András László (for the NA61/SHINE Collaboration)

Slides:



Advertisements
Similar presentations
Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
Advertisements

Quark Matter 2006 ( ) Excitation functions of baryon anomaly and freeze-out properties at RHIC-PHENIX Tatsuya Chujo (University of Tsukuba) for.
Beamline Takashi Kobayashi 1 Global Analysis Meeting Nov. 29, 2007.
Patrick Robbe, LAL Orsay, for the LHCb Collaboration, 16 December 2014
25/07/2002G.Unal, ICHEP02 Amsterdam1 Final measurement of  ’/  by NA48 Direct CP violation in neutral kaon decays History of the  ’/  measurement by.
27 April ’12 MINER A meeting Alessandro Bravar Université de Genève UniGE Miner a Application Motivation UniGE neutrino group MINER UniGE NA61 / SHI.
BNL/ Tatsuya CHUJO CNS workshop, Tokyo Univ. Identified Charged Single Particle Spectra at RHIC-PHENIX Tatsuya Chujo (BNL) for the PHENIX.
 Production at forward Rapidity in d+Au Collisions at 200 GeV The STAR Forward TPCs Lambda Reconstruction Lambda Spectra & Yields Centrality Dependence.
The muon component in extensive air showers and its relation to hadronic multiparticle production Christine Meurer Johannes Blümer Ralph Engel Andreas.
The ALICE Experiment at the CERN LHC P. Kuijer for the Alice collaboration ICHEP 2002.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
J-PARC でのハイパー核ガンマ線分光実験用 散乱粒子磁気スペクトロメータ検出器の準備 状況 東北大理, 岐阜大教 A, KEK B 白鳥昂太郎, 田村裕和, 鵜養美冬 A, 石元茂 B, 大谷友和, 小池武志, 佐藤美沙子, 千賀信幸, 細見健二, 馬越, 三輪浩司, 山本剛史, 他 Hyperball-J.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
The ALICE Experiment Event by Event fluctuations ALICE TOF Calibration 30th November 2007Chiara Zampolli1.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
17 December 2009J. Schukraft1 First Physics at the LHC seen through the eyes of ALICE.
Claudia Strabel, ETH Zurich SPS Annual Meeting June 21 – 22, 2010 Hadro-production measurements for T2K with NA61/SHINE at the CERN SPS.
QM2002 (July / / Nantes / France)Susumu SATO (JSPS) for the PHENIX collaboration page 1 Susumu SATO Japan Society for the Promotion of Science,
Fall DNP Meeting,  meson production in Au-Au and d-Au collision at \ /s NN = 200 GeV Dipali Pal Vanderbilt University (for the PHENIX collaboration)
Introduction of my work AYAKO HIEI (AYA) Hiroshima Univ 2008/5/30 me.
1 CERN April 19, 2012 NA61 status and other issues Other issues NA61 status and plans.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
1 M. Gazdzicki, Frankfurt, Kielce for the NA61 Collaboration Onset of Deconfinement and Critical Point: Nucleus-Nucleus Program of NA61/SHINE Fundamentals.
1 NA61/SHINE Collaboration Metting, Dubna, April 7-11, 2014 NA61/SHINE news and plans (October 2013-February 2014) Published papers: Measurements of production.
1 NA61/SHINE: Status and Data taking with ion beams Proposal: CERN-SPSC , SPSC-P-330 (November 3, 2006) LoI: CERN-SPSC , SPSC-I-235 (January.
NA61/SHINE run schedule/plans:
First collisions in LHC
Time-zero evaluation using TOF, T0 and vertex detectors
Di-electron elliptic flow in
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
The PSD at Pb-Pb run PSD drawbacks at Ar beam
NA61 news and plans (May 2013-October 2013) Publications:
NA61 revised beam request
Status Report Fenfen An
Preparation for CERN test beam
SPSC123 Summary Lau Gatignon/EN-EA IEFC, 4 November 2016.
NA61 news and plans Progress in 2010 Revised data taking
Success of the first NA61 run
NA61 news and plans News from other labs/experiments
NA61 news and plans (October 2012 – May 2013)
PHENIX Measurement on High pT h-h and g-h Azimuthal Correlations
Further Information Requested in
NA61/SHINE: hadron production in p+p/A and A+A interactions at the CERN SPS Antoni Marcinek (Jagiellonian University) for the NA61 collaboration Layout:
of secondary light ion beams
of secondary light ion beams
F.Guber, A.Ivashkin INR, Moscow
NA61/SHINE: status and energy scans with Pb+Pb collisions
NA61 news and plans Results, results, results ... π- + C → h- + X
NA61 status and plans Preliminary spectra for T2K 2009 run
STAR Geometry and Detectors
Quarkonium production in ALICE
Study of hadronic resonances in the ALICE experiment
Open heavy flavor analysis with the ALICE experiment at LHC
Tatsuya Chujo for the PHENIX collaboration
Commissioning of the ALICE-PHOS trigger
Tatsuya Chujo University of Tsukuba (for the PHENIX Collaboration)
The Study of Elliptic Flow for PID Hadron at RHIC-PHENIX
Beam-time, June 2009 Beam-time, Oct days of beam time
for the PHENIX collaboration
Jet Measurements with the EMCal of ALICE
Geant4 in HARP V.Ivanchenko For the HARP Collaboration
High-pT Identified Charged Hadrons in √sNN = 200 GeV Au+Au Collisions
One PeV Collisions Very successful Heavy Ion run in 2015, with all new detectors in operation 16 GB/s readout/ 6GB/s on disk after HLT compression.
Quarkonium production in p-p and A-A collisions: ALICE status report
Identified Charged Hadron
Search for the onset of baryon anomaly at RHIC-PHENIX
Identified Charged Hadron Production at High pT
Masahiro Konno (Univ. of Tsukuba) for the PHENIX Collaboration Contact
Beam-time, June 2009 Beam-time, Oct days of beam time
Presentation transcript:

