XFEL Cryo Operation DESY Betriebsseminar Grömitz

Slides:



Advertisements
Similar presentations
Matthias Clausen DESY, Hamburg, Germany Cryogenic Controls for the European XFEL.
Advertisements

Full cryogenic operation of AMTF – the first year
Current status Arkadiy Klebaner November 21, 2012
V. Ayvazyan, M. Clausen, B. Petersen, S. Putselyk, T. Schnautz DESY – Maschine-Kryogenik-Supraleitung Notkestrasse 85, Hamburg RF heat load compensation.
H. Herzog, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN LARGE SCALE CRYOGENIC.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
CEC/ICMC 2015, Tucson Anatoly Zhirnov, DESY presented by Anatoly Zhirnov, DESY, MKS With a huge appreciation to colleagues from INP-PAS (Poland), WUT (Poland),
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
Cryogenic refrigeration for the XFEL facility. Current status of the commissioning. Wilhelm Hanspeter Grenoble, June 4th, 2015.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
1 st stage Possible extension XFEL Cryo System Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13)
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
LCLS-II Cryoplant Overview
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Jonathan Creel Electrical / Cryogenics Engineer Cryogenics.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
LCLS-II Technical Requirements
Strategy and Status of Reference Cavities for European XFEL
Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016
First operation of the XFEL linac with the 2K cryogenic system
Serial testing of XFEL cryomodules: results of the cryogenic heat load measurements  T Böckmann1, Y Bozhko1, W Gay2, P Halczynski2, B Petersen1, S Putselyk3,
2K Cold Box FDR Introduction
Process Simulation for the LCLS-II Cryogenic Systems
FRIB Cryogenic Support
IT-4189 Supply and installation of a cryogenic distribution system
Power Couplers, HOM Couplers and Tuners for the XFEL
WP-X XFEL Project Progress Report (2016-3)
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
E-XFEL Status and First Beam Results
Cryoplant Installation Scope
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
ICEC/IMC 2016 Sergiy Putselyk DESY MKS
SPS cryogenic proximity equipment and SM18 validation
WP-X XFEL Project Progress Report (2014-3)
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Racks Coordination 09 September 2011 E. Negodin
09 Juni 2015 L1 Inbetriebnahme Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide.
High speed LWL connections for WP02
for X-ray Optics and Beam Transport
Accelerator Module Test Facility
Commissioning and First Cooldown of XFEL Linac
BriXS – MariX WG 8,9 LASA December 13, 2017.
WP Coordinaten XFEL RF Operation
WP02 PRR: Master Oscillator and RF Reference Distribution
Cryoplant Operation for FLASH and XFEL
Markus Hüning 3rd XFEL Collaboration Meeting
Yuhui Li How to edit the title slide
presented by Elmar Vogel
Mathew C. Wright January 26, 2009
EU-XFEL summary of performance degradation
ILC Experimental Hall Cryogenics An Overview
Cryogenic System Commissioning Summary Report
Operator Training Requirements
SNS Cryoplant Commissioning Past Experiences
CryoPlant Commissioning
Cryomodule Performance in FLASH and XFEL
TTC Meeting, July , Saclay, France.
ESR2 Process Cycle Design
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
ESR2 Process Cycle Design
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

XFEL Cryo Operation DESY Betriebsseminar Grömitz 25.03.2015 Tobias Schnautz-MKS1-, Kolja Stapf-MKS1-, Matthias Clausen-MKS2- Bernd Petersen-MKS- laufende Inbetriebnahme durch LINDEKRYOTECHNIK How to edit the title slide Upper area: Title of your talk, max. 2 rows of the defined size (55 pt) Lower area (subtitle): Conference/meeting/workshop, location, date, your name and affiliation, max. 4 rows of the defined size (32 pt) Change the partner logos or add others in the last row.

