NA61 status and plans Preliminary spectra for T2K 2009 run

Slides:



Advertisements
Similar presentations
New results and perspectives on R AA measurements below 20 GeV CM-energy at fixed target machines Zoltán FODOR, András LÁSZLÓ, György VESZTERGOMBI for.
Advertisements

European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
March 13thXXXXth RENCONTRES DE MORIOND 1 The Alpha Magnetic Spectrometer on the International Space Station Carmen Palomares CIEMAT (Madrid) On behalf.
1 NA49/NA61: results and plans on beam energy and system size scan at the CERN SPS Onset of deconfinement: - NA49 evidence - NA61 systematic study Critical.
NA61/SHINE overview Seweryn Kowalski for the NA61/SHINE Collaboration Institute of Physics University of Silesia.
Recent results from NA61/SHINE Seweryn Kowalski for the NA61/SHINE Collaboration University of Silesia, Katowice.
RESEARCH POSTER PRESENTATION DESIGN © The RHIC Beam Energy Scan (BES) was proposed to search for the possible critical.
At CERN SPS Z. Fodor KFKI – Research Institute for Particle and Nuclear Physics S PS H eavy I on and N eutrino E xperiment The NA61 High-pt physics in.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Slide 1 of 40 Brovko, Haag, Cebra January 06, 2011 LF Spectra Phone Conference STAR as a Fixed Target Experiment? Sam Brovko, Brooke Haag, Daniel Cebra.
1 Future Short-Baseline Neutrino Experiments Workshop – March 21, 2012 Workshop on Future Short-Baseline Neutrino Experiments March 21, 2012 Fermilab David.
28 June 2010 Rajendran Raja, ISHVECRI Particle production Experiments and their relevance to understanding Extensive Air showers Rajendran Raja.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
PSD upgrade - schedule/resources: electronics and cooling system F. Guber INR, Moscow NA61/SHINE upgrade workshop, CERN 3– 5 March, 2014.
1 M. Gazdzicki, Frankfurt, Kielce for the NA61 Collaboration NA61/SHINE: 2008 Status Report Fundamentals Next 12 months 2007 data calibration and analysis.
1 M. Gazdzicki, Frankfurt, Kielce for the NA61 Collaboration Critical Point and Flying Neutrinos - - NA61/SHINE at the CERN SPS Addendum-3 CERN-SPSC ,
The ALICE Experiment Event by Event fluctuations ALICE TOF Calibration 30th November 2007Chiara Zampolli1.
1 M. Gazdzicki, Frankfurt, Kielce Further Information Requested in the Proposal (SPSC-P-330) Review Process Progress since February 2007 Addendum-2 by.
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Marina Golubeva, Alexander Ivashkin Institute for Nuclear Research RAS, Moscow AGeV simulations with Geant4 and Shield Geant4 with Dpmjet-2.5 interface.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
1 M. Gazdzicki, Frankfurt, Kielce for the NA61 Collaboration NA61/SHINE at the CERN SPS: Status and Plans Fundamentals Plans and experimental landscape.
Claudia Strabel, ETH Zurich SPS Annual Meeting June 21 – 22, 2010 Hadro-production measurements for T2K with NA61/SHINE at the CERN SPS.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
NA61 ION PROGRAM M. RYBCZYŃSKI for the NA61 Collaboration Institute of Physics, Jan Kochanowski University Kielce, Poland.
1 CERN April 19, 2012 NA61 status and other issues Other issues NA61 status and plans.
1 M. Gazdzicki, Frankfurt, Kielce for the NA61 Collaboration Onset of Deconfinement and Critical Point: Nucleus-Nucleus Program of NA61/SHINE Fundamentals.
1 NA61/SHINE physics program: -Critical Point and Onset of Deconfinement, -Neutrino physics, -Cosmic-ray physics NA61/SHINE at the CERN SPS Proposal: CERN-SPSC ,
SPSC recommendations [Installation at PS-T9] Baby MIND weekly meeting 28 th October 2015.
1 NA61/SHINE Collaboration Metting, Dubna, April 7-11, 2014 NA61/SHINE news and plans (October 2013-February 2014) Published papers: Measurements of production.
1 NA61/SHINE: Status and Data taking with ion beams Proposal: CERN-SPSC , SPSC-P-330 (November 3, 2006) LoI: CERN-SPSC , SPSC-I-235 (January.
NA61/SHINE run schedule/plans:
Status and plans of the ion program of NA61 at the CERN SPS
Itzhak Tserruya Weizmann Institute of Science
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
NA61 news and plans (May 2013-October 2013) Publications:
Test Beam Request for the Semi-Digital Hadronic Calorimeter
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
(SHINE – SPS Heavy Ion and Neutrino Experiment)
NA61 revised beam request
Outlook by the Physics Coordinator
Shift instructions August 16, 2017 Antoni Aduszkiewicz
Preparation for CERN test beam
LHCC referees’ questions, comments, requests
SPSC123 Summary Lau Gatignon/EN-EA IEFC, 4 November 2016.
Cracow Epiphany Conference,
Veksler and Baldin Laboratory
NA61 news and plans Progress in 2010 Revised data taking
Success of the first NA61 run
NA61 news and plans News from other labs/experiments
NA61 news and plans (October 2012 – May 2013)
Further Information Requested in
NA61/SHINE: hadron production in p+p/A and A+A interactions at the CERN SPS Antoni Marcinek (Jagiellonian University) for the NA61 collaboration Layout:
Search for the critical point of strongly interacting matter
of secondary light ion beams
of secondary light ion beams
10/month is the present production rate 2 FTE + sporadic contributions
F.Guber, A.Ivashkin INR, Moscow
NA61/SHINE: status and energy scans with Pb+Pb collisions
K. Grebieszkow Analysis plans: ions Warsaw University of Technology
NA61 news and plans Results, results, results ... π- + C → h- + X
András László (for the NA61/SHINE Collaboration)
Current Status of the T2K Experiment
Chris Smith California Institute of Technology EPS Conference 2003
Summary SPSC meeting November 2005 for EA section meeting
Jerzy Pietraszko, HADES at SIS100 - status GSI Darmstadt, Germany
Presentation transcript:

