CJK 10th NGN-WG (Follow up IPTV-GSI) Chae Sub, Lee

Slides:



Advertisements
Similar presentations
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Advertisements

GSC: Standardization Advancing Global Communications NGN-GSI TSR (Technical and Strategic Review) Chae Sub Lee, Dick Knight NGN-GSI TSR Coordinators SOURCE:ITU-T.
INTERNATIONAL TELECOMMUNICATION UNION Document 27 – E TELECOMMUNICATION STANDARDIZATION SECTOR TSB Directors Consultation Meeting on IPTV standardization.
The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN WG (IP-TV Ad-Hoc Group) Chae Sub Lee
International Telecommunication Union D3 Methodology Objectives for this meeting from Chairman of WG-A Yoh Somemura (NTT, Japan) Vice Chairman of FG on.
DOCUMENT #:GSC15-PLEN-33 FOR:Presentation SOURCE:ITU-T AGENDA ITEM:2.1 ITU-T IPTV GSI Standards and IPTV Forums/Consortia.
The 6th CJK IT Standards Meeting April 10 ~ 12, 2006, Hangzhou, China CJK IT Standards Meeting (Collaboration of Security Activity between CJK On NGN and.
Geneva, Switzerland, 4 December 2014 ITU-T Study Group 17 activities in the context of digital financial services and inclusion: Security and Identity.
DOCUMENT #:GSC15-GTSC-05 FOR:Presentation SOURCE:ITU-T AGENDA ITEM:4.1 NGN, Testing specification and Beyond Chaesub.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ITU-T Focus Group on Cloud Computing Olivier Colas, ITU-T FGCC Vice-Chairman Document No: GSC16-PLEN-45.
NGN Management Focus Group 2 November 2004 Dave Sidor Interim Chairman Nortel Networks Tel Fax
Status of Collaborative Team work on H.IDscheme, H.ID-RA and H.IRP Chiaki Ishikawa (TTC)
1 CJK9, Zhangjiajie, China NID-related activities in ITU-T Document number Zhangjiajia, China 8-10 April 2009 Hyoung Jun KIM, Jun Seob LEE
The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN WG (IP-TV Ad-Hoc Group) Chae Sub Lee
1 Status Report on CJK NGN Working Group China Communications Standards Association 9 th CJK meeting April 2009 HeyuanXu, Chairman of NGN-WG.
Outputs from APT, RCC and Arab Regions WTSA preparatory events ITU Americas Region Preparatory Meeting Buenos Aires, Argentina, May 2012 Paolo Rosa.
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
CJK Standards Collaboration - Brief overview of CJK NID WG HyoungJun Kim Telecommunications Technology Association.
The 6th CJK IT Standards Meeting April 10 ~ 12, 2006, Hangzhou, China CJK IT Standards Meeting (Collaboration of Security Activity between CJK On NGN and.
Recent Results of JCA-NID and TSAG Byoung Nam LEE HyoungJun KIM ETRI, Korea.
Standardization activities on IPTV in CCSA CCSA DOCUMENT #:GSC13-PLEN-25 FOR:Presentation SOURCE:CCSA AGENDA ITEM:Plenary; 6.6
The 16th CJK NGN-WG Meeting July 22 ~ 24, 2009, Beijing, China 16 th CJK NGN-WG (Standardization on DSN and Future Direction ) Shin-Gak Kang
