SAN PEDRO CREEK ARTS Program Update.

Slides:



Advertisements
Similar presentations
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Advertisements

The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S.
PUBLIC BORDER OPERATORS ASSOCIATION BORDER INFRASTRUCTURE PROJECT UPDATES Canada – United States Transportation Border Working Group Meeting Vancouver,
1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
Hallandale Beach Community Redevelopment Agency Budget Overview Fiscal Year
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
CFD Modeling and Simulation for the Waller Creek Tunnel/8 th St. Lateral Junction Alden Research Laboratory Inc. 30 Shrewsbury St., Holden, MA Preliminary.
Art Unit 2 Folio Britt Westaway. Mind Map What is Culture?
Museum of Contemporary ART San Diego California Jorge Pegueros Computer Art 1/16/15.
Texas Fight for Independence 1836 Battle at the Alamo Massacre at Goliad Battle at San Jacinto.
Underground Stations Typical Station Site Plan. Underground Stations Ground Conditions: Key Issues.
Kimberly Driggins, Associate Director of Citywide Planning September 2013 TEMPORARY URBANISM IN WASHINGTON DC.
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Gravity retaining wall with shear damage from landslide.
Grand Canalscape Phase I and II General Update October 30, 2015.
Luther Burbank Public Art Mosaic VOLUNTEER OPPORTUNITIES FOR ART CLUB MEMBERS!!!!!! ARTICLE FROM THE MERCER ISLAND REPORTER.
Alameda Creek Watershed San Francisco Public Utilities Commission October 27, 2009.
President Leebron’s V2C to incorporate art into the campus landscape and interior public spaces resulted in ½ percent-for-art program Art committee comprised.
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
Fort Detrick Installation Restoration Program Area B Groundwater November 1, 2010 Fort Detrick, Maryland A Sustainable Community of Excellence.
May 18, 2016 Lodi Association of Realtors® - Luncheon Tom Westbrook Director of Community Development.
Arizona Forward Update
Visitors by month, February 2015 to present
Gilbert Road Light Rail Extension
Making Baltimore a more creative and vibrant city.
IGG Agenda 17th December 2009 Minutes from Previous IGG Meeting
Healthy Neighborhoods Learning Collaborative Meeting
GUERNICA PABLO PICASSO.
Measure A Financial Oversight Committee August 7, 2013
Highway 169 Bridge Replacement & Pavement Resurfacing
San Pedro Creek Culture Park Grand Opening & Website/App Updates
San Pedro Creek Culture Park Grand Opening
Chapter 10 Image Segmentation.
San Pedro Creek Status Update
MURAL: East Bank between Travis and Houston St
CONFERENCES. CONFERENCES Americans for the Arts.
June 14, 2018.
Wellborn Underpass Update
PROGRAMMING. PROGRAMMING Upcoming Events Monday Night Yoga (through October) September 25 – Drum Café December 8 – Holiday Event Celebrating multicultural.
June 14, 2018.
Looking at and responding to Street Art
August 9, 2018.
PHASE ART OPPORTUNITIES
October 11, 2018.
Update on National Workplan
Broadway Plaza Redevelopment
About Indiaeve is an website an initiative by Aabasoft Technologies. It is an India’s official event calendar. They have teamed up with many stakeholders.
SAN PEDRO CREEK ARTS Program Update. SAN PEDRO CREEK ARTS Program Update.
January 10, 2019.
December 8, :00 pm – 9:00 pm December 11, :30 pm – 7:30 pm Upcoming: December 18.
SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE
Current and proposed HOT facilities update
May 10, 2018.
Bicycle and pedestrian roundtable
September 13, 2018.
February 14, 2019.
March 14, 2019.
September 13, 2018.
DESIGN ENHANCEMENTS DESIGN UPDATE. DESIGN ENHANCEMENTS DESIGN UPDATE.
June 14, 2018.
Harbour Island Force Main Replacement
Overview of Financial Performance for the Nine Months of FY
Don Pedro Project Relicensing
Event Plan & Meeting Schedule
May 8,, 2019.
May 9, 2019.
Overview of Financial Performance for the Nine Months of FY
Title: Date: Cause: Event: Effect: Title: Title: Title: Date: Cause:
Presentation transcript:

SAN PEDRO CREEK ARTS Program Update

Permanent Artwork Overview West Bank between Travis Street and Houston Street East Bank between Travis Street and Houston Street Bridges: Santa Rosa, Martin, Travis Tunnel Inlet Plaza de Fundacion Tile Patterns and Word Art: multiple locations West Bank between Santa Rosa Street and Martin Street West Bank between Martin Street and Travis Street Permanent Artwork Overview

Temporary Artwork Overview Deck Overlook Travis St Underpass Martin Street Crosswalk Temporary Artwork Overview

JORGE RODRIGUEZ-GERADA Plaza de Fundacion

MICHAEL MENCHACA

JOHN PHILLIP SANTOS “In this place of herons Where the grasses sway In starlight I have flowed Since the dawn of evermore”

DIANA KERSEY Bridges: Santa Rosa, Martin, Travis

SAN PEDRO CREEK ARTS Next steps Oversee fabrication and installation of artwork Frame and hang murals Develop calendar of events for Segment 1 (May – December 2018) Finalize artwork opportunities for Segment 2 Schedule next Arts & Culture Alliance meeting Website update Website will include mural images