Installation XFEL Tunnel WP 34

Slides:



Advertisements
Similar presentations
André Augustinus 16 June 2003 DCS Workshop Safety.
Advertisements

Progress and Plan for Superconducting RF Cavity RF Group.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Central Region Discussion Power and Cooling GDE Beijing-CFS.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
PLATFORM UTILITIES PAB 2073 Reference: PCSB/PMO document.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Introduction Topic: The Basic Ground Source Heat Pump Name: Matthew Stoangi Objective: To provide a clear understanding of the mechanics involved in the.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
Gas Coordination Panel 24/08/2004 Flammable Gas Installation Requirements, Interlocks, etc. F.H.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Global Design Effort1 September 20-22, 2006 MAC Review Power and Water breakout (mixed results) Marc Ross GDE.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Accelerator Design: the nuts and bolts…and gaskets and resistors Elvin Harms Beams Division/Fermilab
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
Update on the Laser Beam Line
TMALL 0141 Presentation v 1.0 A concept for simplified Fixed Fire Fighting System: Northern link, Stockholm Ulf Lundström, TSO Swedish Transport Administration.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Ullrich, DESY Dubna GDE XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Water cooling XFEL Desingn of the XFEL water cooling.
ELENA installation progress F. Butin / ELENA collaboration.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
S A Griffiths CM42 June 2015 Electrical & Control.
Industrial Resources, Inc.
Update on the PSB Cooling and Ventilation Systems
Demineralised water cooling system
High energy beam transport.
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
SUPERB site status report for layout v12
CBETA Technical Review
Installation Global System
HL-LHC IT STRING and Series test of SC link
Equipment simplified model SMR UR safety
EHN1 Extension planning
ELENA installation and commissioning status
Building H0209A (G007) (GAP Thorsten Ziglasch, Ina Schurig)
News from Integration WG
Tunnel Cross Section Studies
CLEX* Status and Plans CTF3 complex CLEX
UNIT INJECTOR SYSTEM.
Introducing Current Electricity
352MHz Klystron Control for the 3MeV Linac test stand
XFEL Vacuum System Commissioning
SPS activities during LS2 TE-EPC (Power Converter Group)
WP02 PRR: Master Oscillator and RF Reference Distribution
COOLING & VENTILATION INFRASTRUCTURE
WP Coordinaten XFEL RF Operation
AUTOMATIC SPRINKLERS.
ARCHITECTURAL SAFETY FEATURES –Exit Separations –Continuation of Exit Stairs from lower to upper floors –Discharge from Exits FIRE PROTECTION FEATURES.
Electrical Gas Plumbing Heating & Cooling
Business opportunities related to CERN electrical network
TEST PLANS for HL LHC IT STRING
Unit 2.4 Electric Circuits
Maintenance at ALBA facility: Strategy for the conventional services
Advanced Research Electron Accelerator Laboratory
J. Seeman Assistant Director for PPA/LCLS
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Installation XFEL Tunnel WP 34 Hans-Jörg Eckoldt For WP34

WP4 Responsibilities Energy supply Water supply Air conditioning Connection of the racks UPS Elektrants Water supply 20 ° Water 30° water Pressurized air Air conditioning No extra cooling in the tunnel Power supplies

WP4 Responsibilities Energy supply Water supply Power supplies Organization Markus Faesing Work coordination Marko Krüger Water supply Organization Frank Reinhard Ullrich Work coordination Felix Levenhagen Power supplies Injector Björn Näser XS1 Axel Hauberg Superconducting Magnets Martin Blöcher Cabling Karo Amyan Air conditioning Organization Silke Feuker

Requirements All requirements for the technical infrastructure is fixed in the room book If all of a sudden additional requirements occur, these have to be introduced as change request and will be handled after acceptance when there is time Most probably at a late stage of installation

Work WP34 (1) LV-distribution electrant Rack connection Water 18°C IT Fire protection Power supplies Rack connection 400 V Water 18°C IT Fire protection Connection of pulse cables WP01

Work WP34 (2) electrant Water distribution Klystron/ transformer Rack connection 400 V Water 18°C IT Fire protection Power supplies Rack connection 400 V Water 18°C IT Fire protection

Energy supply The installation is strongly related to the installation process of the machine. The sub distributions and electrants can only be installed in combination with the installation of an RF-Section. When the entire racks are of 1 - 3 sections will be installed the electrical distribution can be done. This has to be optimized Energizing of the racks This will be according to the installation of the distributions. This may cause delays. The connection of the electrants will be connected up and down-stream from the distribution.

Work WP34 (1) LV-distribution electrant Rack connection Water 18°C IT Fire protection Power supplies Rack connection 400 V Water 18°C IT Fire protection

Electrant (just example)

Installation of cables Pulse / low voltage cables through floor slabs Additionally slabs have to be lifted on the walk way. The low voltage voltage cables are generally on this side. The pulse cables from appr. 1000 m on.

Water connection 18°C The racks are water cooled with 18 °C water The distribution connection will be ready at that time. The connection of the racks will be done according to the installation The connection will only be done once per RF section. There will not be an immediate connection as soon as the rack is positioned

Water connection 30°C The klystron/transformer are water cooled with 30 °C water The klystron water distribution connection will be installed in combination with the transformer The connection will be done according to the installation and in coordination with WP01.

Water connection 30°C The magnets are water cooled with 30 °C water The magnets will be connected directly to the sub-distribution pipes. The connection will be done according to the installation.

Water connection 30°C Some special user like Dump or TDS are cooled by an own pump station. The task is to separate water loops (e.g. Dump) or to have a big water flow by controlled water temperature. The pump stations will be installed as soon as possible. The connection will be done according to the installation.

Pressurized air The main installation (main distribution pipe and main valves) is finished There are requirements for controlling units and for installation The connections will be done according to the installation progress These will be either sub-distribution pipes and small distribution racks or direct  

Safety The components for smoke detection and extinguishing system will be installed with the progress of rack installation. It will be possible to commission parts of the ring cabling of the fire alarm system. This is dependent of the subsection structure.

IT The general light links are installed below ground. The racks will have to be connected to these central light links. Additionally the interconnections between the different racks has to be installed. This will only be done when a sufficiently high number of racks installed since an external enterprise will come to perform this work. The number and starting dates will be discussed with TC

Power supplies Cabling The cables of the bunch compressors and dogleg will be installed beginning next year. The bid for tender is on the market The cables for the superconducting magnets will be installed on the fly when the RF section is installed. The cables at the XS1 side will be installed in 2015

Inkind BINP power supply passed PRR

Installation of power supplies Cable trays and water installation for power supplies (XS1) First power supply operated in the Gun test, installation of power supplies ongoing (XTIN) Material transported to XTIN

Inkind Spainish power supplies ready for PRR

Power supplies for the superconducting magnets The power supplies of the superconducting magnets will be installed after the installation of the electronic racks by WP 34. This is only dependent of the installation of the racks.