Project Group CMS Trigger

Slides:



Advertisements
Similar presentations
Compact Muon Solenoid Thomas Themel TU Wien June 2009 Institut für Hochenergiephysik, ÖAW Control of the Global Muon Trigger Tobias Noebauer Ivan Mikulec.
Advertisements

Level-1 Trigger CMS Week, Brussels 14 Sep C.-E. Wulz Deputy Trigger Project Manager Institute of High Energy Physics, Vienna Prepared with slides/material.

J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
W. MajerottoRECFA, Innsbruck, 26 March ‘04 High Energy Physics in Austria W. Majerotto Institut für Hochenergiephysik d. Österr. Akademie d. Wissenschaften,
Department of Semiconductor Detectors HEPHY Scientific Advisory Board 21 Oct Thomas Bergauer.
Presentation of the CB Chairperson Candidates, 10 Dec Claudia-Elisabeth Wulz CB Chairperson Views and Ideas.
Vienna Group Trigger Meeting CERN, 6 Dec Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
The CMS Level-1 Trigger System Dave Newbold, University of Bristol On behalf of the CMS collaboration.
Institute for Anything of the University of Everything Claudia-Elisabeth Wulz New Physics at the LHC C.-E. Wulz (Institute of High Energy Physics) 1 Institute.
Institutional Responsibilities HEPHY – CMS Management Meeting June 20, 2013.
Vienna Group Trigger Meeting CERN, 18 July 2006 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menu Working Group CERN, 9 November 2000 Global Trigger Overview.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
On-line Software Requirements for the Global Trigger, the Global Muon Trigger and the Barrel Muon Trigger Track Finder Claudia-Elisabeth Wulz & HEPHY Vienna.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Global Trigger H. Bergauer, L. Boldizsár, A. Jeitler, P. Hidas, K. Kastner, S. Kostner, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
Pierluigi Paolucci - INFN of Napoli 1 Official Muon talks at 2006 Conferences 1.10th Topical Seminar on Innovative Particle and Radiation Detectors – 1-5.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Hannes Sakulin CERN Annual Review CERN, 24 Sep Global Trigger Global.
Compact Muon Solenoid Christian Hartl CERN Austrian Doctoral Student June 2009 Institut für Hochenergiephysik, ÖAW CMS Global Trigger Control and Monitoring.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
Global Muon Trigger / RPC Interface Warsaw and Vienna Groups RPC Electronics System Review Warsaw, 8 July 2003 presented by Claudia-Elisabeth Wulz.
Global Trigger, Global Muon Trigger H. Bergauer, L. Boldizsar, A. Jeitler, P. Hidas, K. Kastner, S. Kostner, N. Neumeister, M. Padrta, P. Porth, H. Rohringer,
Hardware: Software:
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
Vienna Group Discussion Meeting on Luminosity CERN, 9 May 2006 Presented by Claudia-Elisabeth Wulz Luminosity.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
Global Trigger, Global Muon Trigger H. Bergauer, Ch. Deldicque, J. Erö, A. Jeitler, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M.
PERG Seminar Warsaw University of Technology, Collaboration of particle physicists with electronics engineers Grzegorz Wrochna Soltan Institute.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
1 J. Varela, CMS Trigger, RT09, Beijing, May 2009 J. Varela IST/LIP Lisbon CMS Trigger Project Manager 16 th IEEE NPSS Real Time Conference May 10-15,
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
The Control and Hardware Monitoring System of the CMS Level-1 Trigger Ildefons Magrans, Computing and Software for Experiments I IEEE Nuclear Science Symposium,
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
21 October 2010 Vasile Mihai Ghete CMS Trigger Research Project HEPHY Scientific Advisory Board.
Digital Trigger System for the COMPASS Experiment
CLAS12 DAQ & Trigger Status
CMS Trigger Supervisor Framework
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
Commissioning of the ALICE HLT, TPC and PHOS systems
Status of CMS and the Austrian Contribution to the Trigger System
Kevin Burkett Harvard University June 12, 2001
CLAS12 First Experiment Workshop Report
Special edition: Farewell for Valerie Halyo
CMS Goal of the experiment
The First-Level Trigger of ATLAS
Regional Cal. Trigger Milestone: Production & Testing Complete
ATLAS: Level-1 Calorimeter Trigger
Special edition: Farewell for Stephen Bailey
Preparation of the CLAS12 First Experiment Status and Time-Line
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Special edition: Farewell for Eunil Won
Commissioning of the ALICE-PHOS trigger
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
11th Pisa meeting on advanced detectors
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Global Trigger and Global Muon Trigger
Global Trigger and Global Muon Trigger Latency
Plans for the 2004 CSC Beam Test
Presentation transcript:

