Recommendations on Parking Requirements in Transit Oriented Development (TOD) Areas Outside Tysons TRANSPORTATION ADVISORY COMMISSION July 16, 2013 This.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

1 TransAction 2040 NVTA Presentation 1 May 10, 2012.
County of Fairfax, Virginia Recommendations on Parking Requirements in Transit Oriented Development (TOD) Areas Outside Tysons To Amend Zoning Ordinance.
Presented to Transportation Advisory Commission presented by Michael Jollon, FCDOT May 4, 2010 Fairfax County TDM Proffer Study Project Update.
Tysons 1 Tysons Corner Interim Metro Parking December 20, 2011.
What’s Happening? What’s happening in Tysons? A lot!
TYSONS THE AUDACITY OF CHANGE
Small Zone Lot Parking Exemption in all Mixed Use Commercial Zone Districts.
Kirkland 2035 Plan Update Summary of EIS Alternatives Transportation Commission – September 25, 2014.
Capital Bikeshare Expansion to Montgomery County Public Meeting 11/29/11.
Twinbrook Sector Plan A New Community in the Technology Corridor
Review and Revision of Draft Round 7.0 Growth Forecasts Paul DesJardin Department of Human Services, Planning and Public Safety and Robert Griffiths Department.
Twin Cities Case Study: Northstar Corridor. ●By 2030, region expected to grow by nearly 1 million, with 91% to 95% of new growth forecast to be located.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Tom Fairchild The R&D initiative of Arlington County Commuter Services.
Comprehensive Plan for Tysons Corner 1. 2 Land Use Categories 1.Transit Station Mixed Use: the overall percentage of office uses throughout all of the.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood TODs & Complete Streets Unit 6: Station Design & Access.
Dulles Metro Extension Phase I: Tyson’s Corner Martene Bryan Luis Serna Matt Zarit.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
New Partners for Smart Growth 11th Annual Conference San Diego February 2, 2012 New Parking Standards for Affordable Housing.
SITE. Parcel will go from Medium Density Residential to medium high Density Residential Low Density Residential Medium Density Residential Office/Business.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
Presented to Planning Commission—Transportation Committee October 20, 2010 TDM Proffer Study Recommendations.
The Dulles Corridor 1. Wiehle Avenue 2 Joint development - Fairfax County and Comstock 3.5 acre Comstock parcel and 9.0 acre County parcel Mixed-use,
A New TOD Policy for Regional Transit Expansions Steve Heminger Executive Director March 11, 2005.
Transportation/Land-Use Connections Program FY 2014 Project Recommendations July 17, 2013 Sarah Crawford Department of Transportation Planning.
JUNE 27, 2013 ARB INFORMATIONAL UPDATE: ASSOCIATION OF BAY AREA GOVERNMENTS’/ METROPOLITAN TRANSPORTATION COMMISSION’S DRAFT SUSTAINABLE COMMUNITIES STRATEGY.
County of Fairfax, Virginia 11 Dulles Corridor Air Rights Study Investigation Fairfax County Board of Supervisors Transportation Committee September 17,
Transit-Oriented Development in Los Angeles County By Jennifer Tolentino Fall 2010.
Land Use and Zoning Bottineau Van White Station Area Plan Presentation to Bassett Creek Valley ROC, Bryn Mawr Neighborhood, and Harrison Neighborhood November.
County of Fairfax, Virginia Department of Transportation Urban Street Standards Progress Report Board of Supervisors Transportation Committee December.
Urban Design and Transportation Creating options and opportunities.
County of Fairfax, Virginia Fairfax County Comprehensive Transit Plan and Transit Development Plan Board Transportation Committee December 1, 2015 Randy.
Board of County Commissioners Second Public Hearing August 10, /10/
The Three Levels of Development Planning 1 Small Area Plan Zone / CDD DSP / DSUP.
County of Fairfax, Virginia Dulles Corridor Air Rights Study Investigation Fairfax County Board of Supervisors Transportation Committee December 10, 2013.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
The Regional Mobility and Accessibility Study Initial Results of CLRP/CLRP+ Analysis with Round 6.4 Growth Forecasts and Five Alternative Land Use Scenarios.
Board of Supervisors Transportation Committee June 25, 2013 (6/18 presentation draft) Proposed High Quality Transit Network Concept 1.
County of Fairfax, Virginia Policy on Level of Service in Activity Centers Board Transportation Committee December 17, 2013 Department of Transportation.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
ULI Presentation – Shifting Suburbs OLDE TOWN ARVADA TOD August 29, 2013.
Planning & Community Development Interim Development Process to Implement the General Plan Land Use Element City Council July 11, 2016.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
City of San Mateo 2016 Reach Code
planning and zoning committee presentation September 19, 2016
Finance Committee & City Council October 10, 2016
DISCUSSION OF THE FUTURE DEVELOPMENT OF THE YWCA BUILDING 78 N
Local Government Roundtable Session Arlington, Virginia
Commercial Linkage Fee Research
CFT Gateway Center ( E. Foothill Blvd
General Plan Adoption Follow-up
Harrison Community Center - October 12, 2017
Jefferson County Planning Commission Hearing April 10, 2013
Transit-Oriented Affordable Housing
DATA Annual Transportation roundtable June 17, 2015
National CAPITOL REGION STATE OF THE COMMUTE
Transportation Management Plan Modernization Project
Transportation Forum for Northern Virginia’s Elected Leaders April 23, 2018 Presented by: Monica Backmon, Executive Director.
Please fill out the index card and we will answer questions at the end!
Next Steps for Urban Street Standards
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
Hotel Conversions Background
Zoning Code Amendment - Emergency Shelters, Limited
Kincora Village Center
Rural Transit Stop Design Guidelines Prof Omer maaitah
EASTERN placer COUNTY NEXUS-BASED AFFORDABLE/Workforce HOUSING FEE
Presentation transcript:

