MWPC prototyping and testing of STAR inner TPC upgrade

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

1 Jim Thomas - LBL A Brief Introduction to the STAR Time Projection Chamber Jim Thomas Lawrence Berkeley National Laboratory June 4 th, 2009.
D. Peterson, “Measurements of GEM electron and ion transmission…”, Valencia LC Workshop, Measurements of GEM electron and ion transmission.
E/π identification and position resolution of high granularity single sided TRD prototype M. Târzilă, V. Aprodu, D. Bartoş, A. Bercuci, V. Cătănescu, F.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Timing Properties of T0 Detectors At PHOBOS Saba Zuberi, Erik Johnson, Nazim Khan, Frank Wolfs, Wojtek Skulski University of Rochester.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
JLC CDC The total numbers of wire : The total wire tension : 50 t Material : outer cylinder mm thick CFRP end-plates mm thick aluminum.
Status of PNPI R&D for choice of the MUCH tracking base detector (this work is supported by INTAS) ■ Introduction ■ MICROMEGAS ■ GEM ■ MICROMEGAS+GEM ■
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
15 th CBM collaboration meeting, GSI, Darmstadt, Germany, April 12-16, 2010Wang Yi, Tsinghua University R&D status of low resistive glass and high rate.
RESEARCH POSTER PRESENTATION DESIGN © The RHIC Beam Energy Scan (BES) was proposed to search for the possible critical.
Progress with the TPC gas monitor Dariusz Antończyk Outline : Motivation Simulations Measurements Summary & Outlook.
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
David Emschermann CBM Collaboration Meeting - GSI – 12/04/2010 TRD geometry in CBMroot and conclusions for detector module design David Emschermann Institut.
 Production at forward Rapidity in d+Au Collisions at 200 GeV The STAR Forward TPCs Lambda Reconstruction Lambda Spectra & Yields Centrality Dependence.
GEM detector development at VECC Anand Dubey. 2-GEM detector tested with source symmetric mode of biasing scheme, (i.e. same voltage across both the GEMS)
TPC R&D status in Japan T. Isobe, H. Hamagaki, K. Ozawa, and M. Inuzuka Center for Nuclear Study, University of Tokyo Contents 1.Development of a prototype.
Victor Ryabov (PNPI) for the PHENIX Collaboration QM2005 Budapest Aug,06, First measurement of the  - meson production with PHENIX experiment at.
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
TPC in Heavy Ion Experiments Jørgen A. Lien, Høgskolen i Bergen and Universitetet i Bergen, Norway for the ALICE Collaboration. Outlook: Presenting some.
Energy Scan of Hadron (  0 ) Suppression and Flow in Au+Au Collisions at PHENIX Norbert Novitzky for PHENIX collaboration University of Jyväskylä, Finland.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Taku Gunji Center for Nuclear Study The University of Tokyo
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Jonathan BouchetBerkeley School on Collective Dynamics 1 Performance of the Silicon Strip Detector of the STAR Experiment Jonathan Bouchet Subatech STAR.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
CLAS12 Drift Chamber Prototyping
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
To measure 0, mechanical oscillations of the wire to be tested are induced by applying a periodic high voltage (about 900 V) with a frequency of 300 ÷
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Construction and beam test analysis of GE1/1 prototype III gaseous electron multiplier (GEM) detector V. BHOPATKAR, E. HANSEN, M. HOHLMANN, M. PHIPPS,
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
A.Ochi Kobe University MPGD2009 Crete 13 June 2009.
September 2007SLAC IR WS Very Forward Instrumentation of the ILC Detector Wolfgang Lohmann, DESY Talks by M. Morse, W. Wierba, myself.
Development of a Single Ion Detector for Radiation Track Structure Studies F. Vasi, M. Casiraghi, R. Schulte, V. Bashkirov.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
Gossip : Gaseous Pixels Els Koffeman (Nikhef/UvA) (Harry van der Graaf, Jan Timmermans, Jan Visschers, Maximilien Chefdeville, Vladimir Gromov, Ruud Kluit,
R&D activities on a double phase pure Argon THGEM-TPC A. Badertscher, A. Curioni, L. Knecht, D. Lussi, A. Marchionni, G. Natterer, P. Otiougova, F. Resnati,
June 4, 2009 STAR TPC review Estimation of TPC Aging Based on dE/dx Measurements Yuri Fisyak.
Max Chefdeville, NIKHEF, Amsterdam
Status of BESIII and upgrade of BESIII
The PSD at Pb-Pb run PSD drawbacks at Ar beam
FEE for TPC MPD__NICA JINR
(On Behalf of CMS Muon Group)
Dept. of Physics and Space Sciences, Florida Institute of Technology
Development of X-band 50MW klystron in BVERI
Entrance Muon Counter (EMC)
Saikat Biswas, A. Abuhoza, U. Frankenfeld, C. Garabatos,
Hybrid MPGD based photon detector, R&D update.
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
BoNuS: Radial-Drift TPC using Curved GEMs
STAR Time-Projection Chamber
Production of Cesium Iodide Photocathodes for
Potential Ion Gate using GEM: experiment and simulation
TPC Paul Colas Technical meeting, Lyon.
Conceptual design of TOF and beam test results
Development of Gas Electron Multiplier Detectors for Muon Tomography
STAR TOF MRPC Mass Production & Q.C. (USTC)
Performance of MDC during New Data Taking
Institute of Particle Physics Huazhong Normal University
Pre-installation Tests of the LHCb Muon Chambers
(On Behalf of CMS Muon Group)
A DLC μRWELL with 2-D Readout
Presentation transcript:

