POSSIBLE SCENARIOS FOR TRAINING

Slides:



Advertisements
Similar presentations
Numbers
Advertisements

Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
Expected Quench Levels of the Machine without Beam: Starting at 7 TeV ? P. Pugnat CERN, Geneva, Switzerland LHC Project Workshop Chamonix XV, Tuesday 24.
Chapter 20 Special Occasion Speeches
We’re going to a New Version? Bill Marlow School of Business, IT & Management.
LMC 30 LPC A. Verweij, TE-MPE. 30 Sept 2009, LMC meeting 1.9 K, 0 T, 7.5 kA run Heat pulse.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
Concept of a Collimation System with Enhanced Operational Stability and Performance.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
AT-MEI Group, CERN, 1211 Geneva 23 MPP Unbalance between apertures of MB B30R7 MPP meeting 18/06/2008 Unbalance between apertures of Dipole.
Oliver Hilbery Project Director. What is MEAM? Four national membership organisations 1600 members Focussed on policy and practice change for people with.
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland SMS CERN General Infrastructure.
E. Todesco OUTPUT OF THE CABLE REVIEW E. Todesco and the QXF team CERN, Geneva Switzerland CERN, 10 th December 2014 QXF design review, CERN.
Cold powering test results of MBHSP102 Gerard Willering, TE-MSC-TF With thanks to Jerome and Vincent and all others from TF for their contribution.
E. Todesco PROTECTION FOR QXF E. Todesco CERN, Geneva Switzerland QXF protection meeting 28 th October 2013.
E. Todesco MAGNET (RE)Training E. Todesco Magnets, Superconductors and Cryostats Group Technology Department, CERN LHC risk review, 5 th March 2009 Acknowledgements:
E. Todesco ENERGY OF THE LHC AFTER LONG SHUTDOWN 1 ( ) C. Lorin, E. Todesco and M. Bajko CERN, Geneva Switzerland With relevant inputs from colleagues.
HOMEROOM10/23/14 Write these important dates in your agenda: Monday - Friday (10/20-10/24) – Conference Week (Early Release-2:15) Book Fair Week Friday.
Courtesy & Ceremonial Speeches. INTRODUCTIONSPRESENTATION  Refer to occasion that has brought the audience together  Name the person (mention the person.
July 11, 2007 HC WorkshopG.J. COELINGH - AT / MEL 1 Energy Extraction.
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
Welcome to ARAS Engineering. About Us ARAS Engineering is a professionally managed organization with a team of well qualified engineers, technicians and.
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
In many father of the bride speeches Jokes are added. In fact, funny lines are The other key element to make a wedding speech interesting. Audience gets.
E. Todesco QUENCH BEHAVIOUR TEAM ACTIVITIES E. Todesco for the QBT CERN, Geneva Switzerland CERN, 7 th January 2016 MSC Technical Meeting.
Quench behavior of the main dipole magnets in the LHC By Gerard Willering, TE-MSC On behalf of the MP3-CCC team Acknowledgements TE-MSC, MP3, BE-OP, TE-MPE,
E. Todesco RETRAINING AND DETRAINING IN THE LHC E. Todesco Magnets, Superconductors and Cryostats Group Technology Department, CERN LHC Machine Advisory.
ITE Hirakjyoti Nath Class 7
S. Roesler (on behalf of DGS-RP)
SOME MORE STATISTICAL ANALYSIS OF TRAINING DATA
Deteriorating Patient
Evaluating Utility Allowance Options
E. Todesco for the QBT CERN, Geneva Switzerland
ANALYSIS OF THE PRODUCTION DATA AFTER THERMAL CYCLE SECOND PART
Unit 503: Champion equality, diversity and inclusion
STATISTICAL SUMMARY AND INTERPRETATION OF THE TRAINING CAMPAIGNS
Child Safe Standards VCC
Recommissioning of sector 12 after a short warm-up during eYETS 2016/17 QBT, MP3 – May 2017 S. Le Naour.
QUENCH BEHAVIOUR TEAM ACTIVITIES
DESIGN OPTIONS IN THE T RANGE
Magnet Circuit performance at 6
Sample Presentation. Slide 1 Info Slide 2 Info.
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Yahoo Mail Customer Support Number
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
In-class Exercise Guidelines
بنام خالق هستی بخش.
ريكاوري (بازگشت به حالت اوليه)
Risk management in Software Engineering
Description of Key Result Section Description of Key Result Section 2
Marc Timmins - GUCS communication
THANK YOU!.
Homeroom 10/21/14 Write these important dates in your agenda:
Thank you.
Thank you.
PHASE 6: BUSINESS CASE 2-3 Year Cash Flow Projection Expected Benefits
The Third Generation of Knowledge
Nitrogen release from the TT2A cryogenic solenoid systems
Presentation for the IFRC Sexual and Gender-based Violence course
In-class Exercise Common Errors
C.2.10 Sample Questions.
C.2.8 Sample Questions.
C.2.8 Sample Questions.
Determinants Get out your notes and be ready to complete a warm-up on your new purple sheet.
E. Todesco CERN, Geneva Switzerland
Other arguments to train two sectors to 7 TeV
Repair campaign 2017 Repair campaign 2016 Repair campaign 2015 TS2 TS1
Upcoming, Important Dates:
Presentation transcript:

POSSIBLE SCENARIOS FOR TRAINING CERN, 10th May 2016 Quench Behaviour Team meeting POSSIBLE SCENARIOS FOR TRAINING E. Todesco CERN, Geneva Switzerland Based on production data (thanks to project engineers and SM18 staff) Based on the HC data of 2015 and 2008 (thanks to MP3 teams)

DATA REMINDER: SECTORS We are discussing the possibility of Powering towards 7 TeV some sectors during EYETS This is essential to have a sample of data that allow to avoid extrapolations of 6.5 TeV behaviour Having a warm up cool down to have more information about memory This would add the experience of another sector For the moment we have 5-6 powered to 6.5 TeV twice 2008 quenches: 23±8 2015 quenches: 16±7 and we have 4-5 powered to 6.0 TeV twice 2008 quenches: 3±6 2015 quenches: 10±6 On this issue it is difficult to have conclusive data, but another sector would be welcome if this does not increase significantly the risk

DATA REMINDER: SECTORS I think we need two sectors towards 7 TeV As stated in few occasions (LMC 20-01-2016, Chamonix) 12 for 1000 and 2000 series behaviour 45 for the second quench of 3000 series

DATA REMINDER: SECTORS If we could warm up and cool down a sector I would exclude 45 to minimize the number of quenches 12 would give little info on 3000 series 78 early part of production – not significant 23 would be perhaps the most significant Equal share between 3 series 17 quenches for 6.5 TeV this is the overhaed Others (81,67,56,34) would also be ok 56 would give a third point – or better to have another