Recommendations on Parking Requirements in Transit Oriented Development (TOD) Areas Outside Tysons TRANSPORTATION ADVISORY COMMISSION July 16, 2013 This presentation is about staff’s recommendations for parking requirements in TOD locations outside Tysons. After this presentation, Eileen McLane will talk about the process in this case to amend the zoning ordinance. 1

County of Fairfax, Virginia Background Recommendations on parking requirements are limited to Metrorail station areas in Fairfax County located outside Tysons Preliminary recommendations presented to BOS Transportation Committee in Nov. 2010 Concerns expressed by BOS members Applicability of parking maximums in non-Tysons TOD areas Low parking minimums in non-Tysons TOD areas Recommendations are applicable to the area within ½ mile from the Metrorail stations. Orange line: West Falls Church, Dunn Loring-Merrifield, Vienna/Fairfax-GMU; Blue line: Franconia-Springfield; Yellow line: Huntington; Silver line: Wiehle-Reston East, Reston Town Center, Herndon, Innovation Center. (5 existing and 4 with the Silver Line) We made preliminary recommendations about 18 months ago. The BOS members at that particular committee meeting expressed concerns. 2

Activities Since October 2010 County of Fairfax, Virginia Activities Since October 2010 Our Transportation Demand Management (TDM) and Parking study was completed which provided more information More information obtained on parking requirements at neighboring jurisdictions Parking requirements were revised based in new information, including the removal of parking maximums Since the previous meeting we benefited from additional information from a TDM and Parking study. We also obtained information from Montgomery County, Alexandria, Prince Georges County and Arlington. We were aggressive with our initial recommendations with parking maximums as we have in Tysons that was adopted by the BOS in June 2010 and low minimums. The approach at the time was to use limited but still workable parking as a way to increase transit use. Taking the BOS member comments into consideration we revised our previous recommendations by removing parking maximums and increasing some of the minimum parking rates recommended. 3

