CERN SPL Fundamental Power Coupler Progress report

Slides:



Advertisements
Similar presentations
Higgs Factory, HF2014 at IHEP, 2014 Oct. 101Eiji Kako (KEK, Japan) High Power Couplers for Higgs Factory Eiji KAKO (KEK, Japan)
Advertisements

Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
FCC week March 2015 Marriott Georgetown Hotel Superconducting RF: Novel Cavity Concepts & Cryomodules Fundamental Power Coupler (FPC) Eric Montesinos,
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
Eric Montesinos Challenges in
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Cleaning Methods of SRF Power Couplers Mircea Stirbet Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1) 8/9 December.
Possible proposed designs Part I : general considerations SPL power coupler March 16, 2010Eric Montesinos / CERN-BE-RF-SR.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
Coupler without copper coating S. Kazakov 11/13/2013.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Zenghai Li SLAC National Accelerator Laboratory LHC-CC13 CERN, December 9-11, 2013 HOM Coupler Optimization & RF Modeling.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Recent Fundamental RF Power Coupler developments at CERN First SLHiPP meeting CERN, Geneva, 8 & 9 December 2011.
1.3GHz Input Coupler for ILC
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
20 years of high average Fundamental Power Coupler designs at CERN CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of many colleagues CWRF.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
LHC Crab Cavity Engineering Meeting, FNAL RF Power Amplifiers (PA) & Fundamental Power Couplers (FPC) December 2012 Eric Montesinos,, CERN, BE-RF-PM.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 17 th December 2013.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
Mechanical design considerations for beta=1 cavities OC, 28/July/20111SRF2011 Chicago O. Capatina, S. Atieh, I. Aviles Santillana, G. Arnau Izquierdo,
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
R. Bonomi - SLHiPP2, Catania 3-4/5/20121 SPL Thermal Studies R. Bonomi Superconducting linacs for high power proton beams - Catania, 2012.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
Cleaning Methods of SRF Power Couplers Mircea Stirbet TTC Meeting Milan, Italy 28 th Feb – 3 rd Mar 2011.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
CERN SPL Fundamental Power Coupler Progress report SLHiPP-4 meeting, 2014, CERN, Geneva Eric Montesinos, CERN-RF SLHiPP-4, May, CERN, Geneva Eric.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
LCWS11 WG4 Fully featured accelerating structure engineering design
Status of the M-ECCTD F. Peauger - P. Bosland
Tongming Huang (IHEP) On behalf of the power coupler working group
CERN – Zanon discussions
WP5 Elliptical cavities
Power Couplers, HOM Couplers and Tuners for the XFEL
Power coupler at DESY & for XFEL
Chris Adolphsen Sergei Nagaitsev
World-Wide Fundamental Power Coupler meeting #3
Manufacturing of the IFMIF series power couplers
World Wide Fundamental Power Coupler meeting #3
SNS Fundamental Power Coupler History
V. Veshcherevich Cornell University
Main Coupler R&D at DESY
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
DQW HOM Update and Recent Developments
CEPC Waveguide HOM 5-cell and 2-cell Cavity Study and EP Facility
System tests at CEA O. Piquet 19/03/2019
V. Veshcherevich Cornell University
IOT operation in the SPS Long term experience TWC 800 MHz
Presentation transcript:

CERN SPL Fundamental Power Coupler Progress report SPL meeting CERN, 6 - 7 December 2012 Eric Montesinos, CERN BE-RF-PM

Contents Introduction SPL coupler project Next steps Key R&D results : SPL meeting, CERN 5-6 December 2012 Contents Introduction CERN RF Fundamental Power Coupler team SPL coupler project SPL FPC initial design proposals March 2010 Coupler review June 2010 SPL Coupler project Construction Assembly in DESY clean room Double walled Tubes (DT) LLRF tests High Power tests at CEA : TW High Power tests at CEA : SW Next steps Key R&D results : Mono bloc waveguide Test box Double walled Tube as support for cavity High Average power air cooled couplers

CERN RF Fundamental Power Coupler team SPL meeting, CERN 5-6 December 2012 CERN RF Fundamental Power Coupler team CERN Machine Design Prototype Series SPS 200 2001 LHC 400 2006 Linac 4 Under Way SPL cylindrical Under test SPL planar HIE-Isolde Crab Cavities To come SPS 800 LIU- SPS 200 SPS 200 MHz coupler LHC 400 MHz coupler Linac 4 352 MHz coupler SPL 704 MHz couplers HIE Isolde 100 MHz couplers

CERN RF Fundamental Power Coupler team SPL meeting, CERN 5-6 December 2012 CERN RF Fundamental Power Coupler team Machine Design Prototype Tests ESRF 300 kW CW ANL-APS 100 kW CW SOLEIL Under way SOLEIL 352 MHz coupler design ESRF 352 MHz coupler Argonne APS 352 MHz coupler

