Linac4-PSB 160 MeV connection readiness review ( TE/VSC )

Slides:



Advertisements
Similar presentations
Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
Advertisements

Progress and Plan for Superconducting RF Cavity RF Group.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
H 0 -H - PSB INJECTION VACUUM REQUIREMENTS C. Pasquino, P. Chiggiato, J. Hansen PSB - H0-H- injection review meeting, 18th April 2013.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato LIU - PSB Ho-H- Injection Meeting 1.
Linac 4 PSB BI LTB LT L4T m from PIMS to foil: m new line (to BHZ20) m present Linac2 line Active elements : 4+2bendings; quads,
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS.
Vacuum sectorisation H- Injection Some history Wim Weterings
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Vacuum chamber fabrication Dates refer to end of fabrication, then 8 weeks are to be added for NEG coating, bake-out, acceptance tests, etc. EN-MME LNR.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
Essential Consolidation Items for LIU-PSB Collection from LIU-PSB WP holders.
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
LIU-SPS planning – provisional LS1 / LS2 BLM, BPM MKE/MKDV/H aC 1 sextant aC 5 sextants RF 200 MHz LSS3 RF 200 MHz preparation RF 200 MHZ building.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
PS - SPS Day 18-Jan-2006 PS Ring by Ray Brown.. 2.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Wim Weterings Remy Noulibos
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
Survey on “Chargés de Consignation” Status Update
Vacuum System P. Chiggiato TE-VSC
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
High energy beam transport.
Linac4-PSB 160 MeV connection readiness review
LIU – EVM status and next steps
AFC 2017 (and 2018) AFC timeline:
LIU & MME ACTIVITIES Fabrication Alessandro DALLOCCHIO on behalf of the EN-MME Workshop LIU & MME ACTIVITIES – Fabrication A. Dallocchio.
BA6 – crab cavity activities in EYETS
Risk Assessment / Mitigation / Spares
LIU – EVM status and next steps
SPS - EYETS 2016/17 Vacuum systems planning
Naming convention Rules
Planning and Installation
EC Activities Status for the LIU
Status of the BI Work Package in the LIU-PSB frame
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Installations, modifications, consolidation in 2005:
Renovation of the 45-year old PS magnets
Update on the Ethernet Network Installation Campaign
WPs concerned by L4 connection:
TE-MSC activities in SPS during YETS
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
K. Foraz on behalf of OSS members
Coldex disinstallation
East Hall under construction
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Linac4-PSB 160 MeV connection readiness review ( TE/VSC ) Tuesday 30 August 2016 30 August 2016 Linac4-PSB 160 MeV connection readiness review

TE-VSC Table of Contents: Equipment dismantling Equipment installation Risks / Mitigation Additional information Summary José de la Gama Jan Hansen Jose Somoza 30 August 2016 Linac4-PSB 160 MeV connection readiness review Equipment status (Linac4 and LIU-PSB) Jan Hansen - TE/VSC

Layout overview L4 L4T L2 LBE PSB LBS LT BI PS LT-BHZ20 LBE LBS PSB LT BI PS 30 August 2016 Linac4-PSB 160 MeV connection readiness review Equipment status (Linac4 and LIU-PSB) Jan Hansen - TE/VSC

Equipment dismantling Sector or Machine Vacuum equipment dismantling time Request for Help Remarks Disconnect L4T line (HST) -Reuse of chambers and pumps in L4 and PSB 3 days EN/HE transport and handling  Obsolete cables from HST Disconnect transfer line LT-BHZ20 to PSB and dismantle LINAC 2 -WASTE (drift chambers and chambers inside magnets) Cables obsolete  2 weeks    Material from L2 needed for LBS line. Dismantle LBE line and partly LBS line. -Reuse of cables 1 week  LBS shall be modified at the same time as the LBE line (common primary pumping) Disconnect and dismantle parts of BI line in the PSB -Drift chambers will be modified and reinstalled. -Magnet vacuum chambers will be cut and reinstalled in new magnets --Reuse of all cables -Waste (Ion pumps)  2 week  EN/HE: transport and handling EN/MME: Cut of chambers  Injection Kickers and Septa shall be dismantled and disposed by TE/ABT Disconnect PSB injection zone and dismantle part of the PSB -Vacuum supports and chambers will be reinstalled or stored for future installation Waste (Ion pumps) EN/HE: transport and handling   BHZ 162 and BHZ 11: Replace old chambers with new vacuum chambers outside the tunnel / / 30 August 2016 Linac4-PSB 160 MeV connection readiness review Equipment status (Linac4 and LIU-PSB) Jan Hansen - TE/VSC