Items Considered in Making Parking Recommendations County of Fairfax, Virginia Items Considered in Making Parking Recommendations Survey of office parking lots in Fairfax County Employee survey to determine vehicle trips generated, commuting preferences TDM programs’ ability to reduce single occupant vehicle (SOV) trips Analysis of similar jurisdictions’ parking requirements Alexandria Montgomery County After first bullet, skip to next slide. TDM Programs can reduce peak hour trips in high to moderate transit areas by an additional 10-20% without paid parking and 15-30% with paid parking Montgomery County planning to reduce minimums even further because of success with phase 1 reduction 4

(As a percentage of garage capacity) County of Fairfax, Virginia Observations of Maximum Parking Occupancy (At parking garages in Fairfax County) Area Parking Provided (Spaces per 1,000 sq. ft. of office space) Parking Space Used (As a percentage of garage capacity) Reston 3.20 53% Merrifield 3.56 38% Herndon A 3.73 54% Herndon B 3.74 40% Fair Oaks 3.93 58% Tysons 3.97 41% We obtained data on the use of a number of existing parking garages in Fairfax County. The second column indicates at what parking rate parking was provided at a particular location. The last column provides information on how much parking is used. This illustrates that there is generally an oversupply of parking in office locations in the county. The reduction of the requirements will therefore lead to savings in resources – even more so at Metrorail station areas. 5 5

County of Fairfax, Virginia Assumptions Used TOD areas outside Tysons are unlikely to have the same amount of mixed use development and bus transit service as Tysons As the distance from Metrorail stations increase, the percentage of trips made by transit decreases For office development, parking can be reduced based on a reduction in vehicle trips due to transit, walking, and bicycle trips, as well as TDM Skip to two slides forward when at last bullet. 6 6

Assumptions Used (continued) County of Fairfax, Virginia Assumptions Used (continued) For residential development, the desire to have access to a car means there is not a direct correlation between required parking spaces and vehicle trip reduction Compare with peer jurisdictions For retail development, the function of the retail establishment matters For hotels, transit and mixed use development will have a lesser impact on vehicle trips For residential development, standards practices that work is the best source. 7 7

Calculation for Office Parking: Example County of Fairfax, Virginia Calculation for Office Parking: Example Assumptions: Office building within a ¼ mile of a Metrorail station Workers per 1,000 square feet = 3.5 (based on 4 workers per 1,000 square feet which is reduced by an absentee rate of 12.5%) Average vehicle occupancy = 1.1 persons Increase in parking spaces for visitors: 7% Allowance for inefficiency in finding all open spaces: 5% inefficiency Maximum reduction in vehicle use for office locations less than ¼ mile from station: 45% Result: Parking requirement = 1.96 spaces per 1,000 sq. ft., so use 2.0 spaces 8 8

