CERN Testbeam facilities

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

Lau Gatignon, EATM, 7 October  The T9 and T10 lines have been running smoothly from mid July and the T11 beam started up very smoothly for CLOUD.
Test Beams Around the World (well, a very small world…) CERN (transparencies from Horst Breuker from CERN AIDA meeting) DESY (transparencies from Norbert.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 17, 2011.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Horst Breuker AIDA March, WP6 TA to Testbeams and Irradiation at CERN AIDA units : 600 in Testbeams; 200 in Irradiation Facility; 1 unit = 1 day;
Irradiation Facilities at CERN for RD-51 Micro-Pattern Gas Detectors (RD-51) Workshop Nikhef, Amsterdam, April Mar CAPEANS CERN.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
The East Area Rende Steerenberg, ps/op PS-Days 2001 Evian.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 111 Middle-Long Term Needs for Ion Beams S.Maury Thanks to T. Bohl, C. Carli, D.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
STATUS REPORT WP7 Facilities and Component Analysis for Detector R&D Activities and Status Resources and Expenditures Work plan Mar CAPEANS 3/11/08 M.C.
CERN Test Beam Update and Schedule
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.
M.Moll, M.Silari, H.Vincke – 3.April Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN:
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN: mainly LHC related topics CERF: beside LHC topics.
NBI2006 Starting OPERA data-taking with the CNGS beam D.Autiero IN2P3/IPN Lyon 5/9/2006.
DAMPE has successfully completed 3 weeks of test beam campaign – 2 weeks in the PS T9, 1 week in SPS H4 – ~60 people participated in the setup and data.
Overview on the Proposal for a new GIF, August Page 1 Overview on the Proposal for a new GIF Summary of the document distributed to the users and.
Breuker Feb Overview of future East Area Programme T8 : 24 GeV/c (primary protons) 2-3 x 10**11 per PS cycle; T9 (new) : 15 GeV/c 10**6 per spill;
Test Beams: Availability & Plans  KEK  DESY  CERN  Fermilab  SLAC  Other Gene Fisk – Fermilab LCWS_2002 Jeju Do.
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
Fermilab Test Beam and Irradiation Facilities Erik Ramberg 10 January, 2013.
GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 22/08/12 Project #5R. Fortin PH-DT-DI1 Status of procurement:
30/4/2010Mar CAPEANSDT Steering Board meeting White Paper R&D WP7 Facilities and Component Analysis for Detector R&D.
GIF++ implementation Adrian Fabich, Sylvain Girod, Dorothea Pfeiffer, EN-MEF-LE GIF++ 3rd users’ meeting, 11th July 2013.
CERN accelerator chain (operating and approved projects)
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
Page 1 WP10.2: TA DESY- II Test Beam Facility AIDA-2020 First Annual Meeting Norbert Meyners, Marcel Stanitzki, Natalia Potylitsina-Kube DESY.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
An Idiot’s Guide to LHC Upgrades Bohr Lunch Seminar. 16/5/08 Terry Wyatt. University of Manchester.
SPSC recommendations [Installation at PS-T9] Baby MIND weekly meeting 28 th October 2015.
1 NA61/SHINE Collaboration Metting, Dubna, April 7-11, 2014 NA61/SHINE news and plans (October 2013-February 2014) Published papers: Measurements of production.
The Next Generation of a Gamma Irradiation Facility GIF++
Rachel Margraf Supervisor: Nikolaos Charitonidis
RD51 test facilities E. Oliveri (CERN) on behalf of RD51.
Bending crystals for magnetic and electric dipole moment measurements
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
NA61 news and plans (May 2013-October 2013) Publications:
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
Outlook by the Physics Coordinator
User schedule updates 67th EATM, H. Wilkens.
June 22, 2017 Burkhard Schmidt for the DT coordination team
CERN R&D plans and Infrastructures
WP8 – Improvement and equipment of irradiation beam lines
CERN Neutrino Project 26th November, 2013 M.Nessi.
Towards a Unified Environmental Monitoring,
SPSC123 Summary Lau Gatignon/EN-EA IEFC, 4 November 2016.
DESY Test Beam Facilities - Status and Plan
Test Beams: Availability & Plans
NA61 news and plans Progress in 2010 Revised data taking
NA61 news and plans News from other labs/experiments
Irradiation Facilities Questionnaire
Test beam setup: status report 10/02/2009
Performance of a Multigap RPC prototype for the LHCb Muon System
A summary of world-wide test beam facilities
2003 test beam with 25 ns bunched muons
Experimental Areas – LS2 planning
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Presentation transcript:

CERN Testbeam facilities H. Wilkens, CERN

ATLAS pixel team using EUDET Telescope Overview ATLAS pixel team using EUDET Telescope In H6 beamline Injector complex East Area: Testbeam facilities Irradiation facilities North Area: Beam lines. Heavy Ions Experimental magnets. GIF++ Next facilities. Scheduling.  Febraury 3rd, 2016 Henric Wilkens (CERN)

Test Beam Facilities at CERN North Area SPS Test Beams East Area PS Test Beams Febraury 3rd, 2016 Henric Wilkens (CERN)

The East Experimental Areas at the PS CLOUD T10 Alice, COMPASS, CMS,ATLAS… 3.6GeV/c, 150mrad 7GeV/c, 60mrad T9 Calice, ATLAS, CLICpix, CMS, LHCb, CBM, DAMPE,… 15GeV/c, 0mrad Protons 24GeV/c IRRAD proton irradiation CHARM Mixed field irradiation 2 beam lines for test beam: T9 and T10. T8 is used by the East Area irradiation facility. T11 is used for the CLOUD experiment, can eventually also be used. Febraury 3rd, 2016 Henric Wilkens (CERN)

East Area Beam Characteristics Momentum range Secondary beam: T9: 1GeV/c – 10(15) GeV/c T10: 1GeV/c – 7 GeV/c Particle type and intensity electrons, hadrons, muons max. 1-2*106 particles per spill typically 103 - 104 used Spill structure from PS 400ms spill length. Typically 1 spill every 18s (15bp), more on request. Febraury 3rd, 2016 Henric Wilkens (CERN)

East Area Irradiations The irradiation facility in T7 and the Dirac experiment in T8 have been dismounted. A new Irradiation facility has been built on the T8 beam line: 3 areas for proton irradiation, with automated tables, cooling (-15ºC), and cryogenic (1.8K) facilities available. Shuttle system. Mixed field irradiation in the downstream area (CHARM) Ready since October 2014. See presentation by Federico Ravotti earlier today Febraury 3rd, 2016 Henric Wilkens (CERN)

The North Experimental Areas at the SPS The SPS proton beam (400/450 GeV/c) slowly extracted to North Area Directed towards the three North Area primary targets T2, T4 and T6 From the primary targets: T2  H2 and H4 beam lines T4  H6 and H8 beam lines, and P42/K12 beam line (NA62) T6  M2 beam line (NA58/COMPASS) North Area Test Beam Facilities NA62 SPS beam COMPASS Febraury 3rd, 2016 Henric Wilkens (CERN)

North Area Test Beams Up to 4 user areas per beam line NA61 H2 H4 ATLAS, EuDET, SILC… H6 H8 Up to 4 user areas per beam line Possibility to take parasitic muons behind main user Some areas permanently occupied by LHC users (ATLAS, CMS, LHCb, TOTEM) Febraury 3rd, 2016 Henric Wilkens (CERN)

North Area Beam Characteristics Momentum range H2, H4, H8: 10 – 400 GeV/c (secondary beam) primary proton beam at 400 (450) GeV/c H6: 5 – 205 GeV/c Particle type electrons, hadrons, muons  secondary target tertiary beam Particle intensity max. 2*108 particles per spill Spill structure from SPS 4.8s – 9.6s spill length, debunched 1 spill every 14s – ~48s spill length/repetition frequency depend on number of facilities which need SPS extraction (CNGS, LHC) SFTPRO 3xCNGS LHC MD Febraury 3rd, 2016 Henric Wilkens (CERN)

Magnets Goliath EHN1, H4 beam line Large classical dipole 160x240x360cm 0.85T field Morpurgo EHN1, H8 beam line superconducting dipole 1.6m diameter, 4m length 1.5T field CMS M1 magnet EHN1, H2 beam line superconducting dipole 82 cm gap, 1.4m diameter 3.T field Febraury 3rd, 2016 Henric Wilkens (CERN)

EUDET telescope copies EUDET telescope was very successful, 5 built by DESY, sixth in the making: EUDET, the original one, commuting between DESY and CERN SPS-H6. ANEMONE, copy for Bonn, used there. ACONITE, copy for ATLAS used at CERN-SPS-H6, DESY, SLAC. DATURA, copy for DESY, at the TB21 area. CALADIUM, copy for Carlton, used at FNAL. DRYOPTERIS, copy being prepared for DESY. In AIDA-2020, an additional copy is being produced for the PS-T9/T10 beam lines. Also LHCb-TIMEPIX, Geneva FEI4, KarTel, Clicpix, EP-ADE telescopes, see with owners can be used. Henric Wilkens (CERN)