Project Group CMS Trigger C.-E. Wulz HEPHY Scientific Advisory Board Meeting 21 Sep. 2009

The CMS Experiment It searches for answers to fundamental physics questions such as the origin of mass the nature of electroweak symmetry breaking unification of theories particle-antiparticle asymmetries the nature of dark matter extra dimensions HEPHY is involved in: Tracker Trigger and Muon System Physics 21 Sep. 2009 C.-E. Wulz

CMS runs as a complete experiment The recently terminated data taking period with cosmic muons at full magnetic field marks the first occasion where data were recorded with the entirety of CMS, and the full suite of LHC Level-1 triggers. 21 Sep. 2009 C.-E. Wulz

CMS Trigger Group Members Physicists (7 FTE): V. Ghete, M. Jeitler, I. Mikulec, H. Rohringer, J. Strauss, A. Taurok, C.-E. Wulz Electronics Engineers (1 FTE): J. Erö Technicians (5.8 FTE, shared with Electronics I): M. Arnold, H. Bergauer, M. Eichberger, K. Kastner, B. Neuherz, M. Padrta, Th. Schreiner Bachelor student (0.5 FTE): F. Mittermayr Diploma students (1.25 FTE): G. Kasieczka, Th. Themel, Ph. Wagner Doctoral student (1 FTE) F. Teischinger Austrian doctoral students at CERN (2 FTE): J. Hammer, Ch. Hartl Summer students (0.5 FTE): A. Khatutsky, W. Müller, M. Oschgan, V. Rainer, M. Scattolin, S. Stetina TOTAL: ~19 FTE 21 Sep. 2009 C.-E. Wulz

Mission Statement of CMS Trigger Group Select (trigger on) all collisions (every 25 ns) interesting for physics, discard the others Design, develop all hardware, firmware and associated software – Global Trigger Find and select muons Design, develop most hardware and firmware, and some associated software – Drift Tube Track Finder, Global Muon Trigger Control data taking Design, develop core hardware and firmware, and some associated software – Central Trigger Control System Set up and monitor the trigger centrally through web browser Design, develop basic software – Trigger Supervisor 21 Sep. 2009 C.-E. Wulz

Responsibility of HEPHY-Vienna Level-1 Trigger 40 MHz Pipeline, Latency< 3.2 ms HF HCAL ECAL RPC CSC DT Pattern Comparator Trigger Regional Calorimeter Trigger 4 m 4+4 m 4 m (with MIP/ISO bits) MIP+ ISO bits e, J, ET, HT, ETm, HTm Calorimeter Trigger Muon Trigger Responsibility of HEPHY-Vienna max. 100 kHz L1 Accept Decision Global Trigger Global Muon Trigger Global Calorimeter Trigger Local DT Trigger Local CSC Trigger DT Track Finder CSC Track Finder Trigger Supervisor 21 Sep. 2009 C.-E. Wulz

Present Activities CRAFT (Cosmic Run at almost 4 Tesla) ended beginning of September Global Trigger, Trigger Control System, Global Muon Trigger, Drift Tube Muon Track Finder and Trigger Supervisor have been in constant use as a service Production of additional spare electronics modules has been initiated to ensure long-term stable operations Online and offline software development Data analysis 21 Sep. 2009 C.-E. Wulz

Drift Tube Track Finder 135 electronics modules of 8 types 21 Sep. 2009 C.-E. Wulz

Trigger response function Muon efficiency to pass a DTTF transverse momentum cut of 10 GeV/c, as a function of the pT reconstructed off-line with the tracker. Measured for the first time! CRAFT 2009 DTTF trigger with segment in station 1 Any DTTF trigger 21 Sep. 2009 C.-E. Wulz

