LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
17 july 2008 Inner Triplets upgrade – 2013 Very first Schedule.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
EN-CV interventions during YETS
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
Injectors & LHC report K. Foraz on behalf of OSS members 01/11/13LSC - EN-MEF-OSS1.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
TE-CRG Activities D. Delikaris, TE-CRG.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
Update on the PSB Cooling and Ventilation Systems
K. Foraz on behalf of OSS members
ABT-EC EYETS Activities 2nd reports
CBETA Technical Review
DRY RUNS 2015 Status and program of the Dry Runs in 2015
BE-BI Activities and Status: LHC and Injectors
TE-MSC activities in SPS during LS2
SMACC Tenth report [15 min] 13/09/2013
Francois and Lau EATM 17 July 2012
EYETS David Hay EN-OSS.
BA6 – crab cavity activities in EYETS
Status of LHC installation & New Installation Schedule
K. Foraz on behalf of OSS members
TE-MPE LS1 review Vision from EN-EL(CF)
SPS - EYETS 2016/17 Vacuum systems planning
on behalf of the RF group
Update of cryogenic activities
The LHC - Status Is COLD Is almost fully commissioned
Long Shutdown for the LHC: Vacuum Beam Pipes
TE-ABT Activities for LS2
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
MPE main activities planned for LS2
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
Short LHC-TS week 38 Confirmed by LMC on 16th August
TE-MSC activities in SPS during YETS
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
LHC installation status
Experimental Areas – LS2 planning
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 06/03/2019.
Hardware Commissioning
SPS Planning meeting for LS2 #25 Vacuum sectors status
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

K. Foraz on behalf of OSS members Injectors & LHC report K. Foraz on behalf of OSS members 27/09/2013 LSC - EN-MEF-OSS

PS In Progress New Access system TT2 – move BPM started RF maintenance TT2 line vented PS In Progress New Access system tests by Cegelec nights during 3 nights  started SWY hardware installation is in progress TT2 – move BPM started CV Consolidation in progress – dismantling phase finished Septum 16 External Shielding in progress Cabling campaign in progress General equipment maintenance:   Instrumentation, Beam Stoppers, (EN/STI)  consolidation/maintenance program 27/09/2013 LSC - EN-MEF-OSS

PSB Completed In progress Forecast AS 45 lift successfully commissioned and operational In progress PSB beam dump replacement The last of the 5 shielding blocks have been successfully installed. The New Beam dump installation process is ongoing. CV consolidation and maintenance of CV, kickers, Septa, vacuum beam instrumentation, Magnet and Beam stopper, cabling campaign. Forecast Replacement of the BI.SMH. Final work and dose planning to be reviewed and authorized by the TE departmental RSO. Work to start wk 42 (14/10/2013) Preparation for the reassembly of the BTM and BTY beam line infrastructure. Terminate and reception the access control MAD. 27/09/2013 LSC - EN-MEF-OSS

SPS BA1: TT10: Other works: Irradiated cabling campaign will start next Tuesday TT10: Installation of the new support beams ongoing Other works: TE/VSC are continuing to pump down and leak detect all the long sectors of SPS. Installation of new fibre optic systems in BA5 started today All other works are proceeding on schedule 27/09/2013 LSC - EN-MEF-OSS

LHC - P1 R2E – Pt1: LSS1: Finished In progress Cable trays installation In progress Cabling progressing well Ethernet installation in US15 -> UJ-UL14 Relocation of cryogenics equipment LSS1: DFBX: consolidation of current leads in progress Cable tray for forward detector in progress 13kA upgrade in progress Modification of the DQR water pipes from next week (emptying) 27/09/2013 LSC - EN-MEF-OSS

LHC – P1  P2 Arc 12 : Point 2 LSS2 In progress Forecast UPS replacement in RE 18 and 22 Cryo-magnets reconnection done Electrical tests (AIV2) successfully performed last week Magnets connected SMACC: W bellows opened M openings finished (4 wks ahead of schedule) Vac consolidation in progress DFBA consolidation Forecast Splice consolidation from wk 42 Point 2 SU maintenance finishing Cryogenic maintenance in progress LSS2 Preparation for DFBXC consolidation 27/09/2013 LSC - EN-MEF-OSS

LHC - P2  P3 Arc 23 LSS3 QRL pumping in progress SMACC Magnet reconnection finished M opening in progress (10%  30%) UPS replacement going on (end delayed by 1wk due to AIV tests) QRL Xray campaign from next week Electrical maintenance P3 wk. 42 – No access in mid arc 23 LSS3 Cabling campaign in progress (shall be finished ahead of schedule next week) HRL consolidation in progress Electrical maintenance P3 wk. 42 – No access at P3 27/09/2013 LSC - EN-MEF-OSS

