Calorimeter upgrade meeting

Slides:



Advertisements
Similar presentations
CBM Calorimeter System CBM collaboration meeting, October 2008 I.Korolko(ITEP, Moscow)
Advertisements

Particle identification in ECAL Alexander Artamonov, Yuri Kharlov IHEP, Protvino CBM collaboration meeting
Data analysis BTF 23 e 24 mag 05 T1 T2 500MeV electrons Repetition Rate 50 Hz Pulse Duration 1-10 ns Current/pulse 1 to 8 particles σ XY ~2mm Max Electronic.
New Chambers for M23R12 for the Muon Upgrade Alessandro Cardini INFN Cagliari.
Jin Huang Los Alamos National Lab.  Cited from March collaboration Meeting EC group Internal Communication Jin Huang 2 Preshower ID power drop significantly.
D.Websdale: RICH Meeting LHCb RICH group meeting: Wednesday 10th November, in B40-SS-C01 at 14:00. Agenda: 1. The Photodetector Panel’s proposition.
TDR2 FM board tests D. Haas Test Setup Test Procedure Functional tests Results Test Schedule.
Downstream e-  identification 1. Questions raised by the Committee 2. Particle tracking in stray magnetic field 3. Cerenkov and calorimeter sizes 4. Preliminary.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
E – FILING EXPERIENCE IN SLOVENIA AND SERBIA Ivan Simič.
Monitoring system of the LHCb electromagnetic calorimeter NEC’2007, Varna, Bulgaria Ivan Korolko (ITEP Moscow)
AGS RSVP Weekly Meeting P. Pile 14 Apr 2005 AGS RSVP Weekly Meeting 14 Apr 2005 Useful Links: RSVP Project : C-AD.
Atlas Computing Planning Helge Meinhard / CERN-EP Atlas Software Workshop Berkeley, 11 May 2000.
Calorimeter Performance Paper Xavier Vilasís-Cardona Calo Meeting - Xvc1.
Calorimeter Simulation Infrastructure Norman Graf Arlington ‘03.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Fundamental Digital Electronics
Software Week - 8/12/98G. Poulard - CERN EP/ATC1 Status of Software for Physics TDR Atlas Software Week 8 December 1998 G. Poulard.
JUNO English CDR Hu Wei. Introduction Tortoise SVN  We use SVN to manage JUNO English CDR.  Advantage: older or the latest CDR version will be preserved.
Within ATLAS both TILECal and LAr are planning upgrades to the readout systems - current systems will reach limits on radiation exposure aging of components.
NALINI S. NAUTIYAL SYSTEM SOFTWARE DIVISION Subversion.
TDR end game. Timeline constraints We need to use the current momentum to conclude the TDR work Needed by all funding agencies to support funding requests.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
LHCb Simulation LHCC Computing Manpower Review 3 September 2003 F.Ranjard / CERN.
News and Miscellaneous Didier Contardo, Jeff Spalding UPO August 03/ UPO 08/03/12.
- LHCb calorimeter upgrade April 15th, News and ideas on DAQ architecture Frédéric Machefert LAL, Orsay.
Relative crate phase measurement Olivier Deschamps Jacques Lefrançois Frédéric Machefert Stéphane T'Jampens Frédéric Machefert – Calorimeter Meeting.
OASIS Overview TC Process & Administration
Parameterization of EMC response for
Overview of SuperB Particle identification, and work towards the TDR
LCG Service Challenge: Planning and Milestones
SVT subchapters & editors
The LHCb Calorimeter system
Claudia Cecchi University of Perugia and INFN
NPA 709 (Area Code) Relief in Newfoundland and Labrador
Introduction LOI Hardware activities and GBT Simulations
HEPD BTF and Trento Facility Calorimeter preliminary results
LHCC referees’ questions, comments, requests
LHCb electronics, 13th October 2016
Francesco Forti University and INFN, Pisa
Calorimeter Upgrade Session : News
Calorimeter Upgrade Meeting
Calorimeter Upgrade Meeting - News
LHCb Calorimeter upgrade
Math Monday, Oct 29th Check Envision pgs: 60-62/Grade
Welcome! February 21st, 2018 Wednesday
CSE477 VLSI Digital Circuits Fall 2002 Lecture 14: Midterm Review
Activities of the UNECE-UNODC Task Force on Victimization Surveys
Documenting your web source
Collaborative Text Editing
SCHEDULE WEEKDAY LESSONS:
“Good Night, and Good Luck”
LHCb Particle Identification and Performance
Homework Do Now: Agenda Wednesday October 26, 2016 Objectives:
NPA (Area Code) Relief in Quebec
CS6020 Advanced Assembler Project
Mrs. Trainer’s Class October 30th - Nov 3rd Thanksgiving lunch
New dates Monday 6th January – Wednesday 8th January 2020
NPA 236/250/604/778 Relief Planning Committee Meeting – Day 1 Wednesday, October 11, 2017 Delta Hotel – Vancouver, BC 9:00 Registration 9:15 Welcome and.
“Day C” Wednesday, October 21, 2015
ESSnet SAE project meeting Neuchatel, 7-8 July 2011
And plan for SICBDST retirement
Isotope Class Notes.
7th Grade Math Warm-ups Week of October 24-28, 2016.
The LHCb Front-end Electronics System Status and Future Development
MC production plans : 1/08/ /03/2001
Missing digits game.
PERFORMANCE OF THE METAL RADIATION MONITORING SYSTEMS
Presentation transcript:

Calorimeter upgrade meeting TDR Electronics Performances F. Machefert

TDR PID TDR includes contributions from RICH Calo Muons Merging of the different parts supervised by Guy Wilkinson Collaboration agenda : Nov 13th : TDR should be sent to the collaboration Nov 19th : TB Nov 29th : LHCC Wednesday 16 October 2013

TDR I still miss Introduction Electronics analog Electronics digital LLT Connections to the counting room Aging and radiation effects Mechanics Pile-up Particle identification (electrons, photons) Organization (schedule, costs, responsibilities) Wednesday 16 October 2013

TDR Remember that you can send me your contribution or post it on svn svn+ssh://svn.cern.ch/reps/lhcbdocs/Users/frederic/TDR _Sept2013/latest Planning Oct 25th : new version Circulation in to the lhcb-calo-upgrade mailing list 2 readers : Marie-Noëlle and Jacques Nov 1st : get a new version that may be integrated into the full document (Guy) Circulation in the group Nov 8th : latest version integrating latest corrections Wednesday 16 October 2013

October 16th meeting Wednesday 16 October 2013