Equipment installation System or Machine Installation of equipment Installation time (Acceptance test not included) Groups required before TE/VSC work can start Remarks L4T transfer line in LINAC4 RF cavity BI equipment Vacuum chambers and supports Mechanical: 2 weeks Controls 1 week Mechanical: BE/BI, BE/RF, EN/ACE (survey) Controls: EN/EL  The installation of BHZ20 cannot start before vacuum chambers is installed in the new wall between L4 and L2 Connection L2 to L4. Transfer line LT-BHZ20 to PSB Vacuum chambers and supports (L4 to L2) and L2 LT-BHZ20 Mechanical: 1 week Controls: 2 weeks Mechanical: TE/MSC, EN/ACE (survey)  Cabling shall be moved from L2 equipment room to PSB and PS vacuum equipment rooms, LBE line and parts of LBS line. NEW beam line Magnets, BI equipment, Dump, vacuum chambers and supports. Controls: 1 week Bakeout: 1 week (DUMP) Mechanical: TE/MSC, EN/STI, EN/ACE (survey)  LBS must be modified at the same time as the LBE line (access; common primary pumping) BI line in the PSB BI.DIS; BI.SMV; BI. BTV; BI.BVT; BI.DHZs (7) Mechanical: 3 weeks Bakeout: 1 week (BI.SMV)  Mechanical: TE/ABT; TE/MSC, BE/BI; EN/STI, EN/ACE (survey),  -Require Radioactive workshop EN/MME shall be available for cutting and welding of existing chambers for magnets and drift chambers. PSB injection zone and All sectors in PSB BR.BSW; BR.BHZ11. BR.BHZ162, BR.KSWs; BR.BTV; New internal dumps, Vacuum pumps. Create new vacuum sectors Bakeout: 1 week (sector 30) Mechanical: TE/ABT TE/MSC, BE/BI; EN/STI, EN/ACE (survey),  - The BHZ162 and BHZ11 will be fitted with new vacuum chambers and sector valves outside the tunnel. -The positioning of BHZ injection chambers will be done by TE/MSC and TE/VSC in the tunnel. 30 August 2016 Linac4-PSB 160 MeV connection readiness review Equipment status (Linac4 and LIU-PSB) Jan Hansen - TE/VSC

Risks / Mitigation System or machine List of major Risks Mitigation Remarks L4T transfer line in LINAC4 None Connection L2 to L4. Transfer line LT-BHZ20 to PSB -Magnetic field from PS main magnets -Add extra shielding (Mu-metal)  None LBE line and parts of LBS line. -Magnetic field from LT line magnets . BI line in the PSB Insufficient cooling of head and tail dump would lead to higher outgassing and require extra pumping.  PSB injection zone and All sectors in PSB -Misalignment between old (unknown none conformities) and new installation. -Delays due to difficult installation (space) -Higher working temperature of dumps with respect to technical specification, -Higher outgassing of materials with respect to technical specification -Make cooling test of dumps. -Measure total outgassing of all components to be installed None. 30 August 2016 Linac4-PSB 160 MeV connection readiness review Equipment status (Linac4 and LIU-PSB) Jan Hansen - TE/VSC

Additional information Strong interdependences with other groups: All equipment's to be installed in the vacuum system have to pass a vacuum acceptance test. Equipment to be tested or none conform to the specified vacuum technical requirements cannot be considered as ready for installation. EN/HE require all power to be cut for removal cables. So no vacuum test can be done in the tunnel during this period. Manpower: Difficult to hire extra manpower, so extra manpower has to be moved from lower priority activities. Issues / Concerns: Layout / Assembly drawings required for the installation are missing for 3 section and will only be created after the installation by EN/ACE. (unknown installation problems) The fabrication of the new BHZ vacuum chambers is on the critical path to be ready for installation by end of 2016 (No margin in planning. Fabrication is done by the same company producing the BSW chambers, (Single supplier)) Remarks: Vacuum commissioning can only start after all new cables has been installed and with power in the tunnel. A bakeout is required of the septa in sector BI and BR30 after the finally closure of the vacuum system. No other activity can take place in the septa zones during this time. 30 August 2016 Linac4-PSB 160 MeV connection readiness review Equipment status (Linac4 and LIU-PSB) Jan Hansen - TE/VSC

Summary (1) TE/VSC vacuum equipment is expected to be ready for connection by the end of 2016. All purchase orders are in place. Preparation of BHZ magnets with new vacuum chambers can only start after removal of the BHZ magnets from the tunnel. Re-cabling of LT-LBE-BI lines and PSB injection are required before commissioning of the vacuum system 30 August 2016 Linac4-PSB 160 MeV connection readiness review Equipment status (Linac4 and LIU-PSB) Jan Hansen - TE/VSC

Summary (2) The Modification and installation of the vacuum chambers and vacuum equipment are highly dependent on other groups. TE/VSC need EN/MME available for cutting and welding of vacuum chambers including radioactive workshop (building 109) All equipment to be installed in the vacuum system have to be vacuum acceptance tested. Only accepted material can be considered as ready for installation. PSB Layout / Assembly drawings required for the installation are missing for some sections. 30 August 2016 Linac4-PSB 160 MeV connection readiness review Equipment status (Linac4 and LIU-PSB) Jan Hansen - TE/VSC

Extra slides (BHZ162) 30 August 2016 Linac4-PSB 160 MeV connection readiness review Equipment status (Linac4 and LIU-PSB) Jan Hansen - TE/VSC

Extra slides (BHZ11) End view Chamber adjustment Bellows compression And chamber adjustment Magnet BSW 30 August 2016 Linac4-PSB 160 MeV connection readiness review Equipment status (Linac4 and LIU-PSB) Jan Hansen - TE/VSC