SPL FPC initial design proposals SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 SPL FPC initial design proposals RF Characteristics f0 704.4 MHz Power levels 1000 kW pulsed 0.4 + 1.2 + 0.4 = 2.0 ms 50 Hz (20 ms) 100 kW average Cavity design gradient 19-25 MV/m Qext of input coupler 1.2 x 106 Input line Ø 100 / 43.5 mm = 50 Ω (from the cavity design) Waveguides WR 1150 Cylindrical Window CEA HIPPI (baseline) Disk Coaxial window Disk WG Window

SPL FPC initial design proposals SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 SPL FPC initial design proposals Window-Ceramic-Antenna 275 Series 4-8 MCHF Baseline: CEA Saclay coupler To be upgraded for SPL cryomodule compatibility Kept open the possibility to use another design, to be fixed in March 2010 Comparison basis: RF power capability Low heat load Tuning capability (fixed coupling, adjustable coupling) Conditioning time Contamination during beam part assembly Easy installation Integration with the cryomodule Easy operation Cost 15 kCHF 4.125 MCHF 30 kCHF 8.25 MCHF 14 kCHF 3.85 MCHF 15 kCHF 4.125 MCHF

March 2010 Coupler review Review committee members : Presenters : SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 March 2010 Coupler review Review committee members : Ali Nassiri (Chair) Wolf Dietrich Moeller Mark Champion Sergey Kazakov Mircea Stirbet Presenters : Amos Dexter & Rama Calaga (Multipacting simulations) Miguel Jimenez (Vacuum) Sergio Calatroni (DT Coating) Ofelia Capatina & Vittorio Parma (Cryomodule integration) Eric Montesinos (FPC) Technical Choices Single window coupler Fixed coupler With a Double Walled Tube Mounted in clean room with its double walled tube horizontally in only one operation Vertically below the cavity and will be a support for the cavity (first time worldwide) With a HV DC biasing capacitor Air cooled

Two designs have been validated SPL meeting, CERN 5-6 December 2012 Two designs have been validated Cylindrical ceramic window Coaxial disk ceramic window

Same Waveguide with integrated matching step (instead of a doorknob) SPL meeting, CERN 5-6 December 2012 Same Waveguide with integrated matching step (instead of a doorknob) And same DC capacitor Same Double Walled Tube (Outer line of a coaxial transmission Line) With same interface flange to cryomodule

Cylindrical window Advantages Drawbacks SPL meeting, CERN 5-6 December 2012 Cylindrical window Advantages LHC window with high power capability due to its solid copper collars Simple to cool down with air Absolutely free of mechanical stress onto the antenna “plug and play” waveguide and DC capacitor, no stress to the ceramic Drawbacks Ceramic is part of the matching system, imposing the waveguide position

Coaxial Disk window Advantages Drawback SPL meeting, CERN 5-6 December 2012 Coaxial Disk window Advantages Very simple and well mastered brazing of ceramic onto a titanium flange Simple to cool down with air “plug and play” waveguide and DC capacitor, no stress to the ceramic Drawback Ceramic is part of the matching system, fixing the waveguide position

SPL coupler project (June 2010) SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 SPL coupler project (June 2010) Four vacuum lines: 4 cylindrical window couplers 4 disk window couplers 8 Double walled Tubes 4 test boxes DESY clean process assembly (Jlab also proposed to help) CERN LLRF measurements CEA RF power tests (BNL also proposed to help)

Couplers construction SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 Couplers construction All parts have been produced by May 2011 (10 months) All components have been individually vacuum leak free tested before being sent to DESY for assembly

Couplers construction SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 Couplers construction All parts have been produced by May 2011 (10 months) All components have been individually vacuum leak free tested before being sent to DESY for assembly Specific transport boxes with springs as per tetrodes have been designed to avoid any shocks

Assembly in DESY clean room SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 Assembly in DESY clean room In June 2011, the four cavities were assembled in DESY clean room Use of a specially designed helicoflex seal

Assembly in DESY clean room SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 Assembly in DESY clean room In June 2011, the four cavities were assembled in DESY clean room Use of a specially designed helicoflex seal Thanks to DESY colleagues who have performed a very good job and to a very good preparation job of the jointing surfaces all four cavities were leak free

Double walled Tube (DT) SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 Double walled Tube (DT) Copper sputtering removed with simple water Ultra Sonic cleaning process Mistake in the machining process : An additional machining step not included in the lists has erased all the care put into the preparation of DT Decision to continue the first two vacuum lines with NOT copper sputtered DT : Lead into a very important delay onto the schedule Will limit average power during tests