András László (for the NA61/SHINE Collaboration) NA61 Status and Plans (report on September 2009 – September 2010 period) András László (for the NA61/SHINE Collaboration) 28 September 2010 SPSC Meeting, CERN

Outline Introduction Detector and beamline upgrades 2009 beam period Software development Calibration of 2009 data Data analysis Data taking plans Summary 28 September 2010 SPSC Meeting, CERN

Introduction NA61 is a large acceptance hadron spectrometer experiment. Main physics goals are to measure: Reference hadron spectra in p+C for T2K experiment. Reference hadron spectra in π-+C for the Pierre Auger Obs. High pT physics in p+p, p+Pb. Fluctuactions in ion-ion for CP&OoD in strong interactions. 28 September 2010 SPSC Meeting, CERN

Detector and beamline upgrades Recent upgrades are mainly motivated by ion runs. New BPD-s and shapers to perform in higher intensity (done). A-detector (TOF) constructed for secondary beam diagnostic (done). Z-detector (Cherenkov) is developed for secondary ion trigger (2010). He beam pipe into TPC-s to reduce δ-electron contribution: design ready, model being tested at CERN. Installation in 2011. Projectile Spectator Detector (PSD) for ion runs: 16 modules for central part finished, assembly of the peripheral modules ongoing at CERN. Energy resolution of 55%/√E confirmed by test beam. Full assembly forseen in the beginning of 2011. FEE integrated into NA61 DAQ, in production. 28 September 2010 SPSC Meeting, CERN

Also upgrade of beamline is necessary. Change of H2 beamline to fragment separator (activity lead by Ilias Efthymiopoulos at CERN-EN-MEF, 2010). 28 September 2010 SPSC Meeting, CERN

2009 beam period (data taking period 16 July – 14 November 2009) T2K p+C and p+(T2K Replica Target) at 31 GeV/c. π-+C at 158 and 350 GeV/c for the Pierre Auger Observatory. p+p at 20, 30, 40, 80 and 158 GeV/c for ion-program. p+p at 10 GeV/c not recorded: poor stability and identification. 40M events recorded, for 3 physics programs. p+C @ 31 GeV/c π-+C @ 350 GeV/c p+p @ 20 GeV/c 28 September 2010 SPSC Meeting, CERN

2010 beam period (data taking period 19 July – 25 October 2010) High statistics T2K p+(T2K RT) at 31 GeV/c (about 10M). Pilot p+p at 13 GeV/c for ion-program (better PID by CEDAR-W). p+p at 158 GeV/c being taken for high pT physics (about 20M by September 17, about 45M is expected with extrapolation). Additional data/tests: PSD testbeam at PS-T10. 83Kr data was taken during MD for TPC calibration (about 14M). PSD beam test is planned for 19-21 November. Pb fragmentation beam test for 13, 20 and 80 GeV/c 11B beam is planned for 22-28 November. Data taking rate: Nominal 1.1M/day, effective 0.85M/day, Σ-ed duty factor 85%. Great thanks to accelerator and NA61 crew. 28 September 2010 SPSC Meeting, CERN

cumulative duty factor ~ 85% p+p @ 158 GeV/c [20M] 83Kr calibration rate ~ 0.85M/day cumulative duty factor ~ 85% p+p @ 158 GeV/c [20M] 83Kr calibration [14M] p+(T2K RT) @ 31 GeV/c [10M] p+p @ 158 GeV/c p+p @ 13 GeV/c pilot comissioning 28 September 2010 SPSC Meeting, CERN

Software development Migration to the new CERN-supported SVN repository (done). Migration to a new MySQL-based DB (done). Migration of the software project to SLC5 platform (ongoing). Virtualization of the NA61 software on CernVM (ongoing). Further development of the NA61 software/data preservation approved by PH, support of PH-SFT group was granted. (1 Project Associate supported by CERN directorate.) 28 September 2010 SPSC Meeting, CERN

