Types of contract selection based upon following:

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Construction Engineering 221
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Comparison of Major Contract Types
Contracts EECE 295. Estimating Estimating takes place at proposal time, and includes an estimate of: –Time phased cost: Direct labor Direct material –Overhead,
LOS ANGELES UNIFIED SCHOOL DISTRICT JOB ORDER CONTRACTING Copyright © 2004 The Gordian Group, Inc. all rights reserved.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Contract and Grant Provisions and Administration Section 105 (Page 30) Title I The Act.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Section 2 Production Chapter 3 Analysis of Indirect Costs Chapter 4 FPIF Contracts.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Copyright Course Technology Chapter 11: Project Procurement Management.
Contract Types and Appropriate Incentives. 1 Jo Cunningham Distinguished Member of Laboratory Staff Sandia National Laboratories Session #3, 1:00pm -
Contract Types. Forms of Contracts Completion – A product is delivered –Cost or Fixed Price –Product must be delivered –Contract completed on delivery.
ATMES Spring Meeting April 26-27, 2012 Myrtle Beach, South Carolina International Projects.
Construction process Types of contracts Halmstad University Construction management Piotr Mazur Paulina Wawryca Paweł Bilski.
Contracts and Procurement
Dr. SangHyun Lee Department of Civil and Environmental Engineering
Federal Acquisition Regulation (FAR) Part 16 Types of Contracts
Introductory to the “Basics” of Contract Types and Their Impact in the Management of Government Property Presented by: Fay K. Schulte, CPPM.
Contract Type Selection Don Shannon
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Chapter 12 Procurement Management
Defense Acquisition University American Society of Military Comptrollers The Good, the Bad, and the Ugly What Every Financial Manager Should Know About.
Construction Contracts and Project Delivery Methods
BME/CompE/EE/ME 297 Senior Design Seminar Contracts & Contract Management Andrew W. Dozier FGH 249.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
Federal Acquisition Regulation (FAR) Part 16 Types of Contracts
TYPES OF CONTRACTS.
Chapter 11: Project Procurement Management
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
Additional Commercial Contract Types FAR Case Summary of Comments from October 19, 2004 Public Meeting Appropriate Use Terms and Conditions Payment.
Click on Next to continue Fixed Price Contracts Cost Reimbursable Contracts Time and Materials Next Involves setting a fixed total price for a defined.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
1. 2 Managing Risk and Reward by Contract Type Breakout Session # 501 Beverly Arviso, CPA, Fellow, CPCM, CFCM, Arviso, Inc. Tuesday, July 31, :30-3:45.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
1 Procurement Management Sharif Project Management Session 11 – Fall 1390.
Block 7 Project Procurement Management. ► The processes required to acquire goods and services from outside the organization ► Purchasing  Procurement.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
1. 2 Cost & Price Analysis Breakout Session # 312 Beverly Arviso, CPA, Fellow, CPCM, CFCM, Arviso, Inc. Melanie Burgess, CPA, CFCM, Burgess Consulting,
Advance Technician Diploma in Quantity Surveyor
Copyright 2014  Procurement means acquiring goods and/or services from an outside source  Other terms include purchasing and outsourcing Information.
Contracting Officer Podcast Slides
Types of Contracts and Guidelines for their choice
Comparison of Major Contract Types
Types of Fixed Price Contracts
Life Cycle of Federal Acquisition
Accounting for Construction Contracts (IAS 11)
Project Procurement Management (& Outsourcing)
Comparison of Major Contract Types
TYPES OF CONTRACT DR. Nabil Dmaidi.
Comparison of Major Contract Types
Project Procurement, Contract Management, and
Information Technology Project Management – Fifth Edition
CPFF CPIF CPAF FPI(F) FPAF FFP
CMC200 FEES, FINANCING, AND PAYMENTS
Comparison of Major Contract Types
Outsourcing: Managing Interorganizational Relations
Insurance and pensions funds
Contractual Arrangement
ARCH 435 PROJECT MANAGEMENT
COST OF THE WORK: Tricks and Traps to Avoid in Contract Drafting
Comparison of Major Contract Types
Selecting Contract Types & Incentives
Construction Contracts
Insurance and pensions funds
Comparison of Major Contract Types
C2 Follow the Capital Risks
Comparison of Major Contract Types
Presentation transcript:

Types of contract selection based upon following: Overall degree of Cost & Schedule Risk Type & complexity of Requirement (technical Risk) Extent of Price Competition Cost/Price Analysis Urgency of Requirements Performance period Contractor's Responsibility (and Risk) Contractor's Accounting System (Report Earn Value reporting?) Concurrent Contract (contract take A back seat to existing work?) Extent of Subcontracting (how much work contractor out source?)