Global Trigger, Global Muon Trigger and Trigger Control System 17 electronics modules of 8 types 21 Sep. 2009 C.-E. Wulz

Global Trigger Performance in 2009 Global Trigger is indispensable for data taking and tests involving several or all CMS subsystems => close to 100 percent availability of Global Trigger is mandatory has been achieved to guarantee availability, the Global Trigger is fully duplicated by a backup system like vital systems in airplanes and space ships complete system has been available for over 2 years a number of modifications has been made upon request by CMS subdetectors for additional functionality thanks to the flexible design, it has been possible to include the additional functionality by adapting the firmware in the various electronic modules 21 Sep. 2009 C.-E. Wulz

Additional trigger paths: extra algorithms Forward and beam-related detectors: CASTOR calorimeter, Zero-degree calorimeter (ZDC), beam monitors (BPTX, BSC) CASTOR 21 Sep. 2009 C.-E. Wulz

GMT during cosmics data taking In cosmics runs, GMT provided final synchronization between individual muon systems (DT, RPC, CSC) – compensating latency differences and reacting to frequent firmware changes. RPC - DT CSC top - DT bottom CSC bottom – DT top Example before adjustment Example before adjustment DT trigger efficiency (top side) GMT data, in combination with reconstructed muon tracks, were used to calculate muon trigger efficiencies either by comparing triggers from different subdetectors (e.g. DT and RPC) or by comparing triggers at top and bottom side of the experiment Masked sector 21 Sep. 2009 C.-E. Wulz

Upgrade work and future Plans mTCA Global Trigger board Built a new optical input board for the Global Trigger (PSB board, details in report of Electronics Department) Work on upgrade projects for Super-LHC Develop new Global Trigger, possibly in mTCA technology (advantages: single type of boards, compact, fewer boards) Participate in new developments for Regional Muon Trigger mTCA Crate 21 Sep. 2009 C.-E. Wulz

Positions of Group Members TRIGGER and DATA ACQUISITION Institution Board Chair for Trigger and DAQ (Wulz, since Aug. 2009) Deputy Trigger Project Manager (Wulz, since 2007) Trigger Technical Coordinator (Mikulec, since 2008) Trigger Detector Performance Group Leader and Level-1 Trigger Offline Software Convener (Ghete, since 2009) Global Level-1 Trigger Coordinator (Jeitler, since 2008) Subeditor for Trigger Coordination (Wulz, since Nov. 2007) Member of Editorial Board for Tridas (Wulz, since 2003) CMS-WIDE Member of Advisory Board to Collaboration Board (Wulz, since 2009) Chair of Spokesperson Election Committee (Wulz, 2009) Member of Authorship Committee (Wulz, since March 2009) Member of WLCG Collaboration Board (Wulz, since 2007) 21 Sep. 2009 C.-E. Wulz

Tridas (Trigger and Data Acquisition) Project Institution Board Chairperson C.-E. Wulz Technical Coordinator Trigger: I. Mikulec DAQ: A. Racz Trigger Project Manager J. Varela Deputy: C.-E. Wulz Tridas Project Managers F. Meijers, J. Varela DAQ Project Manager F. Meijers Muons M. Dallavalle Calorimeters P. Klabbers Global M. Jeitler Detector Control System F. Glege DAQ Integration Data to surface Ch. Schwick Event Filter E. Meschi Level-1 Trigger Steering Committee J. Brooke, V. Ghete, L. Guiducci, M. Magrans de Abril, I. Mikulec, J. Varela, C.-E. Wulz 21 Sep. 2009 C.-E. Wulz

Awards I. Magrans de Abril CMS Thesis Award for best technological thesis 2008 (subject: Trigger Supervisor) C. Hartl CMS Achievement Award 2008 for critical contributions to the Global Trigger Nominations of group members for CMS Lifetime Awards, to be selected by Dec. 2009 21 Sep. 2009 C.-E. Wulz

