Integration and Test GLAST Large Area Telescope:

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
Advertisements

GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review I&T Plan.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 1 GLAST Observatory TVAC at NRL Aug 1, 2007 Neil Johnson NRL
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review TVAC at NRL? Status July 12, 2007 Neil Johnson.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT I&T GLAST Monthly Mission Review Nov 3, 2005 wnjohnson 1 Monthly Mission Review LAT Environmental Test Planning November 3, 2005 W Neil Johnson.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Environmental Test MGSE Design Concepts Rev 1.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Thermal-Vacuum Test Configuration.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST Large Area Telescope:
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Mechanical Integration
Environmental Test Planning
GLAST Large Area Telescope:
Baseline Environmental Test Flow at NRL
GLAST LAT System Engineering
GLAST Large Area Telescope
Peer Review Agenda (Suggested).
GLAST Large Area Telescope:
GLAST LAT System Engineering
LAT Pre-Environmental Test Plan
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
Integration and Test Organization Chart
Mechanical/Thermal Systems
Environmental Test Planning Meeting
GLAST Large Area Telescope
GLAST Large Area Telescope: I&T Test Readiness Review
LAT Environmental Test Planning and Design Review
Introduction and Overview
Design Integration and Analysis
Presentation transcript:

Integration and Test GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Pre-Environmental Test Review Integration and Test Ken Fouts SLAC

Overview Review Current Status LAT Instrument Configuration Procedure Status Review Plan for Environmental Test Organization Pathfinding Summary LAT I&T Operations at NRL EGSE/MGSE Readiness Test Configurations and flow Schedule Review

Current Configuration As built configuration LAT-DS-1624 LAT Top Assembly Radiators ACD, Radiator & LAT MLI

I&T Process Procedures Document Title Status LAT-PS-03263-01 Fastener Installation and Torqueing Procedure Released LAT-PS-04727-01 Connector Mate and Demate LAT-MD-04601-01 LAT I&T eLog Book Implementation Plan LAT-PS-03291-01 Flight Hardware Bag and Purge Procedure LAT-PS-04436-01 AeroGo Bearing Reference Guide LAT-PS-04511-04 LAT Data Collection Procedure LAT-MD-01533-01 LAT EGSE Plan I&T Standard Processes will continue to be used at NRL

Key Documents for Environmental Test Title Status LAT-PS-6898 LAT Environmental Test Implementation Plan In Signoff LAT-PS-07929-01 LAT Shipping Container Procedure Released LAT-PS-07728 LAT Environmental Test Handling Procedure LAT-MD-02717-01 LAT Environmental Test Sequence LAT-MD-01196-03 LAT Dynamics Test Plan LAT-MD-01600-03 LAT Thermal Vacuum Test Plan LAT-MD-02726-01 LAT EMI/EMC Test Plan LAT-DS-7411 LAT Environmental Test Wiring Diagram Key Environmental Test Planning has been completed

Environmental Test Configuration Drawings Title Status LAT-DS-06188 Acoustic Test Configuration Assembly Released LAT-DS-06185 Thermal-Vacuum Test Configuration Assembly Draft LAT-DS-06187 Horizontal Vibration Test Configuration Assembly LAT-DS-06190 Vertical Vibration Test Configuration Assembly LAT-DS-06186 Handling Configuration Assembly LAT-DS-06184 Transport Configuration Assembly LAT-DS-06189 EMI/EMC Test Configuration Assembly LAT-DS-06191 Mass Properties Configuration Assembly LAT Instrument Configuration for Environmental Tests is documented

I&T Documentation Drawings (Mechanical Assembly, Cabling, EGSE/MGSE interface, etc.) Test Performance and Operation Plan LAT-MD-02730 Test Sequence LAT-MD-00676 LAT Environmental Test Plans I&T Operating Processes and Procedures QA and Archive Assembly Instruction Data Sheet (AIDS) Electronic Logbooks (Component installation, Mate/Demate, Etc.) Non-Conformance Report (NCR) CM processes for document control, release and completion will be maintained.