NA61 status and plans Preliminary spectra for T2K 2009 run CERN November 30, 2009 Preliminary spectra for T2K 2009 run Ion beams for NA61 Other issues

Preliminary pion spectra

2009 physics run Data taking period: July 26 – November 16 Aim: high statistics data for: - T2K: p+C and p+(T2K RT) at 31 GeV/c - cosmic-ray: π+C at 158 and 350 GeV/c - CP, OD: p+p at 10-158 GeV/c Registered in 2009: p+C at 31 GeV/c p+(T2K RT) at 31 GeV/c pion+C at 158 GeV/c pion+C at 350 GeV/c p+p at 20 GeV/c p+p at 31 GeV/c p+p at 40 GeV/c p+p at 80 GeV/c p+p at 158 GeV/c p+p at 10 GeV/c were not registered due to insufficient beam quality

2009 run history MD – Machine development MP - Machine problems TC - Target Change BC - Beam Change

2009 run: neutrinos p+C at 31 GeV/c 6M events p+(T2K replica target) at 31 GeV/c 4M events

2009 run: cosmic-rays π+C at 158 GeV/c 5M events π+C at 350 GeV/c

2009 run: strongly interacting matter p+p at 158 GeV/c 4M events p+p at 80 GeV/c 4M events p+p at 40 GeV/c 6M events p+p at 31 GeV/c 3M events p+p at 20 GeV/c 2M events

Progress in 2009 on detector upgrades for runs with ion beams Projectile Spectator Detector: -construction of modules in progress, -successful tests of the read-out electronics and integration with the NA61 DAQ, -expected to be ready for 2011 He beam pipe: -technical design ready, -construction of the the prototype and installation test to be started soon, -expected to be ready in 2011 NA61 PSD super-module

Progress and plans in data taking for CP&OD Addendum 5 NA61 ion program Pb+Pb NA49 (1996-2002) Xe+La 2014 Ar+Ca 2012 B+C 2010/11(13) p+p 2009/10 p+Pb 2011/12 10 20 30 40 80 158 energy (A GeV)

Searching for the critical point 10A GeV Xe+La Ar+Ca p+p B+C p+p In+In 10 20 30 40 80 158 energy (A GeV) Search for the hill of fluctuations Discovery potential

? Study the onset of deconfinement Search for the onset of the horn Xe+La ? Ar+Ca B+C p+p 10 20 30 40 80 158 energy (A GeV) 10 20 30 40 80 158 energy (A GeV) Search for the onset of the horn in collisions of light nuclei Precision measurements following the NA49 discovery

The NA61 revised data taking plan FR test-1 secondary (FR test-2) primary (secondary) primary

Timely approval of the NA61 ion program by the RB SPSC recommendations The SPSC notes that secondary light ion beams can be used for atomic weights up to and including Boron, but that primary beams are required for the heavier ion species necessary to complete the proposed NA61 program. The SPSC recommends that the necessary preparations for a secondary Boron beam be started in 2010, and that an energy scan with this Boron beam be performed as soon as technically possible. In addition, the SPSC also supports carrying out the necessary preparatory work for possible energy scans with primary beams of heavier ion species in timely manner. Timely approval of the NA61 ion program by the RB is necessary for its proper execution The NA61 ion program is the most important and ambitious part of the whole NA61 program with a significant discovery potential. Its further delay may stop the NA61 development (grants, experts, students, ...) and significantly decrease the chance for its success.

Other issues New CERN safety rules and running with ion beams lead to numerous safety issues, CERN support is required to establish the NA61 Safety File and execute the required safety procedures NA61 software modernization, virtualization and work on data preservation are urgently needed, CERN support required: collaboration with the CERN VM project and a NA61 person at CERN dedicated to the project Further work on the PSD and He-beam pipe upgrades requires help of the CERN technical support groups (project reviews, participation in safety issues, installation, tests and assembling at CERN), Using present experience of Joachim Bachler, PH DT (previous NA49) the discussion on the corresponding working packages started. CERN support to these projects is mandatory