Ion beams 2013: Fragmented Ions, Pb in SPS, Be extracted to NA61. 2015: Ar run in February/March: 13, 19, 30, 40, 75, 150 A GeV/c Fragmented ion possible in H8. 2 weeks with Pb @ 30AGeV/c 2016: Pb 2017: Xe 2018: Pb Ion beams available also in H8 and will also be available in H4: Interest for use as testbeam for experiments like CALET (ISS), Medipix/Timepix, Nucleon (satellite experiments), …. There will be 4 weeks with Pb ions November/December 2016. Slow extraction NA61 program Febraury 3rd, 2016 Henric Wilkens (CERN)

New Gamma Irradiation Facility (GIF) Testing of LHC+ detectors In strong photon background Measuring muon signals shielding shielding shielding shielding Febraury 3rd, 2016 Henric Wilkens (CERN)

GIF is operational. December 2014 plus PH-DT: 0.55 MCHF GIF WA GIF in EHN1 Source material 137Cs (g 662 keV) Activity 0.6 TBq 14 TBq g-field(s) one two Irradiation area 30 m2 100 m2 plus PH-DT: 0.55 MCHF Febraury 3rd, 2016 Henric Wilkens (CERN)

Testbeams for Neutrino experiments Ready for beam Fall 2017 Febraury 3rd, 2016 Henric Wilkens (CERN)

Beamtime scheduling Request sent to PS/SPS physics coordinator: Requests <1week at SPS or <2weeks at PS agreed by coordinator. For longer beamtime, recommendation by cern committee needed (SPSC, LHCC, REC, RB). Scheduling according to priorities discussed with committee’s chairs. Draft schedules presented at Research Board for approval. Febraury 3rd, 2016 Henric Wilkens (CERN)

click here for how to apply CERN TA in 2016 2015 Overly successful: 22 groups supported, some for multiple visits. 131 stays a CERN were funded. 174kCHF spent, over 50% of the budget, in for of 138CHF per diem. click here for how to apply For the next years I will apply the following restrictions: 3 people max supported per group visit. Duration of stay supported: beam-time + 3 days max. Should allow to provide support in 2016 & 2017. Use the acknowledgment “The research leading to these results has been co-funded by the European Commission under the Horizon 2020 Research Infrastructures project AIDA-2020, Grant Agreement 654168.” in you publications. Informs us about your publications, for our reporting. 28/1/16 Henric Wilkens (CERN)

LHC schedule beyond LS1 Only EYETS (19 weeks) (no Linac4 connection during Run2) LS2 starting end 2018 21 months + 3months BC (Beam Commissioning) LS3 LHC: starting in 2024 => 30 months + 3 BC injectors: in 2025 => 13 months + 3 BC (30 month is SHiP experiment gets approved) [Longer Term LHC schedule] Run 2 LS 2 Run 3 LS 3 Run 4 LS 4 Run 5 LS 5 LHC schedule approved by CERN management and LHC experiments spokespersons and technical coordinators Monday 2nd December 2013 Febraury 3rd, 2016 Henric Wilkens (CERN)

Questions ?

Useful links PS & SPS Coordination: Secondary Beams and Areas: http://sps-schedule.web.cern.ch/sps-schedule/ Secondary Beams and Areas: http://sba.web.cern.ch/sba/ Irradiation facilities: https://ps-irrad.web.cern.ch/ps-irrad/ GIF: https://espace.cern.ch/sba-workspace/gifpp/SitePages/Home.aspx AIDA: http://aida.web.cern.ch/aida/index.html Febraury 3rd, 2016 Henric Wilkens (CERN)

PS User schedule Febraury 3rd, 2016 Henric Wilkens (CERN)

SPS User schedule Febraury 3rd, 2016 Henric Wilkens (CERN)

In the North Hall A big clean-up campaign has be completed. A new Gama irradiation facility, GIF++ is being prepared in the EHN1 north hall: Source foreseen ~14TBq, (old GIF had 740GBq in ‘97) +set of collimators for intensity modulation. Located on H4 beam line, (old GIF had lost its beamline). Will also have a set of cosmic triggers, for using outside of SPS running. Source delivery Sept. ‘14, then commissioning. Available for users in ‘15. Old GIF will be decommissioned Febraury 3rd, 2016 Henric Wilkens (CERN)

GIF in EHN1 Gamma Irradiation Facility for testing detectors and electronics in high g-field (Sv/h) Gas pipe work completed Simultaneous provision of 15 different gas types to more than 20 independent users, 5.5 km of 316L tubing, 1150 orbital welds Installation of infrastructure started Cable trays Cabling Detection safety systems (fire, gas, ODH …) Irradiator procurement on track; delivery foreseen in Aug./Sept. 2014. Commissioning Sept./Oct. 2014 Febraury 3rd, 2016 Henric Wilkens (CERN)