LAT Environmental Test Organization Environmental Test Management Team is in place work planning and scheduling

LAT I&T Team has a proven track record for safe program execution

Pathfinding Summary (1 of 2) LAT Pathfinding Activity Documented in LAT-MD-07727 Objective: Identify and mitigate mechanical operations/handling risk. Pathfinder Lifting Operations Installation into and Removal from Shipping Container with the GPR. Installation into and removal from the Test Stand with GPR Onto and off of the Vibe Table with the GPR Test Stand Turnover with Complete Mass Simulator and SLAC lift slings Installation of the rotated test stand and LAT onto the TVAC table/Trolley Pathfinder Move Operations Transport weighted shipping container Move LAT in the test stand from clean tent to Sine Vibe. Move LAT and test stand from clean tent to EMI test chamber. Move LAT and test into Acoustic test chamber. Move LAT and test stand TVAC staging area and into chamber. LAT-PS-07728 LAT Handling Procedure was developed during Pathfinding

Pathfinding Summary (2 of 2) Pathfinding Miscellaneous Operations/Installations Radiator installation/removal procedures including timed trial runs (adhesive pot life) TVAC prep work – mount S/C simulator sink plate TVAC configure – another rotation and install on Table/Cart Improved handling procedures for installation and use of test stand extensions Installation of TVAC STE – heater cages, ACD sink plates Transport into TVAC chamber and working around LAT and STE inside chamber. TVAC cable installation and routing Pathfinding activity mitigated potential risk for critical handling operations

NRL Operating plan is similar to SLAC Operations I&T Operating Plan The detailed LAT I&T schedule is maintained in MS Project by the I&T Scheduler. Schedules will be updated daily via the afternoon meeting with progress from that day. NRL Operations Normal work time will be 7:00am-8:00pm. “Shifts” will run nominally 7:00am-4:00pm and 12:00am-8:00pm. Shifts will be adjusted to go around the clock as the need arises. Daily morning meeting at 7:00am and afternoon meeting at 3:00pm. Daily phone tag-up to SLAC at 4:00pm. Minimum staff when the instrument is under test is 2 LAT Electrical Test staff members. TVAC will be staffed 24/7 Extended shifts and/or Saturdays will be used to maintain schedule as required. LAT Instrument Handling LAT will be configured in the portable clean tent whenever possible. The LAT will be bagged to maintain cleanliness when outside of the controlled environment. Cleanroom and ESD protocol will be maintained during all LAT handling operations. NRL Operating plan is similar to SLAC Operations

Troubleshooting in I&T No troubleshooting will be done without appropriate disposition on an NCR. When an anomaly occurs: The test set-up is frozen The instrument and test equipment is safed. The test set-up and instrument configuration is reviewed and documented by the Test Conductor. Test conductor notifies the TD, Subsystem Engineer and QA. QA initiates an NCR with information from TC and convenes MRB. At a minimum, MRB consists of the Test Director, Test Conductor, Subsystem Engineer and QA. MRB will provide detailed disposition for troubleshooting. The test procedure will be redlined or a separate procedure will be written (as defined by MRB) to document the troubleshooting activity defined in the disposition. Troubleshooting will be done in accordance with the I&T Implementation Plan

Problem Resolution in I&T False Alarm! Issue Closed Problem Observed Inspection, Testing, Data Analysis (HW, SW, Data) Test Conductor Error Corrective Actions No Flight HW Damaged Non Conformance Report (NCR) Test Procedure/Set Up Error Test Equipment Problem Yes Categorize by Test Conductor and/or Test Director Possible Flight HW Failure HW MRB Troubleshoot HW Root Cause Identified Corrective Actions Possible Flight SW Failure SW JIRA Troubleshoot SW Root Cause Identified Corrective Actions CCB Action Problem Resolution will continue to use the NCR process

Network Configuration for LAT Operations at NRL VSC and Power Rack will move with the LAT Instrument