LHC - P3P4 Arc 34 In progress Forecast Magnets reconnection (End in November) SMACC: W bellows openings starting (60%  76%) Cryogenic consolidation services modules consolidation finished, mechanical, instrumentation consolidation progressing as foreseen Forecast QRL Xrays – mid October SMACC M openings – mid October Electrical maintenance P3 wk. 42 – No access in mid arc 34 27/09/2013 LSC - EN-MEF-OSS

LHC – P4P5 LSS4 & P4 Water cooled cables consolidation in progress Ducts are exchanged – NC appeared during insulation test Insulation test bis done yesterday: RQF & RB validated, but not RQD ) problem with switch suspected – being investigated) Work on power converter in progress (internal hydraulic flexible) Short circuit tests from Oct. 21st to Nov. 8th RF maintenance and upgrade Flow meters re-installation in progress LLRF, ADT maintenance and upgrade New cooling tower installation in progress Thermoswitch installation in progress Arc 45 In progress QRL pumping Magnet reconnection (end Nov.) DN200 (33%  68%) W opening (20%) DFBAI.5L – damaged bellow – opening in progress New cables for BLM SMACC – W openings started (65%) Forecast 60A power converter reinstallation Cryogenics consolidations from next week [QRL compensator replacement in December] DN200 installation 27/09/2013 LSC - EN-MEF-OSS

LHC – P5 LSS5: R2E – P5 UPS replacement finished Modification of the cabling for TOTEM almost finished 600A upgrade finishing Survey finished in 5L, finishing in 5R Forecast Piping work for Totem New walk-ways installation R2E – P5 UPS replacement finished Cable trays installation finished Chilled water pipes installation finishing Metallic structure installation for racks Transfer of vacuum cables on the new cable tray in UL 27/09/2013 LSC - EN-MEF-OSS

LHC – P5  P6 Arc 56 SMACC QRL compensator replacement in progress External envelope closed Sub-sector being pumped SMACC Non conformities being solved – end of October W closure stopped (priority to sector 67 ) – 36% 4/14 vacuum subsectors being leak tested (W) 2 sub-sectors validated DFBA consolidation in progress 5R finishing DFBAK.6L – damaged bellow – repair being scheduled Forecast New cables for BLM from next week QRL pumping from next week DFBAJ – MLI installation 27/09/2013 LSC - EN-MEF-OSS

LHC – P6 LSS6 & P6 In progress Forecast Cabling campaign ongoing Water cooled cable campaign in progress – priority on DFBAK.6L During the drain, an air bubble was blocked in cables between pipes and power converters - During disconnection, water sprinkled on the covering foil, but the covering foil was not water tight… 600A switch, and 600A are wet. Additional fans are now in place, and damage will be evaluated during next week 13kA upgrade Repair of RF fingers on BTVSE Forecast TCDQ upgrade Walk-ways installation 27/09/2013 LSC - EN-MEF-OSS

LHC – P6  P7 Arc 67 LSS7 R2E – P7: SMACC in progress: Diodes consolidation in progress – still 1 which is being cold tested on surface M lines vacuum tests (56%) W Closure activities in progress (13%  20%) 1/14 vacuum subsectors being leak tested (W) DFBA consolidation 6R ends finished 7L ends in 2 weeks QRL compensator exchange started (preparation phase) LSS7 Next week – modification of air ducts 600A upgrade in progress R2E – P7: (De- &)Cabling activities in progress : removal of DC cables. Modification of power converters cables..) 27/09/2013 LSC - EN-MEF-OSS

LHC - P7 P8 Arc 78 LSS8 &P8 R2E - P8 Splice consolidation in progress Shunt installation in progress (~66% -> 87% ) Non conformities solving Diodes started (13%) DFBA consolidation shall end wks 43 LSS8 &P8 Survey maintenance finished TDI removal next week R2E - P8 Cryo and cabling in progress 27/09/2013 LSC - EN-MEF-OSS

LHC – arc 81 Arc 81 - SMACC DFBA consolidation (ends end Nov.) Splices activities BB de-soldering in progress (35%  57%) BB re-soldering in progress (20%) Shunt installation – 6% QRL compensator being replaced Pumping of QRL just finished Final leak test next week QRL Xrays campaign just finished 27/09/2013 LSC - EN-MEF-OSS

Overall progress Injectors LHC So far, so good..still discussion in progress to advance the hardware test periods for PSB and PS LHC Rebaselining in progress, beam is still scheduled for January 2015 So far, so good..still 27/09/2013 LSC - EN-MEF-OSS

LHC Overall Schedule – broken line 27/09/2013 LSC - EN-MEF-OSS