Changes to the Business Unit Settlement Risk Rating (BUSRR) criteria

Slides:



Advertisements
Similar presentations
Module 1 Evaluation Overview © Crown Copyright (2000)
Advertisements

Food Safety Quality Management System Training Guide
 Contracts  Subcontracting  Suppliers  Complaints  Corrective and preventive actions (CAPA)  Internal audits  Management reviews Management requirements.
The New TNI Laboratory Accreditation Standards Requirements for an Accreditation Body.
AUDITING COHESION AND STRUCTURAL FUNDS IN SLOVENIA Nataša Prah Ljubljana, 
IAEA International Atomic Energy Agency Responsibility for Radiation Safety Day 8 – Lecture 4.
Transforming tourism THETA A presentation for Portfolio Committee by Leoné Whateley THETA ETQA Manager.
SOX and IT Audit Programs John R. Robles Thursday, May 31, Tel:
PROCESS AND PRODUCT QUALITY ASSURANCE
ISO General Awareness Training
Project Management Quality Management* Dr. Khalid S. Husain * 07/16/96
 QUALITY ASSURANCE:  QA is defined as a procedure or set of procedures intended to ensure that a product or service under development (before work is.
OHSAS 18001: Occupational health and safety management systems - Specification Karen Lawrence.
Overview of Supplier Volume Allocation
5.2 Personnel Use competent staff Supervise as necessary
Module J Audits and Inspections Patricia E. Koziol 1Module J Final Version 1-May-2010.
National Disability Advocacy Program (NDAP) Quality Assurance (QA) – report on the FaHCSIA trial.
Project Management Gaafar 2006 / 1 * This Presentation is uses information from PMBOK Guide 2000 Project Management Quality Management* Dr. Lotfi Gaafar.
Conducting an Information Systems Audit
Richard F. Chambers, CIA, CGAP Vice President, IIA Learning Center The Institute of Internal Auditors.
MOD506 – Gas Performance Assurance Framework and Governance Arrangements.
Corporate Support PPSO Gez Keating, Serco Plc. AGENDA Portfolio Management Role of Corporate PPSO Processes Where to Start Benefits.
SANAS ACCREDITATION DEES DHANRAJ BEE Lead Assessor.
EDUCATION AND TRAINING QUALITY ASSURANCE Edmund Nxumalo Acting Senior Manager: ETQA.
1) Establish & Identify Scheme 5) Evolve Scheme 4) Review & Modify Scheme Deliverables 3) Operate the Framework 2) Manage Performance Assurance Scheme.
Performance Assurance Reporting 16 June 2015 Douglas Alexander Uniform Network Code.
OHT 12.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Introduction Types of external participants Risks and benefits of introducing.
Presentation to DCMF Profiling and Settlement Review Group John Lucas 3 August 2010.
PROCEDURES FOR PROVIDERS AFTER INSETA ACCREDITATION/SCOPE IS AWARDED.
Chapter 02 Professional Standards McGraw-Hill/IrwinCopyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved.
Impact of CDCM on unmetered energy 4Mar2010 Presented by Tom Chevalier.
Deck 5 Accounting Information Systems Romney and Steinbart Linda Batch February 2012.
QUALITY 10 July 2015 CORP 3268 – DIGITAL TRANSDUCERS.
Renewables IPP frameworks for successful PPAs Dr Muriel Watt Head, Energy Policy & PV.
IDTA level 4 Diploma in Dance Teaching
Cervical Sample Taker Database (CSTD)
Program Management Office (PMO) Design
Program Management Office (PMO) Design
Health and Safety Self Assurance Toolkit 2017
World Health Organization
Selection of contractors & PAS91:
Performance Assurance Reporting
What is SBE? _______________
EMU Computer Engineering Dept.
Presentation to the Portfolio Committee on Finance
Technical Assurance Agent
UNIT V QUALITY SYSTEMS.
Program Management Office (PMO)
MODULE 2 INTRODUCTION TO GOVERNANCE AUDIT
PEM PAL IA COP Internal Control Working Group COSO Principles
Internal control objectives
Quality Management Systems – Requirements
#MKEnergy © 2017, CAPE.
Role of the Preventive Control Qualified Individual
Engineering Processes
PRIDe in Gas Model workshop
Program Management Office (PMO)
Program Management Office (PMO)
Indicative PRIDe Project Plan