DOCUMENT #:GSC15-PLEN-79 FOR:Presentation SOURCE:TTC AGENDA ITEM: GSC Plenary 6.10 GTSC 4.1 NGN interoperability -
History and Summary of N-ID Activities in ITU-T Yong-Woon KIM HyoungJun KIM ETRI, Korea.
Working Structure and methods for CJK N-iDs Working Group Chae Sub TTA, Korea.
Review of new Question descriptions under ITU-T SG11
ITU-T Focus Group on Cloud Computing
Chae-Sub LEE TTA Summary Report of 6th FG NGN Chae-Sub LEE TTA
Proposal for study scope of CJK IPTV-adhoc group
Status report on CJK NGN Working Group
IPv6 based NGN and after (Use of NGNv6) March 31 – April 2, 2008
Global Standards Collaboration (GSC) GSC-15
Report of 19th UNIOT-WG Meeting
20th CJK UNIOT-WG (Standardization of Mobile IPTV in ITU-T)
Kangchan lee 20th CJK UNIOT-WG (Current Status of Cloud Computing Standardization Acuities in ITU-T) - Update of CJK-UNIOT Kangchan.
CJK 10th NGN-WG (Status of NGN/NID-WG Discussion) Chae Sub, Lee
Consideration on CDF TTC 31 March - 2 April 2008.
Status report on CJK NGN Working Group
CJK 10th NGN-WG (Preparation for the next SG13) Chae Sub, Lee
Current Situation of F.MID and H.MID in ITU-T SG16
IPTV Standardization and Services in Japan
CJK NGN WG (Proposal for drafting group on IPTV Standards)
Standardization activities on IPTV in CCSA
ITU-T Study Group 13 Multi-protocol and IP-based networks and their internetworking Brian Moore.
Review of ITU activities since GSC-10 (08/05)
NGN interoperability - TTC activities in ITU-T -
Networked Vehicle in NGN
ITU-T IPTV GSI Standards and IPTV Forums/Consortia Activities
Global Standards of IPTV and its infrastructural framework
Recent IPTV standardization and business model in Japan
September 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG 7a Closing report for September 2014]
Global Collaboration on Future Network Standardization
GSC: Standardization Advancing Global Communications
December 6, 2017 ITU-T SG16 Liaison Officer to CITS Yushi Naito
September 2013 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG SRU Closing report for September 2013]
Global Collaboration on Future Network Standardization
Global Collaboration on Future Network Standardization
ITU-T IPTV standards development
NGN 2004 Project status on July 25
November, 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for November 2015]
Charles KIM TTA Collaboration Plan for CJK NGN Charles KIM TTA
Roles and Functions of CJK NGN WG for NGN Standardization Chae-Sub LEE
Martin Euchner, Advisor, ITU-T Study Group 17
GTSC-4 Chair: Anil Kripalani Secretary: Henry Cuschieri
ITU-T Focus Group Next Generation Network
The CJK IT Standards Meeting July 5~7, 2004, Seoul, Korea
Standardization activities on IPTV in Korea
Networked Vehicle in NGN
Chae-Sub LEE TTA Future Collaboration of CJK NGN-WG Chae-Sub LEE TTA
Hans, KIM TTA Future of NGN Standards - FG NGN and SGs - Hans, KIM TTA
Presentation transcript:

