Mark Palmer Co-Convener CLIC-ILC Damping Ring Working Group

Slides:



Advertisements
Similar presentations
February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
Advertisements

Low Emittance Rings workshop scope January 12 th, 2010 Y. Papaphilippou, CERN Low Emittance Rings 2010.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
ICFA Beam Dynamics Panel Update and ABDW #49  ECLOUD`10 Mark Palmer Cornell University Laboratory for Elementary-Particle Physics.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
25-26 June, 2009 CesrTA Workshop CTA09 Electron Cloud Single-Bunch Instability Modeling using CMAD M. Pivi CesrTA CTA09 Workshop June 2009.
Damping Rings Y. Papaphilippou, CERN, D. Rubin, Cornell.
Summary Report: Working Group 2 Storage Ring Sources Future Light Source Workshop SLAC, March 1-5, 2010 S. Krinsky and R. Hettel.
Report on the Damping Ring Meeting at CERN, Nov , 2005 J. Gao IHEP, Beijing, China Nov. 24, 2005, ILC-Asia Meeting.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
The U.S. Muon Accelerator Program Mark Palmer Fermilab MICE Collaboration Meeting 32 STFC-RAL February 8, 2012.
Dream test facilities for Damping ring R&D October 25 th, 2012 Yannis PAPAPHILIPPOU CERN.
Fast Ion Instability Studies in ILC Damping Ring Guoxing Xia DESY ILCDR07 meeting, Frascati, Mar. 5~7, 2007.
ILC damping ring options and their critical issues 12th July th ACFA MDI/POL/ACC Pohang Accelerator Lab. Eun-San Kim.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
CesrTA Status Report & R&D Planning Mark Palmer Cornell University April 21, 2010.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
DR 3.2 km Lattice Requirements Webex meeting 10 January 2011.
Working group on Damping rings, ATF and CESRTA October 20 th, 2010 S. Guiducci (INFN/LNF), M. Palmer (Cornell), Y. Papaphilippou (CERN), J. Urakawa (KEK/ATF)
About TWIICE: Topical Workshop on Instabilities, Impedance and Collective Effects In the series of Low Emittance Rings (LOWεRING) Workshops of the EuCARD-2.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
Workshop on Accelerator R&D for USR Closeout Remarks for Accelerator Physics Session.
02/04/2009 AS-TAGL Mtg Global Design Effort 1 CesrTA Update Mark Palmer CLASSE.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
DR to RTML ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
Highlights from the ILCDR08 Workshop (Cornell, 8-11 July 2008) report by S. Calatroni and G. Rumolo, in CLIC Meeting Goals of the workshop:
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement LOW-ε-RING network:
CesrTA Status Report Mark Palmer Cornell University September 2, 2009.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP6- Low emittance rings.
Ion effects in low emittance rings Giovanni Rumolo Thanks to R. Nagaoka, A. Oeftiger In CLIC Workshop 3-8 February, 2014, CERN.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
LCWS, UTA, Reaching ultra-low emittance at SLS through (systematic and) random optimization LCWS 2012 Joint CLIC/ILC Working Group – Damping.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
Two beam instabilities in low emittance rings Lotta Mether, G.Rumolo, G.Iadarola, H.Bartosik Low Emittance Rings Workshop INFN-LNF, Frascati September.
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
Electron Cloud Experimental Plans at Cesr-TA ILCDR08 - July 10, 2009 G. Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
Welcome to the 3 rd LOW  RING workshop in Oxford 8-10 July 2013.
CLIC Technical committee
Electron Cloud and Ion Experimental Program
The TWIICE workshop Benoit for the ABP participants (Andrea, Gianni, Giovanni, Hannes, Lotta, Stefania, Yannis) ABP information meeting March 31st 2016.
SLS Vertical Emittance Tuning
CLIC Damping ring beam transfer systems
Summary of Workshop on Low Emittance Rings 2010
Oversea collaborators
CLIC-ILC BDS & MDI work.
Low emittance Rings 2010 Workshop summary and collaboration
Intra-Beam Scattering modeling for SuperB and CLIC
Utilization of KEKB for ILC R&D
Recent Electron Cloud Studies at CESR and Future Plans
Damping Ring Summary S. Guiducci, M. Palmer, M. Pivi, J. Urakawa
CLIC Technical committee
LER 2010 Overview (and other)
Summary Report: Working Group 2 Storage Ring Sources
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Accelerator R&D Results from the B-factory
CLIC damping rings working plan towards the CDR
Electron Clouds at SLAC
Status of CTC activities for the Damping rings
CTA 09 - Introduction David Rubin Cornell Laboratory for
Session Introduction & Damping Rings Baseline Lattice Decision
Proposal for a CESR Damping Ring Test Facility
Damping ring activities
Presentation transcript:

Mark Palmer Co-Convener CLIC-ILC Damping Ring Working Group LER 2010 Closeout Mark Palmer Co-Convener CLIC-ILC Damping Ring Working Group LER 2010 - CERN

LER2010 Goals Bring together experts from the scientific communities working on low emittance lepton rings (including damping rings, test facilities for linear colliders, B-factories and electron storage rings) in order to discuss common beam dynamics and technical issues. Target strengthening the collaboration within the two damping ring design teams and with the rest of the community. Profit from the experience of colleagues who have designed, commissioned and operated lepton ring colliders and synchrotron light sources. January 15, 2010 LER 2010 - CERN