MWPC prototyping and testing of STAR inner TPC upgrade Shuai Wang, Shandong University for the STAR collaboration p PANIC 2017,Beijing September , 2017 PANIC2017 3/09/2017

Upgrade motivation of iTPC Upgrade components of iTPC Outline Upgrade motivation of iTPC Upgrade components of iTPC iTPC MWPC prototyping iTPC MWPC test with 55Fe X-ray Summary and Outlook PANIC2017 3/09/2017 Shuai Wang

RHIC Beam Energy Scan(BES) RHIC-BES key objective Mapping the features of the QCD phase diagram. Physical mechanism Heavy ion collisions allow to explore the QCD phase structure by varying the collision energy. RHIC-BES program (I->II) Goals Turn-off of QGP signatures Search for critical point First order phase transition Schedule BES-I completed 2010~2014 BES-II in 2019~2020 It Need detailed study of the key region. PANIC2017 3/09/2017 Shuai Wang

Why to upgrade STAR iTPC Inner TPC upgrade: Increase inner sector pad coverage from 20% to 100% Extend TPC acceptance from |η|<1 to |η|<1.5 Lower pT measured minimum limit from 125MeV/c to 60 MeV/c Improve the dE/dx resolution from 7.5% to 6.5% (|η|<1) PANIC2017 3/09/2017 Shuai Wang

STAR TPC geometry STAR-TPC,NIM A499(2003)659 Outer sector Inner sector PANIC2017 3/09/2017 Shuai Wang

iTPC MWPC upgrade content Produce and replace all 24 inner sectors Increase readout channels Renew all three wire frames New electronics for inner sectors Pad coverage 20%->100% Gain uniformity better than 10% Detection efficiency >98% PANIC2017 3/09/2017 Shuai Wang

iTPC MWPC production procedure PCB bonding Wire mounts installing Pining wire mounts Mounting wires Epoxying wires Soldering wires PANIC2017 3/09/2017 Shuai Wang

Wire winding for MWPC Anode wires: Shield wires: Gated grid: gold-plated tungsten wires 20um diameter, tension 0.5N accuracy requirement:±0.03N Shield wires: gold-plated beryllium copper wires 75um diameter, tension 1.2N Gated grid: Why wiretension is so important May influence the uniformity of the gain Prevent the wire vibration under high voltage Three layers of wire for MWPC Winding machine at SDU PANIC2017 3/09/2017 Shuai Wang

Wire tension measurement system By the fast Fourier analysis program FFT , the fundamental frequency f is extracted from the vibration signal When the length of wire L and linear density ρ are known, the wire tension can be calculated by the formula :T=4 ρ f2L2 PANIC2017 3/09/2017 Shuai Wang

Anode wire tension test result Some test results of wire tension Anode wire tension test result Xu Wang,Fuwang Shen,Shuai Wang,Cunfeng Feng,Changyu Li,Peng Lu,Jim Thomas, Qinghua Xu,Chengguang Zhu NIM 859(2017),page 90-94. “Design and implementation of wire tension measurement system for MWPCs used in the STAR iTPC upgrade” Measurement uncertainty: <1% Meet the tension accuracy requirements 0.5±0.03N. PANIC2017 3/09/2017 Shuai Wang

Wire pitch and height control Wire comb and pitch control Wire pitch and height control schematic diagram PANIC2017 3/09/2017 Shuai Wang

Testing system for iTPC at SDU Cooling fan for FEEs and RDO boards Temperature transmitter Pressure transmitter Amplifier + MCA Temperature and pressure transmitter Amplifier + MCA Radioactive source 55Fe X-ray transmission window 100 um PCB with graphite coating PANIC2017 3/09/2017 Shuai Wang

55Fe spectrum of a single wire Anode voltage: 1120V P10(Ar:CH4 = 9:1) Gas pressure: +2mbar Temperature: 27.3℃ Amplifier: A225+A206 MCA Data Total rate: ~2077 Gas gain: 2700 Energy resolution(FWHM): ~20% Main Peak Escape Peak PANIC2017 3/09/2017 Shuai Wang

Correcting temperature and pressure dependence Gain=ec0+c1T/P Wire number:98th Data collected in 10 days Gas gain versus : Gain=ec0+c1T/P Correction set:T=25℃ P=1013mbar Gas gain variation: before correction=17.7%, after correction=4.8% Measuring accuracy: ΔT= ± 0.05℃ ΔP= ± 0.05mbar Data for 180 hours Measuring accuracy: ΔT= ± 0.05℃ ΔP= ± 0.05mbar Data for 180 hours PANIC2017 3/09/2017 Shuai Wang

Gas gain uniformity Scan time : last 1 day Before correction 8.6% After correction 6% Scan time : last 1 day The gain are corrected to 25℃, and the pressure corrected to 2mbar above the standard atmospheric pressure. Gain variation:6%(Max-Min),1%(RMS) PANIC2017 3/09/2017 Shuai Wang

Anode voltage scan Measured gain under different anode voltage Gain Vs HV follow the exponential distribution The peak position ratio of main peak to escape peak decrease from1.95 to 1.65 Temperature: 25.3℃-25.8℃ PANIC2017 3/09/2017 Shuai Wang

Thanks! Summary and Outlook iTPC mass production for STAR started in June 2017,and it is expected to be finished in August 2018 on schedule. Winding machine, Wire tension measurement system,and the test system for iTPC has been set up. Wire tension and other technical parameters all meet the requirements. The iTPC performance test with 55Fe for the first two sectors are completed. The uniformity met the requirement too. Thanks! PANIC2017 3/09/2017 Shuai Wang