Papers under Group Responsibility (since 2005) Refereed Journals (5) * The CMS Drift Tube Trigger Track Finder (13 group authors, 6 others) J. Erö, Ch. Deldicque, M. Galánthay, H. Bergauer, M. Jeitler, K. Kastner, B. Neuherz, I. Mikulec, M. Padrta, H. Rohringer, H. Sakulin, A. Taurok, C.-E. Wulz 2008 JINST 3 S08004 * Measurement Technology for the CMS Experiment (1 group author) C.-E. Wulz, Invited article for Special Issue on Metrological Aspects of Accelerator Technology and HEP Experiments Meas. Sci. Technol. 18 (2007) 2424-2431 * Design and Development of a Graphical Setup Software for the CMS Global Trigger (6 group authors) Ph. Glaser, T. Nöbauer, H. Bergauer, M. Padrta, A. Taurok, C.-E. Wulz IEEE Trans.Nucl.Sci. Vol 53 Nr. 3 (2006) 1282-1291 * Conceptual Design of the CMS Trigger Supervisor (2 group authors + 1 other) I. Magrans de Abril, C.-E. Wulz (Vienna), J. Varela (Lisboa, CERN) IEEE Trans.Nucl.Sci. Vol 53 Nr. 2 (2006) 474-483 * The efficiency of the CMS Level-1 Trigger for supersymmetric events (10 group authors, 2 others) L. Boldizsar, J. Erö, M. Fierro, P. Hidas, A. Jeitler, N. Neumeister, P. Porth, H. Rohringer, L. Rurua, H. Sakulin, A. Taurok, C.-E. Wulz Eur. Phys. J. C 40, s2.1-s2.13 (2005) 21 Sep. 2009 C.-E. Wulz

Papers with Group collaboration (since 2005) Refereed Journals (3) * The CMS Experiment at the CERN LHC (21 group authors, many others; editor of Trigger chapter) CMS Collaboration W. Adam et al. 2008 JINST 3 P08006 * Results of the first integration test of the CMS drift tubes muon trigger (2 group authors, 82 others) M. Aldaya et al. Ch. Deldicque, J, Erö Nucl. Instr. Meth. A579 (2007) 951-960 * The CMS High Level Trigger (14 group authors, many others) CMS Trigger and Data Acquisition Group, W. Adam, T. Bergauer, C. Deldicque, J. Erö, R. Frühwirth, M. Jeitler, K. Kastner, S. Kostner, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss, A. Taurok, G. Walzel, C.-E. Wulz Eur. Phys. J. C 46 (2006) 605-667 Approximately 20 papers about the 2008 cosmic runs are close to completion. 21 Sep. 2009 C.-E. Wulz

Conference Proceedings (since 2005) * The CMS Level-1 Trigger Emulation Software, V.M. Ghete Proc. of the Proc. of the 34th International Conference on High Energy Physics, Prague, 21 – 27 March 2009 Commissioning of the CMS Trigger, H. Rohringer, for the CMS Trigger Group Proc. of the 34th International Conference on High Energy Physics, Philadelphia, USA, 29 July - 5 Aug. 2008 CMS Commissioning, I. Mikulec Proc. of Science, SISSA, POS (2008LHC) 029 * Trigger Systems at LHC Experiments, M. Jeitler Proc. of 10th Int. Conf. on Instrumentation and Colliding Beam Physics, Novosibirsk, 28 Feb. - 5 Mar. 2008, NIM A 598 (2008) 305-311 * Status and Commissioning of the CMS Experiment at CERN, C.-E. Wulz Proc. of Europhysics Conference on High Energy Physics, Manchester, UK, 19-24 July 2007, * Enhancing the User Interface of the Level-1 Trigger of the CMS Experiment, M. Magrans de Abril, I. Magrans de Abril Proc. of Real Time Conference, Fermilab, Batavia, USA, 29 Apr. - 4 May 2007 * The level-1 global trigger for the CMS experiment, M. Jeitler et al., Proc. of the 12th Workshop on Electronics for LHC Experiments, Valencia, Spain, 23-27 Sep. 2006, JINST 2 P01006 (2007) * Kaon Physics: Present and Future, I. Mikulec Proc. of 4th International Workshop on Frontier Science, Milan, Bicocca, Italy, 12 - 17 Sep. 2005, Milan 2005, New frontiers in subnuclear physics,127-138 * The CMS Experiment at CERN, C.-E. Wulz Proc. of SPIE International Congress on Optics and Optoelectronics, 29 Aug. - 2 Sep. 2005, 5948, 594821 (2005) * Implementation and Test of the First-Level Global Muon Trigger of the CMS Experiment, H. Sakulin, A. Taurok Proc. of 11th Workshop on Electronics for LHC and Future Experiments, Heidelberg, Germany, 12-16 Sep. 2005 * The CMS Trigger Supervisor Project, I. Magrans de Arbril Proc. of IEEE Nuclear Science Symposium, Puerto Rico, USA, 24-27 Oct. 2005 (2005) 162-166 Total number of conference proceedings: 11 21 Sep. 2009 C.-E. Wulz