A Very Busy Week… 59 scheduled talks (all plenary) 56 were successfully presented Our sincerest apologies for the 3 that were not due to the technical difficulties with establishing the WebEx connections The talks covered a broad range of topics: Status of linear collider damping ring designs, B factory designs, and test facilities Low emittance lattice design Low emittance tuning Nonlinear dynamics Collective Effects Fast Ion Electron Cloud (characterization and mitigations) CSR IBS Impedance Modeling and Measurement Technical Issues Vacuum design (including EC mitigation, wiggler radiation absorbers,…) Kickers Magnets and Wigglers Alignment Instrumentation Feedback systems RF systems January 15, 2010 LER 2010 - CERN

Have Our Hopes Been Met? Bringing together experts… 69 registered participants representing a cross section of all the major groups working on low emittance rings Profiting from experience… 56 presentations highlighting critical design issues for low emittance electron and positron rings An impressive range of observations from light sources, B factories and test facilities presented Clear areas of mutual interest identified Many design issues highlighted There appear to be many synergies between plans being developed for future light source development and the plans for low emittance high energy physics rings All leading to… a range of animated discussions exploration of possibilities for collaboration January 15, 2010 LER 2010 - CERN

Profiting from Experience – an example: Have Our Hopes Been Met? Profiting from Experience – an example: Major concern for damping ring teams has been the attainability of the targeted ultra low emittance parameters Following table has been shown twice already… Vertical emittance in the range required for the ILC Damping Rings has been demonstrated Demonstrated emittances are also very similar to the values proposed for the Super B factories Values are rapidly approaching the CLIC damping ring regime! Plans for future light sources are in even closer proximity to the damping ring parameters a Greatly improves our confidence in the proposed designs! Model emittance Measured emittance -beating (rms) Coupling* (y/ x) Vertical emittance ALS 6.7 nm 0.5 % 0.1% 4-7 pm APS 2.5 nm 1 % 0.8% 20 pm ASP 10 nm 0.01% 1-2 pm CLS 18 nm 17-19 nm 4.2% 0.2% 36 pm Diamond 2.74 nm 2.7-2.8 nm 0.4 % 0.08% 2.2 pm ESRF 4 nm 1% 0.25% 10 pm SLS 5.6 nm 5.4-7 nm 4.5% H; 1.3% V 0.05% 2.8 pm SOLEIL 3.73 nm 3.70-3.75 nm 0.3 % 4 pm SPEAR3 9.8 nm < 1% 5 pm SPring8 3.4 nm 3.2-3.6 nm 1.9% H; 1.5% V 6.4 pm January 15, 2010 LER 2010 - CERN

Strengthening collaboration Have Our Hopes Been Met? Strengthening collaboration Many discussions explored the possibility of developing new collaborations or enhancing existing ones Summary presentations clearly identified areas where further collaboration across the community can yield benefits for all This shows great promise, but how should we proceed? A proposal… January 15, 2010 LER 2010 - CERN

Beyond LER2010 Low emittance rings working groups Any other subjects? Coordinators to be confirmed (others to be added?) Task: Identify collaboration items as discussed in the workshop Collect “expressions of interest” from community (LER2010 participants and beyond) Start collaboration work to be reported at the 2nd workshop in a series! Subject Coordinators 1 Low emittance cells design M. Borland (APS), Y. Cai (SLAC), A. Nadgi (Soleil) 2 Non-linear optimization R. Bartolini (DIAMOND/JAI), C. Steier (LBNL) 3 Minimization of vertical emittance A. Streun (PSI), R. Dowd (Australian Synchrotron) 4 Integration of collective effects in lattice design R. Nagaoka (SOLEIL), Y. Papaphilippou (CERN) 5 Insertion device, magnet design and alignment S. Prestemon (LBNL), E. Wallen (MAXlab) 6 Instrumentation for low emittance M. Palmer (Cornell), G. Decker (APS) 7 Fast Kicker design P. Lebasque (Soleil), C. Burkhardt (SLAC) 8 Feedback systems (slow and fast) A. Drago (INFN/LNF), B. Podobedov (BNL), T. Nakamura (JASRI/SPring8) 9 Beam instabilities G. Rumolo (CERN), R. Nagaoka (SOLEIL) 10 Impedance and vacuum design K. Bane (SLAC), S. Krinsky (BNL), E. Karantzoulis (Elettra), Y. Suetsugu (KEK) January 15, 2010 LER 2010 - CERN

Beyond LER2010 LER 2011 January 15, 2010 LER 2010 - CERN

A Thank You On behalf of the CLIC-ILC Joint Damping Ring Working Group, I would like to thank each of you for your attendance, your wonderful presentations, and the many productive discussions in which you all participated. We are looking forward to a continuing fruitful interaction between the light source, collider, and damping ring groups. We hope that all of you will join us for the second meeting next year (in a warmer location…) January 15, 2010 LER 2010 - CERN

Thank You! Another Thank You I would like to express our thanks to the local organizing committee: Fanouria Antoniou Alexia Augier Ioannis Papaphilippou Alessandro Vivoli They have provided us with a most enjoyable workshop and nothing could stop them: Neither snow Nor electrical failures Nor technical difficulties… Thank You! January 15, 2010 LER 2010 - CERN

Introducing the QUANTUM LimitOfVerticalEmmitance Prize for the Low Emittance Ring first reaching this limit More details to follow… January 15, 2010 LER 2010 - CERN