County of Fairfax, Virginia Recommended Vehicle Trip Reduction Goals for TOD Areas (Metrorail) Outside Tysons Development TOD Locations Non-TOD Locations (More than 1/2 Mile from Metrorail Station) 0 to 1/4 Mile from Metrorail Station 1/4 to 1/2 Mile from Metrorail Station Office Baseline* 30% 25% 20% TDM Goal** 45% - 35% 40% - 30% 35% - 25% Residential Baseline 15%-10% 25% - 15% *Baseline refers to the inherent reduction from ITE trip rates observed in Fairfax County without any formal TDM program elements in place. These reductions include the following: vehicle trip reduction due to transit use, peak hour spreading and existing TDM activities (prior to a formal TDM program) **Use of the higher end of the reduction range should be considered especially for developments in areas of high existing or planned urban accessibility, located close to and with easy and convenient pedestrian access to transit stations (<1/4 mile for rail, <1/8 mile for bus service), and in a walkable, mixed-use environment. Mixed-use development supports higher levels of vehicle trip reduction due to internal trip capture and as well as to walk and bicycle trips within the development or to adjacent developments. A project with TDM that is part of a larger mixed-use development may, therefore, support greater vehicle trip reductions than a smaller, single-use, stand-alone project that implements the same site-level TDM measures. Divided into two groups – residential and lodging. The parking rates for these are provided by unit. For hotel it is per room. Commercial is parking spaces per 1,000 sq. ft. The second column provides the current parking recommendations – minimums. Please note that the 1.6 parking spaces for multifamily housing. It is the same required rate no matter how large the apartment is. The next two columns are the Tysons recommendations approved by the BOS in June 2010. These contain maximums. The green columns are the recommendations. We wanted to make sure if a developer implements the minimum rate, that it will still be an acceptable parking situation. The second last column applies to developments that are within ½ mile from the station. The last column represents an optional further 10% reduction in parking if a development is within ¼ mile of a rail station. There are no parking maximums recommended. Prof. Donald Shoup, considered an expert in parking has the view that a developer will park at a level that is most cost-effective for a particular development. For residential, we could not use the increase in transit use as a direct factor to reduce parking since the occupants often still want to have a vehicle available even though they might not use it that much. We therefore found that current practice for locations similar to our Metro stations is the best source. We looked at our peer jurisdictions (Montgomery county, Alexandria in particular). Particularly Montgomery county since they indicated to us that they are from experience, happy with their recommendations in terms of providing adequate parking and might reduce their requirements somewhat in future. The hotel is at our existing requirement with a 7% reduction if within a ¼ mile of station. (employees, some particularly from airport). Office is based on TDM goals with allowances for absentees, visitors and inefficiencies in finding the very last parking spaces in a parking garage. The recommendations are very close to Montgomery county and Alexandria. For other commercial we already have a reduction of 20% in our ordinance for retail parking in TOD areas and this was applied to our existing rates. Footnote: For some specific uses listed the first 5,000 feet was assumed to be neighborhood serving retail and no parking needs to be provided. These uses can also be served by on-street parking. All other commercial, other than office, the required spaces will be based on a 20% reduction in parking specified in the zoning ordinance. 9

Recommended TOD Area Parking Minimums County of Fairfax, Virginia Recommended TOD Area Parking Minimums Divided into two groups – residential and lodging. The parking rates for these are provided by unit. For hotel it is per room. Commercial is parking spaces per 1,000 sq. ft. The second column provides the current parking recommendations – minimums. Please note that the 1.6 parking spaces for multifamily housing. It is the same required rate no matter how large the apartment is. The next two columns are the Tysons recommendations approved by the BOS in June 2010. These contain maximums. The green columns are the recommendations. We wanted to make sure if a developer implements the minimum rate, that it will still be an acceptable parking situation. The second last column applies to developments that are within ½ mile from the station. The last column represents an optional further 10% reduction in parking if a development is within ¼ mile of a rail station. There are no parking maximums recommended. Prof. Donald Shoup, considered an expert in parking has the view that a developer will park at a level that is most cost-effective for a particular development. For residential, we could not use the increase in transit use as a direct factor to reduce parking since the occupants often still want to have a vehicle available even though they might not use it that much. We therefore found that current practice for locations similar to our Metro stations is the best source. We looked at our peer jurisdictions (Montgomery county, Alexandria in particular). Particularly Montgomery county since they indicated to us that they are from experience, happy with their recommendations in terms of providing adequate parking and might reduce their requirements somewhat in future. The hotel is at our existing requirement with a 7% reduction if within a ¼ mile of station. (employees, some particularly from airport). Office is based on TDM goals with allowances for absentees, visitors and inefficiencies in finding the very last parking spaces in a parking garage. The recommendations are very close to Montgomery county and Alexandria. For other commercial we already have a reduction of 20% in our ordinance for retail parking in TOD areas and this was applied to our existing rates. Footnote: For some specific uses listed the first 5,000 feet was assumed to be neighborhood serving retail and no parking needs to be provided. These uses can also be served by on-street parking. All other commercial, other than office, the required spaces will be based on a 20% reduction in parking specified in the zoning ordinance. 10

Amendment to Zoning Ordinance County of Fairfax, Virginia Next Step Amendment to Zoning Ordinance Questions? Eileen McLane will now provide information about the process for a change to the zoning ordinance. 11