General six types of contracts : Fixed-price (FP), Cost -plus-fixed-fee (CPFF), Cost-plus-percentage-fee (CPPF), Guaranteed Max-Shard Savings (GMSS), Fixed-price Incentive- Fee (FPIF), Cost-Plus-Incentive-Fee (CPIF)

First Category Fixed-price or Lump-sum contract

Contractor carefully “Estimate Target Cost”. Contractor required to Perform work at negotiated Contract Value.

If “Estimated target cost” is low then “Total Profit reduced” & may vanish. Contractor may not be able to “underbid competitors” So Contractor assumes a Large risk.

Lump-sum Provides “Max Protection to Owner” for ultimate “Cost of Project”. Disadvantage: Requiring a Long Period For Preparation & Adjudications of Bids.

Because of a Lack of knowledge of all contractors Include Local conditions, all contractors Include Excessive Contingency.

Change Requested By owner after “Award of contract” Lead to Troublesome & Sometimes “Costly extras”

2nd Category Cost-Plus- Fixed-Fee (CPFF)

Cost Plus Fixed Fee (CPFF) If Accurate Pricing Not Possible in Any Other way. So we use CPFF, so Cost may vary but Fee remains same. Contractor agrees only to use Best Efforts to Performance Good/Poor Performance Rewarded equally.

Total Le/$ Profit likely To Produce Low “Rate of Return” reflects Small “Amount of Risk” By contractor. Fixed Fee - small % Age Of “Tot/true Cost”. CPFF Required Company books be audited.

3: Cost-Plus-Percentage – fee Contract

Provides Maximum flexibility to owner Permits “Owner & Contractor” to work together cooperatively on All “Technical, Commercial, Financial Problems”. -No Financial Assurance of “Ultimate Cost”.

“No financial incentive to contractor” this because of “High building cost” (Compared with other forms). Only meaningful Incentive can be: Inc competition & Prospects for Follow-on contracts.

4th Category of Contracts Maximum-Share Savings” “Guaranteed Maximum-Share Savings”

Contractor-Gets “Fixed Fee” for his “Profit” and Reimbursed for the “Actual Cost” of Engineering, Materials, Construction Labor, all Other Job Costs, But only up to “Ceiling figure established” as “Guaranteed maximum"

Savings below the" Guaranteed Maximum” are Shared between “Owner & Contractor”, where as Contractor Assumes the Responsibility For any “Overrun beyond” Guaranteed “Maximum Price”.

Contract form Combines advantages as well as disadvantages of Both “Lump Sum” & “Cost-Plus Contracts”. Best form for Negotiated Contract as it Establishes a Maximum Price At Earliest Possible Date

Though contract awarded without “Competitive Tenders”. -Yet Protects owner Against being Overcharged,

Unique in that “Owner & Contractor” share Financial Risk & Both have Real incentive To Complete Project At lowest “Possible Cost”.

5th Category of Contract Fixed-Price- Incentive-fee Contracts

These are Same as “Fixed-Price contracts” Except have some “Provision for Adjustment” of the “Total Profit” by a formula. This Formula Depends on “Final Total Cost” at Completion of Project

Formula “Agreed to” in advance By “Owner & Contractor”. To use this Both “Project or Contract” Requirements Must be firmly established

Provides An incentive to Contractor To: a) Reduce Cost b) Increase profit Both “Owner & Cost” Share in “Risk & Savings”.

“Cost-Plus-Incentive- 6th Cat. “Cost-Plus-Incentive- Fee Contracts”

Same as: “Cost” Plus Contracts, Except have “Provide for” Adjustment of “Fee as” Determined By a Formula: Compares “Total Project Cost to Target Cost”. Formula agreed to in advance by “Owner & Contractor”. Used for “Long Duration” or “R&D Type Project”.

5. Contract Admin Cycle Contract Administrator is Responsible for Compliance By the Contractor to Contract's “Terms & Conditions” To Make Sure Final Product is “Fit for Use”.

Functions of contract administrator Include: Change Management Specification interpretation Adherence to Quality Warranties Subcontractor Management Production surveillance Waivers Contract breach Resolution of disputes Project Termination Payment “Schedule” Project Closeout