Chae Sub, Lee Chae-sub.lee@ties.itu.int CJK 10th NGN-WG (Follow up IPTV-GSI) Chae Sub, Lee Chae-sub.lee@ties.itu.int Telecommunications Technology Association

Contents Future plan after the FG IPTV Proposed Plan for the IPTV-GSI CJK Views

1. Future Plan of FG IPTV Finalization Plan for FG IPTV (COM13-R32) May 2007 Full Focus Group meeting to progress Output Documents and agree this work plan with the Focus Group July 2007 Full Focus Group meeting – last meeting for the acceptance of new material into Service Requirements and Architecture doc. July – Sep. Review period for Service Requirements and Architecture doc. Sep. 2007 NGN-GSI reviews deliverables and transfers final comments to the Focus Group October 2007 Full Focus Group meeting; Final review and approval of Service Requirements and Architecture documents. Last meeting at which new material will be accepted for all other documents Oct – Dec. 2007 Review period for remaining documents. Requirements and Architecture team to work on Gap analysis December 2007 Full Focus Group meeting; Final review and approval of all documents. Final report and documents submitted to SG13 for review and approval January 2008 SG13 reviews final report, allocates deliverables for ongoing work within SG13 and other SGs according to IPTV-JCA plan

1. Future Plan of FG IPTV Future Plan for FG IPTV Deliverables FGWG Document number Title Target Q/SG [Note 1] Associated Q/SG [Note 2] Approving SG [Note 3] 1 FG IPTV-DOC-0114 IPTV services requirements Q2/13  SG11, Q9/9, Q22/16, Q9/17, Q12/17 SG13 FG IPTV-DOC-0115 IPTV architecture Q3/13  Q9/9, Q21/16, Q9/17 FG IPTV-DOC-0116 Service scenarios for IPTV Q1/13  Q9/9, Q8/13, Q2/13, Q22/16, Q12/17 FG-IPTV-DOC-0117 Gap analysis [Note 5] 2 FG IPTV-DOC-0118 Quality of experience requirements for IPTV SG12 Q2/9,Q4/13, Q24/16 [Note 6] deleted FG IPTV-DOC-0119 Traffic management mechanism for the support of IPTV services Q4/13  SG11 FG IPTV-DOC-0120 Application layer reliability error recovery mechanisms for IPTV Q23/16 SG12, Q4/13, Q14/17 SG16 [Note 6] FG IPTV-DOC-0121 Performance monitoring for IPTV Q14/9, Q4/13, Q24/16, Q14/17 [Note 6] deleted 3 FG IPTV-DOC-0122 IPTV security aspects  SG17 Q3/9, Q15/13, Q13/16, Q25/16, SG17 Note 1: This is the question / study group that will lead the ongoing work on the deliverable. Note 2: These are the questions / study groups also interested in the work. Note 3: This is the SG that will handle the approval of the recommendation(s) resulting from the FG deliverable Note 4: To be decided which SG should lead the work and handle the approval of recommendation(s) resulting from the FG deliverable. Only one SG can do this but it can be done in association with other SGs. Note 5: To be allocated. Note 6: To be confirmed

1. Future Plan of FG IPTV Future Plan for FG IPTV Deliverables FGWG Document number Title Target Q/SG [Note 1] Associated Q/SG [Note 2] Approving SG [Note 3] 5 FG IPTV-DOC-0125 Aspects of IPTV end system – terminal device Q13/16  Q5/9 SG16 FG IPTV-DOC-0126 Aspects of home network supporting IPTV services Q21/16  Q10/9, Q9/17 [Note 6] deleted 6 FG IPTV-DOC-0127 Working Document: IPTV Middleware, Applications, and Content Platforms Q4/9, Q13/16 [Note 4] Q2/13 FG IPTV-DOC-0128 Working Document: Toolbox for Content Coding Q23/16 FG IPTV-DOC-0129 Working Document: IPTV Middleware FG IPTV-DOC-0130 Working Document: Service Navigation System FG IPTV-DOC-0131 Working Document: IPTV Metadata Q9/17, Q10/17 FG IPTV-DOC-0146 Working Document: IPTV Multimedia Application Platforms Q4/9, PL FG IPTV-DOC-0132 IPTV vocabulary of terms [Note 5]  

2. Proposed Plan for the IPTV-GSI Overall direction from SG Chairmen’s meeting September ITU-T SG Chairmen meeting agreed to adopt the arrangements that we have put in place for the NGN work and to use these for the coordination and planning of the IPTV work during 2008 Agreed to establish an IPTV GSI and set up an IPTV TSR (to be coordinated by Ghassem Koleyni). The IPTV-JCA will be expanded to include representatives from other SDOs who have been involved in the IPTV Focus Group. The roles and functions of the IPTV-JCA and the IPTV TSR will be modelled on those we have established for the NGN work. The first IPTV GSI event will be held in association with the January NGN GSI event and study group meetings in Korea. Three further IPTV GSI events are provisionally planned for 2008 in association with the Study Group 9 and Study Group 16 meetings in April, the NGN GSI event in September and the Study Group 15 meeting in December.

2. Proposed Plan for the IPTV-GSI Proposed Overall Time plan for IPTV-GSI Meeting Option Date Place Coinciding with the meeting of First Confirmed 15 - 22 January Seoul (Korea) NGN-GSI event SGs 11, 13 & 19 Second *1 30 April – 7 May Geneva SGs 9 & 16 2 22 – 29 April SG 16 3 5 - 9 May SG9 4 12-16 May Not Yet (Geneva) Third 1 – 5 September 8 - 12 September Forth 1 – 5 December SG15

3. CJK Views Relationship between IPTV-GSI and NGN-GSI? Relationship FG IPTV deliverables and NGN Recommendations and drafts? How to handle new work items on IPTV (beyond FG IPTV deliverables)? How to handle IPTV FG deliverables into Recommendation: as they are or possibly combined with other drafts? Any others?