Building a Turnagain Arm Bridge: A Feasibility Study

Slides:



Advertisements
Similar presentations
Overview Examples of TranSight Applications What Does TranSight Analyze? Model Structure.
Advertisements

Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Is Metrorail in Prince William County the Answer?.
Presents. Tough Times For Transportation Funding Declining gas tax revenues Declining state revenues Uncertain federal revenue + Increasing construction.
Infrastructure Planning and Funding MID-REGION COUNCIL OF GOVERNMENTS MID-REGION METROPOLITAN PLANNING ORGANIZATION MARCH 19, 2015 NAIOP-NEW MEXICO CHAPTER.
Corridor #5 Update United States Senate Briefing September 26, 2007.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
21 st Century Committee Report Recommendations NC 73 Council of Planning Annual Meeting January 22, 2009.
1 The Impact of Global Warming on the State of Texas Steven Huynh Department of Chemical Engineering The University of Texas at Austin November 24, 2008.
SUMMARY OF BENEFITS AND RETURN ON INVESTMENT GPS FLEET TRACKING.
English 212: Technical Writing Shayla Scott.  Introduction  Criteria  Methods  Research Results  Conclusions  Recommendations.
IMPLEMENTING AN EMERGENCY DEPARTMENT SCRIBE PROGRAM AT ALASKA REGIONAL HOSPITAL A Feasibility Study.
CREATING THE CASE FOR MORE TRAVEL CHOICES John Bartels, City of Port Phillip and Ainsley Nigro, GHD Cost Benefit Analysis for Implementing Separated Bike.
World of Concrete Cement Outlook Ed Sullivan, Chief Economist PCA.
Proposal for the National Transport Plan
The Humber Bridge A Necessary Masterpiece? A Necessary Masterpiece?
The Regional Forum for Transportation Planning. Southwestern Pennsylvania 10 Counties >7,000 square miles 2.66 million citizens 548 municipalities 132.
New Visions Bicycle & Pedestrian Action Plan Bicycle and Pedestrian Transportation – Bicycle and pedestrian travel is vital to the region’s public health,
English 212: Technical Writing Sarah A. Bujno. Overview Introduction Criteria Methods Research Results Conclusions Recommendations.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
1 THE FACE OF PUBLIC TRANSPORTATION. 2 Public Transportation in the U.S. Today Transit in every state in the Union Of the 464 urbanized areas, all but.
Go for Green … … encourages outdoor physical activity that protects, enhances, or restores the environment. … works with organizations, businesses, governments.
Borderplex Gridlock Jaime Muniz, Arien Hardin, Michael Maillet.
Is Transportation Sustainable?. Objectives By the end of this unit, students will be able to: 1.Examine and prioritize transportation project impacts.
Faculty/Staff Commuter Habits William T. Weller Alex Gates Eric Friederichsen Geology 214.
AT THE CROSSROADS Building for the Next Generation Council of State Governments May 30, 2008 Lexington, Kentucky.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Reducing and Eliminating the use of Plastic Bags at the University of Alaska Anchorage: A Feasibility Report By: Gabriel Esposito and Raine Becker.
Making Kenai River Chinook Salmon Catch & Release: A Feasibility Study English 212: Technical Writing Matthew Sansone.
BRIDGE BREAKDOWN: EVALUATING THE ARCOLA BRIDGE ANNA GEORGE GRADE 12 METHACTON HIGH SCHOOL 3 RD YEAR AT PJAS.
2015 Emerald Coast Transportation Symposium Stephanie Lane, Director CSX Industrial Development November 13, 2015.
30-Year National Transportation Policy Framework to the Future September 12,
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
Carbon Footprint Dem Two: Enlly Bugarin Narciso Arevalo December 14, 2015.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Company LOGO Georgia Truck Lane Needs Identification Study Talking Freight Seminar March 19, 2008 Matthew Fowler, P.T.P Assistant State Planning Administrator.
Alternate Work Schedule Update Presented by: Robbie Berg, HR Director On November 5, 2009.
North American Motorcoach Travel: A Green & Safe Alternative 5 th European Bus & Coach Forum International Road Union Kortrijk Xpo, Belgium October 2007.
BUFVELO BICYCLE COURIER AN INTRODUCTION TO How Increasing Bicycle Infrastructure Improves Cities.
Grant Eligible Capital Improvement Plan Memorial City TIRZ THE GOODMAN CORPORATION DECEMBER 2015.
Urban Institute Ireland/University College Dublin School of Geography, Planning and Environmental Policy, Dublin, Ireland Eda Ustaoglu.
Feasibility of a LNG Pipeline in Alaska ENGL 212: Technical Writing William Columbus.
Crosswalk & Pedestrian Signal No protection/separation from traffic
The Florida Energy and Climate Commission (FECC)
Local Government Roundtable Session Arlington, Virginia
GCAT i3 Committee Presentation
Regional Roads Committee
Colleen Carroll University of Nevada, Las Vegas
Bike Sharing Systems. EFFECTIVENESS, IMPACT AND ASSESMENT
Technical and Public Advisory Committee Meeting #3
SR 417 Extension Sketch-Level Traffic & Revenue Evaluation
Draft Transportation Element September 6, 2017
ASSOCIATION OF AMERICAN RAILROADS. ASSOCIATION OF AMERICAN RAILROADS.
ITTS FEAT Tool Methodology Review ITTS Member States Paula Dowell, PhD
State Road 72 Safety Improvements
Constructing the Knik Arm Bridge A Feasibility Study
The Business of Public Transportation
X E FEIKIE D K DAS and MMH MOSTAFA
Transportation Research Institute (IMOB)-Universtiet Hasselt
Integrated Bilateral Agreement (IBA) 2018 to 2028
I-70 DEDICATED TRUCK LANES FEASIBILITY STUDY
Alcohol, Other Drugs, and Health: Current Evidence
I-81 Corridor Improvement Plan
2. Explain how the government has gotten involved in the economy
Cllr Martin Tett Leader Buckinghamshire County Council Chair LGA Environment, Economy, Housing and Transport Board Chair England’s Economic Heartland.
Parks Highway Reconstruction: Lucas Road to Big Lake Road
3 November 2017 Fraserburgh and Peterhead to Aberdeen Strategic Transport Study: STAG Part 1 Plus Bob Nicol: Project Director David Murtagh: Project Manager.
Chicago to Council Bluffs-Omaha
Twin 33s Update Monday, June 10, 2019.
Presentation transcript:

Building a Turnagain Arm Bridge: A Feasibility Study ENGL 212: Technical Writing Bryce Eckroth

Overview Introduction Criteria Methods Research Results Conclusions Recommendations

Introduction Examined the feasibility of constructing a bridge spanning the Turnagain Arm from Anchorage to the city of Hope. Researched public safety statistics along the Seward Highway corridor that this proposed bridge would circumvent to determine project need. Determined economic, public safety, and environmental effects that the bridge would have on South-central Alaska. Identified if the proposed Turnagain Arm Bridge Project is environmentally and economically feasible.

Feasibility Criteria Would the construction of a bridge spanning Turnagain Arm from Windy Pt. to the town of Hope be financially and physically possible? Would the construction of this bridge project effectively mitigate risks to Seward highway users by skipping 60 miles of the current route? Is there a current need for reduction in risks? Would there be any significant environmental impacts created by the construction of this project?

Methods Created & disseminated a questionnaire, in which participants were asked about: demographics, commuter habits along the Seward Highway South of Anchorage, interest/ feelings about a proposed bridge spanning the Turnagain Arm, and effects of such a bridge on Kenai Peninsula economy, the environment, and public safety. Reviewed similar construction projects across Alaska. Focused directly on feasibility studies & reports of a similar bridge spanning the Knik Arm. Analyzed AK Department of Transportation & Public Facilities statistics regarding commuter public safety along the Seward Highway along the Turnagain Arm.

Methods Reviewed Environmental and geological reports of a highly similar report to determine effects of this bridge on the environment and whether or not it could physically be built. Reviewed economy statistics, figures, and projections of South-central Alaska Economies.

Research Results Physical Aspects and Economics of Construction: Quaternary geology of the Turnagain Arm is conducive to building such a bridge. Highly similar Knik Arm Crossing project cost estimated at $650-$750 million dollars, with a roughly $1 million per year cost of operation. Strong population growth rate of 1.72% per year has South-central Alaska’s population growing by over 50% in the next 25 years. Study conducted shows public interest in proposed bridge’s economic benefits.

Research Results Physical Aspects and Economics of Construction “Do you think lower Kenai Peninsula economies such as Seward, Soldotna, and Homer, would benefit from this bridge’s construction?”

Research Results Risk Mitigation From 2001-2007, 121 vehicle crashes occurred along this stretch of the Seward Highway resulting in fatalities or major incapacitating injuries. Challenging road conditions are present due to the physical topography, weather, and variety of user groups. Average vehicle trips sometimes exceed 16,300 vehicles per day, cramping this dangerous stretch of 2-lane highway. Primary research supports this popularity. “How many times per month do you travel on the Seward highway South of Anchorage?”

Research Results Environmental Impacts Similar bridge construction effects on Cook Inlet Beluga Whale populations has been shown to be not detrimental to normal feeding or migratory routes. Sediment displacement or erosion from the bridge’s bridge supports would be expected to be negligible. Mainland connections of the proposed bridge would be spaced so as not to interfere with shoreline migration routes of salmon and smelt species. Dramatic figures of carbon footprint reduction will be realized due to fuel consumption savings with the bridge’s use. A similar bridge projected into the year 2025 totes a net savings of approximately 6.2 million gallons of fuel and over 66,000 metric tons of carbon dioxide by Anchorage commuters.

Research Results Environmental Impacts Public opinion is in favor of infrastructure development in Alaska. Pie slices 1 and 3 represent the majority of survey respondents who thought that bridge projects like the Turnagain Arm project could be constructed to be harmonious with the environment.

Conclusions The data from the geological surveys, economic analysis, population studies, and review of KABATA KAC construction cost estimates indicate that building a bridge spanning the Turnagain Arm could be both physically and financially possible. AKDOT&PF highway safety studies indicate there is a need for reduction in risk to commuters on the Seward Highway. Environmental impact studies conducted on a similar project scope elsewhere in the state of Alaska indicate the construction of a bridge such as that proposed across the Turnagain Arm would not negatively impact the surrounding ecosystem. That, combined with an additional reduction in carbon footprint over the bridge’s lifespan would make the bridge environmentally feasible to construct.

Recommendations An additional study be conducted researching the effects to public safety of bridge construction circumventing dangerous stretches of highway. A more comprehensive questionnaire be disseminated to a larger group of Seward Highway commuters in order to make a precise determination on their feelings regarding bridge construction, current Seward Highway public safety statistics, and toll road use. The Alaska Legislature designates a board similar to the Knik Arm Bridge and Toll Authority which centers on building a Turnagain Arm toll bridge.