Study Results Common Case Study

Slides:



Advertisements
Similar presentations
Presentation to State Water Resources Control Board November 14, 2012 By Dave Modisette Executive Director California Municipal Utilities Association.
Advertisements

Energy Efficiency Assumptions in the WIRAB Low Carbon Case Thomas Carr Western Interstate Energy Board July 30, 2008 Studies Work Group Meeting Portland,
Study Results PC8-PC16 System Stress Tests This slide deck contains results from the 2012 TEPPC Study Program related to the various stress tests performed.
Study Results High Hydro Study Low Hydro Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impacts of low.
Study Results Common Case Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of the 2022 Common Case.
Transmission Planning in the West pocket guide This reference guide is intended to assist individuals new to transmission planning in the Western Interconnection.
Study Results Southwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Southwest Firmed Resource.
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource.
Out of Region Market Assumptions Resource Adequacy Technical Committee April 6 th, 2011.
WESTERN ENERGY INFRASTRUCTURE ASSESSMENT Energy Infrastructure Policy Group Office of Energy Projects Docket No. AD Item A-3 July 23, 2003.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
ENVIRONMENTAL DATA IN TRANSMISSION PLANNING AUGUST 3, 2015 Carl Zichella DIRECTOR OF WESTERN TRANSMISSION.
California Transmission Planning Group Collaborative approach to State-wide Transmission Planning.
Study Results High EE/DG/DR Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of an increase of EE/DG/DR.
Rocky Mountain Area Transmission Study Steering Committee Meeting 2013 Case Alt 1 & 2 - Iteration 2 – Test Transmission Solutions Alt 3 & 4 – Iteration.
TAS – Review Load and Hydro Shapes for use in TEPPC 2026 Common Case Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PC21 Coal Retirement Study TAS/TEPPC – Nov W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC Reliability Study Requests Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting April 18, 2016 Sacramento, CA Thomas Carr Western Interstate Energy Board TEPPC’s Resource.
GENERATION MARKET MODELING & INTERVIEWS ON INTEGRATION BARRIERS Péter Kaderják András Kiss Michael LaBelle Budapest, February 25, 2008.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Dan Beckstead Associate Staff Engineer TEPPC 2026 Common Case Load.
Study Plan Development & Approach May 5, 2010 Conference Call & Webinar “To ensure efficient, effective, coordinated use & expansion of the members’
PC05 Low Hydro Study Results
PC04 High Hydro Study Results
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
4/23/2018 Steering Committee Meeting 2013 Case Alt 1 & 2 - Iteration 2 – Test Transmission Solutions Alt 3 & 4 – Iteration 1 - Define Congestion.
Barrilla Junction Area Transmission Improvements Project
Compare and Contrast Reliability Assumptions
Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations Ibrahim Krad Eduardo Ibanez Erik Ela.
WECC 2026 Common Case Capacity Assessment with RECAP
TEPPC Review Task Force Meeting February 4-5, 2016
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
Presented to the NARUC 2013 Winter Meeting
Reconciling Power Flow (PF) with Production Cost Model (PCM) Cases
Reliability Assessment Committee Proposal TSS Meeting
Nick Hatton Associate Engineer March 9, 2017
TAS & TEPPC Update CCTA Assumptions
I-5 Corridor Reinforcement Project
Keegan Moyer Interim Manager, Transmission Expansion Planning
Independent Load Forecast
Outline Modeling Issue 2017 Modeling Goals
SunZia Project Description
Out of Region Market Assumptions
Access Capacity Upgrades Larry Holloway Chief of Energy Operations
Current Hosting Capacity Limit
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
Western Electricity Coordinating Council
Western Electricity Coordinating Council
PC21 Coal Retirement Study
Study Results Common Case Study
2018 State of the Interconnection Overview
Long Term Grid Assessment – Preparing for 2018 Studies
Study Results PC8-PC16 System Stress Tests
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
PacifiCorp Overview Choose from three different title slide designs by selecting “New Slide.” These slides are suitable for business and community presentations.
Unscheduled Flow Administrative Subcommittee ISAS Report
Study Results Drought Scenario Study
Western Electricity Coordinating Council
NERC Congestion Management
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Presentation transcript:

Study Results Common Case Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of the 2022 Common Case. This study serves as a base case for all 2011 and 2012 studies.

2022 PC1 – Common Case Central Question: What impact will future load growth and generation needs (as defined by the input assumptions) have on transmission congestion in the Western Interconnection? These Results will be used as the starting input assumptions for all 2011 and 2012 studies. Results follow…

2022 Common Case Results – Annual Generation by Resource Type

DRAFT

2022 Common Case Results – Region to Region Transfers Hourly transfers Presented at the end of this presentation.

2022 Common Case Results – Most Heavily Utilized Paths “Most Heavily Utilized” = A path that meets any one of the following criterion (10-year plan utilization screening): U75 > 50% U90 > 20% U99 > 5% Uxx = % of year that flow is greater than xx% of the path limit

2022 Common Case Results – Most Heavily Utilized Paths

Hourly region-to-region transfers AZNMNV To Ca_S

Hourly region-to-region transfers Basin To AZNMNV

Hourly region-to-region transfers Basin To Ca_N

Hourly region-to-region transfers Basin To Ca_S

Hourly region-to-region transfers Ca_N To Ca_S

Hourly region-to-region transfers Canada To NWUS

Hourly region-to-region transfers NWUS To Basin

Hourly region-to-region transfers NWUS To Ca_N

Hourly region-to-region transfers NWUS To Ca_S

Hourly region-to-region transfers RMPA To AZNMNV

Hourly region-to-region transfers RMPA To Basin

Hourly region-to-region transfers California Net Export Hours of net export = 6053 hrs

Questions or thoughts on this study?