LLRF measurements at CERN (summer 2011) SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 LLRF measurements at CERN (summer 2011) S11 with 2 x N/WG adaptors + 2 couplers + 2 DT + test box : Cylindrical windows = -26.5 dB Coaxial planar disk = -18 dB Pfwd/Prev (S11) at CEA premises with 2 couplers + 2 DT + test box : Cylindrical window = -17 dB Coaxial planar disk = -40 dB Even with only -16 dB, 1 MW will reverse 25 kW, acceptable with CEA premises, thanks to their circulator

RF power tests at CEA cylindrical window SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 RF power tests at CEA cylindrical window First test were to check RF, so No bake out to take no risk with the test box helicoflex gasket Static vacuum ~ 2 x 10-7 mbar Pulse mode process After 3 weeks, 50 kW 20 µs - 20 Hz We Stopped the test

RF power tests at CEA disk windows SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 RF power tests at CEA disk windows In the meantime, second test box with two disk window couplers has been baked out at CERN No helicoflex leak Very slow heating up and heating down ramps 10 C / hour Maximum temperature during 48 hours was only 150 C Nitrogen onto copper rings to avoid any oxidization Very good static vacuum after the process ~ 1 x 10-10 mbar (vs 5 x 10-7 mbar before starting the bake out) Pulse mode process After two weeks : 1000 kW 2 ms - 20 Hz Ultimate goal of 1000 kW 2 ms - 50 Hz was not possible due to losses in uncoated DT limitation

RF power tests at CEA cylindrical window SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 RF power tests at CEA cylindrical window We also baked out the first test box with two cylindrical windows at CERN No helicoflex leak Very good static vacuum after the process ~ 1 x 10-10 mbar (vs 2 x 10-7 mbar before starting the bake out) Pulse mode process After 1 week: 1000 kW 2 ms - 20 Hz Ultimate goal of 2 ms - 50 Hz was not possible due to losses in uncoated DT limitation

SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 TW tests ok (May 2012) Both coupler versions have reached TW maximum values of 1 MW 2 ms - 20 Hz Limitation of average power to 20 Hz instead of 50 Hz due to uncoated TD Successful TW tests

SW tests with cylindrical window SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 SW tests with cylindrical window A variable short circuit has been designed and constructed at CERN for SW test Steps of 20 mm to have enough accuracy performing tests within all phases

SW tests with cylindrical window SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 SW tests with cylindrical window We started SW tests in pulse mode With 500 µs – 8Hz : Up to 500 kW, no trouble Arcing when reached 575 kW It seemed to be air side as there was no vacuum activity There was no arc detector to stop the test, a photomultiplier modulated RF, and it was possible to hear arcing in the WG system

SW tests with cylindrical window SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 SW tests with cylindrical window Air side arcing were confirmed when dismounting WG Input coupler presented some impressive arcing traces Output coupler was without any trouble

SW tests with cylindrical window SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 SW tests with cylindrical window Analyzing black deposit, we only identified : Gold coming from upper gold platted copper collar Copper coming from lower copper collar There were without any doubt electrical arcing (>1’000) between two copper brazed collars The only positive point is that ceramic remained vacuum leak free

Improvement of cylindrical window SPL meeting, CERN 5-6 December 2012 Improvement of cylindrical window Air inlet through WG short circuit A trick given by Michel Langlois (ex-Thales tube designer) is to improve air flow in the critical area in order to avoid ionization of the air around the ceramic itself improve air cooling around ceramic with a short circuit as air inlet Inserting PEEK screen all around ceramic PEEK Screen all around ceramic

SW tests with coaxial disk windows SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 SW tests with coaxial disk windows We then decided to start SW tests with coaxial disk windows Up to date, we performed: 1000 kW 1.5 ms – 4 Hz Some RF leaks were observed CEA was finally not sure if these RF leaks were coming form couplers

SW tests with coaxial disk windows SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 SW tests with coaxial disk windows Last week, while preparing test box with copper coated DT, we observed some arcing traces on the outer line in front of the inner contact These traces were not present after TW test There were no arc detector fault during the whole SW test (interlock active) Arcing traces on inner line Arcing traces on outer line

SW tests with coaxial disk windows SPL meeting, CERN 5-6 December 2012 SW tests with coaxial disk windows 2009 2010 2011 2012 2013 Still waiting items to find an explanation Possible candidates : Not enough springs ensuring specific 1MW RF contact : Inner ceramic is brazed with a stainless steel nut Air cane is built with a specific bolt Air cane is screwed compressing springs which when relaxed ensure 1 MW RF contact Contact surfaces were not flat enough 2. 3. 1.