Invited Talks (since 2005) Total number of invited talks: 11 * Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Magrans de Abril, IEEE NPSS Real Time Conference, Beijing, 14 May 2009 * The CMS L1 Trigger Emulation Software V.M. Ghete, 17th International Conference on Computing in High Energy and Nuclear Physics, Prague, 26 March 2009 * CMS Commissioning I. Mikulec, 4th Conference on Physics at LHC, Split, Croatia, 29 Sep. - 4 Oct. 2008 * LHC und Österreichs Beteiligung am Compact Muon Solenoid C.-E. Wulz, Fachausschuss für Lehrkräfte an Höheren Schulen, ÖPG, Leoben, Austria, 5 Sep. 2008 * Trigger Systems at LHC Experiments M. Jeitler, 10th Int. Conference on Instrumentation and Colliding Beam Physics, Novosibirsk, Russia, 28 Feb. - 5 Mar. 2008 * Status and Commissioning of the CMS Experiment at CERN C.-E. Wulz, Europhysics Conference on High Energy Physics, Manchester, UK, 21 July 2007 * Overview of the CMS Experiment C.-E. Wulz, Four Seas Conference, Iasi, Romania, 30 May 2007 * The CMS Experiment at CERN C.-E. Wulz, SPIE International Congress on Optics and Optoelectronics, Warsaw, Poland, 31 Aug. 2005 * Fundamentale Fragen der Teilchenphysik C.-E. Wulz, Atominstitut der Österreichischen Universitäten, Vienna, 3 May 2005 * CP-Verletzung im Kaonsystem: experimentelle Aspekte M. Jeitler, Institut für Theoretische Kernphysik, TU Wien, 24 Oct. 2005 * Kaon Physics: Present and Future I. Mikulec, 4th International Workshop on Frontier Science, Milan, Bicocca, Italy, 12 - 17 Sep. 2005 Total number of invited talks: 11 21 Sep. 2009 C.-E. Wulz

Contributed Talks and Posters (since 2005) * Event selection by the trigger of the CMS experiment at CERN’s LHC accelerator, Ch. Hartl, Joint Annual Meeting of ÖPG, SPS, ÖGAA, Innsbruck, 3 Sep. 2009 * Control and Monitoring of the CMS Global Trigger, Ch. Hartl et al., CMS Achievement Award Ceremony, June 2009 * The Trigger Control System of the CMS Level-1 Trigger, M. Jeitler et al., 11th Pisa meeting on advanced detectors, La Biodola, Elba, 24 – 30 May 2009 * Der CMS Level-1 Trigger am LHC, F. Teischinger Fachausschuss für Kern- und Teilchenphysik, ÖPG, Aflenz, 22 Sep. 2008 * Commissioning of the CMS Trigger, H. Rohringer 34th International Conference on High Energy Physics, Philadelphia, USA, 29 July - 5 Aug. 2008 * Level-1 Global Trigger for SLHC, A. Taurok Workshop on SLHC, Paris, 11 Apr. 2008 * The Control and Hardware Monitoring System of the CMS Level-1 Trigger, I. Magrans de Abril IEEE Nuclear Science Symposium, Honolulu, USA, 31 Oct. 2007 * Die Nadel im Heuhaufen: Der Trigger des Experiments CMS am CERN-Beschleuniger, M. Jeitler Fachausschuss für Kern- und Teilchenphysik, ÖPG, Langenlois, 24 Sep. 2007 * The level-1 global trigger for the CMS experiment, M. Jeitler 12th Workshop on Electronics for LHC Experiments, Valencia, Spain, 23 Sep. 2006 * The CMS Trigger Supervisor Project, I. Magrans de Arbril IEEE Nuclear Science Symposium, Puerto Rico, USA, 24-27 Oct. 2005 * Fundamentale offene Fragen der Hochenergiephysik, C.-E. Wulz Fachausschuss Kern- und Teilchenphysik, ÖPG, Wien, 28 Sep. 2005 * Implementation and Test of the First-Level Global Muon Trigger of the CMS Experiment, H. Sakulin 11th Workshop on Electronics for LHC and Future Experiments, Heidelberg, Germany, 13 Sep. 2005 Total number of contributed talks and posters: 12 21 Sep. 2009 C.-E. Wulz

