum 31 failure August 8th, 2008
Triplet corrector layout and strength specifications
A. Tsinganis, F. Cerutti (EN/STI/FDA)
Fri :52 Stable beams fill #2536
Friday 15th February - morning
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
31/3/2010 Difficult day… but at the end stable beams.
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Saturday Morning used to complete the loss maps and asynch dumps (with RPs). All loss maps OK (B. Salvachua), but the off-p cleaning for B1 (Lead) was.
Presentation transcript:

16L2 aperture measurements D. Mirarchi

Measurement procedure 4 correctors bump in H plane 3 correctors bump in V plane Q16 Q16 Q17 Q15 Local aperture measurements (beam 1) carried out the 29th November: Beam screen Beam gently blown up with ADT to fill 5.7s (TCP aperture) No losses at Q16 Local orbit bump with 0.5 mm steps (1s ~ 1mm) Bump reverted and gentle blow up each time aperture touched 1st losses at Q16

Overview Arrows show the orbit movements performed (the blue star is the starting orbit) Local orbit bumps are increased until losses are observed Displacement in the horizontal plane limited by shift at Q17 and Q15

BLM layout All BLMs installed on internal/external side BLMMI.16L2.B1E50_MC BLMMI.16L2.B2I50_MC All BLMs installed on internal/external side Symmetric in the vertical plane Same response if source of hadronic showers top/bottom of the beam screen

Measured orbit bump UP DOWN Example of measured vertical orbit plus beam envelope when touching the aperture Q16 MCB Q16 MCB UP DOWN Main considerations: Bump well matched and symmetric when scanning up/down directions Maximum orbit shift in the middle of MQ.16L2, 2% less amplitude at MCB.16L2 Aperture reached in agreement with aperture model (i.e. orbit + envelope ~ 17 mm)

Example of local beam loss pattern when touching up/down Background subtracted and losses normalized to the highest peak for an easier visual comparison Q16 MCB Q16 MCB UP DOWN Beam 1 Beam 1 Clear difference observed: When touching UP source of hadronic shower at the beginning of MQ.16L2 When touching DOWN source of hadronic shower moved toward MCB.16L2

Beam loss pattern (2) Possible explanations: Internal misalignment? Are we really touching something different on the top/bottom? Loss pattern observed when touching UP, with horizontal shift of -10 mm UP, H=-10mm Beam 1 It seems that we are touching something different as a function of H orbit and V direction!

Based on different loss pattern observed we can extrapolate: Measured aperture Based on different loss pattern observed we can extrapolate: Compatible with pumping direction

Conclusions Local aperture measurements show no evident aperture restriction (as opposed to the ULO) Different beam loss pattern as a function of H displacement and V direction Possible indication of something “sticking” on the beam screen close to MCB.16L2 Compatible with pumping direction Possible further investigations: Energy deposition simulations to evaluate change of source of hadronic shower based of the different loss pattern observed

Measurements 29th of May UP DOWN Re-checked previous measurements: similar features in the loss pattern (even though less BLMs were present) Probably we were in the same situation: UP Beam 1 DOWN