OPERATION OF THE BSC PERFORMANCE ASSURANCE BOARD – information for Gas Performance Assurance Workgroup Sasha Pearce, 4th March 2014.
Emulsion Task Force Meeting
Gas Performance Assurance
EDUCATION AND TRAINING QUALITY ASSURANCE Acting Senior Manager: ETQA
SOEASI Log onto JPA to run the reports
Cost Containment Working Group Board Update
Manage Business Continuity Introductory Brief
EMU Computer Engineering Dept.
Approaches to Accounting and Auditing for Unallowable costs
IDTA level 4 Diploma in Dance Teaching
Presentation transcript:

Changes to the Business Unit Settlement Risk Rating (BUSRR) criteria Public Changes to the Business Unit Settlement Risk Rating (BUSRR) criteria Kat Gay Paulina Stelmach

Agenda Module 1: What are BUSRRs and why do we have them? Module 2: PARMS BUSRRs Module 3: Settlement BUSRRs Module 4: Future impacts to the BUSRRs BUSRRs & The BUSRR Review

WHAT are BUSRRs and WHY do we have them?

Performance Assurance Framework Preventative Detective Corrective Education Accreditation & Certification Error & Failure Resolution Operational Audit Change Management Disputes Technical Assurance Entry Process Testing Peer Comparison Supplier Charges Performance Monitoring Delivered via PARMS BUSRRs & The BUSRR Review

PARMS Database Reports Data Providers Performance Assurance Reporting and Monitoring System Data Providers Database Reports PARMS Supplier-Agent Statistics SRR & Dashboard Supplier Charges Peer Comparison Auto generated PARMS Reports BUSRRs & The BUSRR Review

Performance Assurance Board (PAB) The PAB conducts and administers activities to provide assurance that all participants in the BSC arrangements are suitably qualified and that the relevant standards are maintained. The PAB is appointed by, and reports to the BSC Panel. PAB Responsibilities: SVA Qualification Technical Assurance Operational audit Liquidated Damages and Peer Comparison BUSRRs & The BUSRR Review

BU SR R What’s a BUSRR??? Risks measured at Business Unit (BU) Level Risk Evaluation Register provides the top Settlement Risks (SR) with measureable data The risk posed to Settlement by BUs by performing poorly is given a Rating (R) – RED, AMBER or GREEN The risk ratings of each BU is reported to the PAB monthly SR R BUSRRs & The BUSRR Review

BUSRRs: April 2017 view BUSRRs & The BUSRR Review

PARMS BUSRRs

SR3019 Data Quality (SR0022 and SR028 Combined) BUSRRs & The BUSRR Review

Peer Comparison – Now Public! BUSRRs & The BUSRR Review

SR0024 & SR0025 - Missing Meter Technical Details (MTDs) SR0024 – Missing NHH MTDs SR0025 – Missing HH MTDs BUSRRs & The BUSRR Review

Settlement BUSRRs Now going onto Settlement BUSRRs.

Settlement BUSRRs Why change the SR72 criteria? BUSRRs & The BUSRR Review

Settlement BUSRRs SR0072 OLD: SR0072 NEW: BUSRRs & The BUSRR Review

Settlement BUSRRs SR0074 Old SR0074 New

Settlement BUSRRs Why Change SR0081? BUSRRs & The BUSRR Review

Settlement BUSRRs SR0081 (100kW) OLD: SR0081 (100kW) NEW: BUSRRs & The BUSRR Review

Settlement BUSRRs Why Create a new HH Settlement Risk? BUSRRs & The BUSRR Review

SR0081b and SR0081c SR0081b – Sub 100kW CT Metered (Measurement Class E) BUSRRs & The BUSRR Review

When are BUSRRs used? BUSRRs & The BUSRR Review

Questions?