Invited Public Lectures (since 2005) * Reise zum Beginn des Universums C.-E. Wulz, Forum Time and Faith, Vienna, 15 Jan. 2009 * Elementary Particles and how we can detect them at LHC M. Jeitler, TU Forum, Vienna, 11 Nov. 2008 * Systemintegration beim CMS-Teilchendetektor T. Nöbauer Metalab, Wien, 11 Apr. 2008 * Jagd auf Higgs und Co. C.-E. Wulz German Society for Aviation and Space Flight, Immenstaad, Germany, 29 March 2007 * Von den kleinsten Teilchen bis zum Kosmos University Meets Public, VHS Meidling, Wien, 13 Dec. 2006 University Meets Public, VHS Brigittenau, Wien, 5 April 2006 University Meets Public, VHS Favoriten, Wien, 4 April 2006 * Der Pfeil der Zeit M. Jeitler University Meets Public, VHS Meidling, Wien, 4 March 2006 * Einführung in die Hochenergiephysik H. Rohringer Kitzbühel, 9 Sep. 2005 Total number of invited public lectures: 9 21 Sep. 2009 C.-E. Wulz

Summary The CMS Trigger Group has delivered crucial components for CMS, without which the experiment could not take data. These components have been in constant use and have worked well overall. We have participated in commissioning, shift work, and data analysis of the recent cosmic ray runs. New concepts and designs for triggering at Super-LHC are being developed. 21 Sep. 2009 C.-E. Wulz

BACKUP 21 Sep. 2009 C.-E. Wulz

New hardware: optical PSB the only hardware change planned for the near future concerns the connection between “Global Calorimeter Trigger” and “Global Trigger” high-speed (gigahertz) galvanic links will be replaced by more reliable optical links present design can and will still be used for LHC startup operation a new “Pipelined Synchronized Buffer” (PSB) board has been built for the Global Trigger will be equipped with “daughterboards” with optical receivers, which are built by the Imperial College (UK) group firmware currently under development first connection tests planned for end of 2009 will be used for data taking after 2009/2010 run 21 Sep. 2009 C.-E. Wulz

Additional trigger paths: extra algorithms original design of CMS level-1 trigger: inputs from muon detectors and calorimeters can be combined in logical expressions (“algorithms”) additional “technical” triggers cannot be combined but are just added into the trigger menu “OR” or can be used to veto trigger recent requests for additional “algorithms” have been accommodated up to 64 additional signals from any subdetector can be fed into the “Global Trigger Logic (GTL)” board arrive as LVDS (low-voltage differential signals) over up to 16 cables so far, requests have been accepted from beam monitors (“BPTX”, “BSC”), zero-degree calorimeter (“ZDC”) and the “CASTOR” detector firmware framework and software (menu editor) been developed allow to quickly prepare the concrete firmware for a given trigger menu 21 Sep. 2009 C.-E. Wulz

Online Software GT Trigger Monitor GUI GT Run Settings GUI (to allow trigger selection from menu for shifter) 21 Sep. 2009 C.-E. Wulz

GT Configuration Editor Configuration Editor can be used to edit configurations of all L1 subsystems 21 Sep. 2009 C.-E. Wulz