SW tests conclusion Cylindrical window couplers have performed SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 SW tests conclusion Cylindrical window couplers have performed 575 kW 500 µs - 8 Hz full reflection all phases -> very strong arcing, interlock not operative Coaxial disk window couplers have performed 1000 kW 1.5 ms - 4 Hz full reflection all phases, no interlock (operative), but few arcing traces (to be understood and explained) SW tests are not conclusive, work still have to be done

Coated DT 6 DT with new copper sputtering have been processed : SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 Coated DT 6 DT with new copper sputtering have been processed : Test with 150 Bars water have been performed TD qualified 2 have been provided to cryomodule team Unfortunately DESY clean room was not anymore available CEA proposed to assemble couplers and copper sputtered DT onto test boxes in ‘L’orme les Meurisiers’ premises : One Test box with two copper plated DT and two coaxial disk window has been assembled last week

Next steps Second test box will be assembled beginning 2013 SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 Next steps Second test box will be assembled beginning 2013 Cylindrical or Disk windows ? Decision after cylindrical arcing analysis Beginning 2013, final tests at CEA with : 1000 kW TW 2 ms – 50 Hz 1000 kW SW limited to 200 µs – 50 Hz

Next steps EB welding of cryostat flanges will be done afterward SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 Next steps EB welding of cryostat flanges will be done afterward Study of clean room tooling for assembly onto SPL cavity has started Assembly of couplers onto cavities in CERN clean room goal remains mid-2013 RF power tests on cavity asap

Next steps Provide a CERN clean assembly premises for couplers SPL meeting, CERN 5-6 December 2012 2009 2010 2011 2012 2013 Next steps Provide a CERN clean assembly premises for couplers Continue all remaining couplers power tests with CERN amplifiers when available Longer term basis : After qualification of SPL cavities, make a test with ‘dirty’ couplers (ISO 7 instead of ISO 4 for example, tbd), to quantify coupler cleanliness impact onto cavity field

Key R&D results Mono bloc waveguides SPL meeting, CERN 5-6 December 2012 Key R&D results Mono bloc waveguides 1. 2. ‘Plug and Play’ waveguide with matching step and DC capacitor included : Connect the waveguide to the body line Insert the contacts ring Final assembly of air cooling system No doorknob, reduced height, with no mechanical stress to the ceramic 3.

Key R&D results Test box SPL meeting, CERN 5-6 December 2012 Key R&D results Test box All in one, only two covers conditioning test box Pros : Easier (not easy) copper sputtering Self supporting shape Easily cleanable for SRF needs, can be used for several sets of coupler (if large series : SPL, ESS, …) Cons : Helicoflex faces to be very well prepared Self-supporting structure : heavy weight

Key R&D results 3D printing & RF SPL meeting, CERN 5-6 December 2012 Key R&D results 3D printing & RF Successfully made available 3D printing for RF tests with a special silver paint Machined 3D printed @ 400 MHz S21 = 0.01 dB S11 = -40 dB S21 = 0.03 dB S11 = -25 dB Delay [days] Cost [CHF] Machined 3D 15 5 9000 3800

Key R&D results High average power air cooled couplers SPL meeting, CERN 5-6 December 2012 Key R&D results High average power air cooled couplers Cylindrical window : TW : 1000 kW 2 ms - 20 Hz SW : 550 kW 500 µs - 8 Hz Coaxial disk window : TW : 1000 kW 2 ms - 20 Hz SW : 1000 kW 1.5 ms - 4 Hz

Acknowledgements SPL coupler review committee : DESY : CEA : ESRF : SPL meeting, CERN 5-6 December 2012 Acknowledgements SPL coupler review committee : Ali Nassiri, Wolf Dietrich Moeller, Mark Champion, Sergey Kazakov, Mircea Stirbet, Amos Dexter, Rama Calaga, Miguel Jimenez, Sergio Calatroni, Ofelia Capatina, Vittorio Parma DESY : Wolf-dietrich Moeller, Axel Matthaisen, Birte Van der Horst, and local team CEA : Stephane Chel, Guillaume Devanz, Michel Desmond, and local team ESRF : Jorn Jacob, Vincent Serriere, Loys, Jean- Maurice Mercier, Didier Boillot APS : Ali Nassiri, Doug Horan, Gian Trenko, Dave Brubenker, and local team CERN : Mechanical & Material Engineering group : Francesco Bertinelli, Ramon Folch, Serge Mathot, Agostino Vacca, Thierry Tardy, Thierry Calamand, Thierry Renaglia, Ofelia Capatina, Marc Polini, Laurent Deparis, Philippe Frichot, Jean-Marie Geisser, Jean-Marc Malzacker, Pierre Moyret, Alain Stadler Vacuum, Surface & Coating group : Miguel Jimenez, Sergio Calatroni, Wilhelmus Vollenberg, Marina Malabaila, Nicolas Zelko Magnets, Superconductors & Cryostats : Vittorio Parma, Arnaud Van de Craene, RF group : Sebastien Calvo, Antoine Boucherie, all FSU-BE03 members

Thank you very much for your attention SPL meeting, CERN 5-6 December 2012 Thank you very much for your attention