Calibration of 2009 data 2009: revised calibration strategy. (Higher available statistics, precision of drift velocity measurement is lower than required.) Drift velocity calibration (done). TPC time offsets correction (done). Detector positions measurements and correction (in progress). TPC ionization response correction (to be done). TOF calibration (to be done). 28 September 2010 SPSC Meeting, CERN

Data analysis Preliminary spectra of π+ in p+C at 31 GeV/c released and reported at conferences in 2010. Data being used by T2K. Paper on π± spectra forseen by the end of 2010. (See: Alessandro Bravar's talk.) Methods to introduce p+C data in T2K and C.R. experiments simulation advanced. (See: Alessandro Bravar's talk.) 28 September 2010 SPSC Meeting, CERN

Methods to correct event-by-event fluctuation data for various effects, in particular for non-target contribution has been developed. Tested on uncalibrated p+p at 20, 30, 40, 80 and 158 GeV/c. Full – empty target subtraction has to be done on the moments of event-by-event distributions. Tests on uncalibrated p+p show that this contribution is much smaller than fluctuations expected by prescence of critical point. 28 September 2010 SPSC Meeting, CERN

Data taking plans (preliminary: 2010 physics run not finished, November test not yet performed) Stop of SPS beam in 2012 and considered reduction of duty cycle will have a negative impact on NA61. To minimize this, NA61 proposes the following measures: Convert the second test of 11B beam in 2011 to physics run with 11B+C at 13, 20, 30, 40, 80 and 158 GeV/c. (60 days of Pb.) (Discussed with Stephan Maury, CERN-BE.) Establish primary ion beam preparation schedule, which would allow 48 days Ar primary beam for physics in 2013 and 48 days Xe primary beam in 2014. High pT p+p at 158 GeV/c in 2011 should be completed (30 days of p). p+Pb at 158 GeV/c for high pT may have to be shifted to 2013. 28 September 2010 SPSC Meeting, CERN

Impact on CP&OoD physics: NA61 proposal (assuming 25% duty cycle etc.): 2M central events for multiplicity, pT fluctuations; inclusive hadron yields & spectra; multistrange hadron yields. 4M minimum-bias events for elliptic flow; centrality dependence of multiplicity fluctuations. September 2010 SPSC (assuming 5% duty cycle etc.): 1M central for multiplicity, pT fluctuations; inclusive light hadron yields & spectra. Basic CP&OoD measurements can be still performed. Negative impact: no measurements of elliptic flow, no centrality dependence of multiplicity fluctuations; limited measurements of heavy (e.g. multistrange) hadrons. 28 September 2010 SPSC Meeting, CERN

Scaled variance of multiplicity distribution: 0.5% (stat), 3% (syst), For 1M central events: Scaled variance of multiplicity distribution: 0.5% (stat), 3% (syst), 30% (CP effect). pT fluctuations: 0.3 MeV/c (stat), 1 MeV/c (syst), 5 MeV/c (CP effect). Ξ+ measurements very limited: 2M events 28 September 2010 SPSC Meeting, CERN

PRELIMINARY 28 September 2010 SPSC Meeting, CERN

Summary BPD upgrade, A-detector done. Z-detector, He beam pipe, PSD being done. Upgrade of H2 beamline ongoing. 2009: p+C @ 31 GeV/c for T2K, π-+C @ 158, 350 GeV/c for CR. p+p @ 20, 30, 40, 80, 158 GeV/c for CP&OoD. 2010: p+C @ 31 GeV/c for T2K. Pilot p+p @ 13 GeV/c for ions. p+p @ 158GeV/c for high pT. Testbeams in November. Significant progress with software development, calibration of 2009 data and physics analysis. Due to 2012 stop at CERN: beam schedule needs to be revised. Request of physics with 11B (2011), Ar and Xe (2013, 2014). 28 September 2010 SPSC Meeting, CERN

Backup slides 28 September 2010 SPSC Meeting, CERN

Calibration of 2009 data The calibration of NA61 data goes with the following steps: Direct measurement of TPC drift velocities + smoothing. √ Residual drift velocity calibration from data. √ Direct measurement of TPC time offsets channel-by-channel. √ Detector-wise time offset correction from data. √ Direct measurement of detector positions. √ Data based corrections to detector positions. √ Residual correction to detector points from data. Residual correction to the magnetic field from data. Channel-by-channel measurement of TPC response. Data based corrections to TPC response (dE/dx calibration). Data based corrections to TOF response (ToF calibration). √: done for 2009 data 28 September 2010 SPSC Meeting, CERN

PID for p+p @ 13 GeV/c π+ p (~6%) K+ 28 September 2010 SPSC Meeting, CERN

28 September 2010 SPSC Meeting, CERN

28 September 2010 SPSC Meeting, CERN