LAT I&T CCB Controls Test Configuration Software packages listed below are controlled by CCB in the locations listed LAT-MD-03492 LAT I&T CM/CCB Procedure establishes the process for configuration control of flight and test software installed on the LAT and EGSE test stations. LAT I&T CCB is held on an as needed basis and requires the following minimum representation: I&T Manager (CCB Chair) I&T Electrical Test Lead Systems Engineering Online Manager Flight Software Quality Assurance DAQ Electronics LAT I&T CCB has been successful in controlling software installation/changes

Environmental Test MGSE/STE Transport Container Manufacture complete; Analyses complete Proof test complete Demo Road Test complete Available at SLAC Test Interface Plate Complete Test Stand/Spreader Bars Complete, used in pathfinding TVAC Sink Plates – ACD & S/C Simulator Complete, used in pathfinding 2 TVAC Cal-Rod Cage Acoustic Simulator Mass Properties Plate Load Cell Interface in manufacture – Complete All MGSE has been used in dry run or pathfinding activity

GPR, Lift Fixture Proof Test at SLAC Proof Test of the 4x4 Lift Fixture and GPR Rotation Stand w/ GPR Proof Test

NRL Facility has been upgraded to meet LAT Operational Requirements Facilities Thermal Vacuum Test Cables and Port Plates – complete Mechanical analyses complete Trolley (cart) – complete, used in pathfinding Chamber rails upgrade – complete and proof tested Pathfinding 2 – complete Chamber refurb, cleaning and recommissioning - complete GSE bakeout and STE Validation – ECD: 5/16/06 Acoustic Test Ramp manufacture complete Vibration Test Expander head load frame procurement - delivered Load frame manufacture – complete Installation and proof test - complete EMI/EMC Test Ramp manufacture – complete, used in pathfinding NRL Facility has been upgraded to meet LAT Operational Requirements

Environmental Test Sequence Baseline Ship to Rev date: 24 April 2006 C F S NRL NRL Post-Ship at SLAC Sine Vibe EMI/EMC Acoustic Receive, C Mount T Unpack L E L L L L L Radiators L L Pre Post - Axis Pre - TV T - Bal T - Cycle Final Weight Remove Radiators CG Pack LAT Ship to C S L S L C C F S Spectrum TESTING IN THERMAL VAC CHAMBER L L Limited Performance Test Limited Performance Test F F LAT Functional and FSW Test C C Comprehensive Performance Test Comprehensive Performance Test T T TCS Functional Test TCS Functional Test S S SVAC Test SVAC Test E E EMI/EMC Emissions/Susceptibility Test EMI/EMC Emissions/Susceptibility Test

Sine Vibe Configuration

Vibration Facility Layou

Radiator Installation Radiator flange access Radiator installation test

EMI/EMC Test Configuration

EMI Chamber Layout

Acoustic Test Configuration

Acoustic Test Layout

TVAC Configuration

Thermal STE Heater Cage Configuration S/C Sink Plate Configuration Installation of ACD Sink Plate Panels (5)

TVAC Layout

Environmental Test Schedule (1 of 3)

Environmental Test Schedule (2 of 3)

Environmental Test Schedule (3 of 3)

Staffing Plan Current staffing plan for NRL: Single long shift 5-6 days per week for Sine Vibe, Acoustic, EMI/EMC tests. 24/7 staffing for TVAC duration. SLAC will average 14 people including I&T Management I&T Electrical I&T Mechanical Mechanical Design Online SVAC QA DAQ

Staffing Plan (1 of 2)

Staffing Plan (2 of 2)

Environmental Test Staffing Summary

Summary The LAT baseline performance has been demonstrated post shipment to NRL. The LAT instrument as-built configuration is in accordance with current engineering. Documentation, preparation and pathfinding for handling and configuring the LAT for Environmental Test have been completed. All EGSE and MGSE has been identified and its use has been demonstrated. LAT I&T has completed the necessary preparation to begin the LAT Instrument Environmental Test.