Outline XFEL Refrigerator – general requirements Re-use of HERA refrigerators Sequence of installation and commissioning Some technical details – background of CCs Preliminary results of comissioning Installation & commissioning schedule RF load/ electrical heater compensation Some remarks Summary Before you start editing the slides of your talk change to the Master Slide view: Menu button “View” > Slide Master: Edit the following items: 1. On the Title slide (second master slide) a) Click to add title of your talk b) Click to add subtitle (conference, location, name of the speaker, date) 2. On the Slide Master (first master slide) a) The 1st row in the violet header: Delete the existent text and write the title of your talk into this text field b) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area. Close Master View

Requirements on XFEL Refrigerating Plant Decision to use HERA Refrigerating Plant for XFEL Requirements on XFEL refrigerating plant (17.5 GeV) 100 cryomodules, 10 Hz, Qo=10**10, 23.6 MV/m 1 injector, 3.9 GHz + 1.3 GHz cryomodule 2K: 1869 W 5/8K: 3593 W 40/80K: 23923 W Operation: 24 h/d, 7 d/week Run periods of 2-3 years without scheduled break Refrigerator availability > 99%

Requirements on XFEL Refrigerating Plant Decision to use HERA Refrigerating Plant for XFEL Industrial Study Linde Kryotechnik and its Results: Study was conducted 2006 Based on TDR XFEL refrigerator requirements Subject: re-use of HERA refrigerator for XFEL Process investigation including CC operation (cold compressors)

Requirements on XFEL Refrigerating Plant Decision to use HERA Refrigerating Plant for XFEL Industrial Study Linde Kryotechnik and its Results: 2 HERA refrigerators (subplants) + 2K system (cold compressors) could be modified to XFEL-refrigerator Advantages: Only ½ of investment costs compared to new refrigerator (fixed price for 2006) No extra civil engineering effort Utilities exist Disadvantages: Lower efficiency compared to new plant Re-use of worn equipment Parallel operation of 2 cold boxes challenging (symmetrical operation) Use of existing HERA helium refrigerator = cheapest solution (decreasing investment costs for the XFEL refrigerator about factor 2) reason to realize this solution 5

HERA Refrigerating Plant -> XFEL Refrigerating Plant SC Colbox 42 Purifier SC Colbox 41 Purifier SC Colbox 43 Purifier Distribution Box FLASH, CMTB, MTH, AMTF,… HERA South HERA North

HERA Refrigerating Plant -> XFEL Refrigerating Plant Commissioning of XFEL Refrigerating Plant SC Colbox 41 Purifier SC Colbox 43 Purifier Commissioning of both XFEL subplants Started August 2013 Overhauling

HERA Refrigerating Plant -> XFEL Refrigerating Plant Commissioning of XFEL Refrigerating Plant SC Colbox 41 Purifier SC Colbox 43 Purifier Distribution Box DB54 Commissioning of both XFEL subplants together with DB54 was continued until November 2013

HERA Refrigerating Plant -> XFEL Refrigerating Plant SC Colbox 41 Purifier SC Colbox 43 Purifier XRTL Distribution Box DB54 Cold Compressors CB44 Distribution Box XLVB

HERA Refrigerating Plant -> XFEL Refrigerating Plant (Building 54) Cryo Plant SC Colbox 41 Purifier SC Colbox 43 Purifier XRTL Distribution Box DB54 Shaft Cold Compressors CB44 Distribution Box XLVB Distribution Box XLVB

HERA Refrigerating Plant -> XFEL Refrigerating Plant Commissioning of XFEL Refrigerating Plant (Building 54) Cryo Plant SC Colbox 41 Purifier SC Colbox 43 Purifier XRTL Distribution Box DB54 Shaft Cold Compressors CB44 Distribution Box XLVB Distribution Box XLVB Commissioning of Cold Compressor Box (CB44) Problem: Transferline XRTL was delayed (~1 year) Cold compressor box CB44 couldn‘t be commissioned ‚in time‘ Time loss is not acceptable CB44 was temporarily installed in building 54 with ‚commissioning transferline CXRTL‘ February – September 2014 (30 weeks !)

HERA Refrigerating Plant -> XFEL Refrigerating Plant Commissioning of XFEL Refrigerating Plant (Building 54) Cryo Plant SC Colbox 41 Purifier SC Colbox 43 Purifier XRTL Distribution Box DB54 Shaft CXRTL Cold Compressors CB44 Distribution Box XLVB Distribution Box XLVB Pre-commissioning of XFEL refrigerator with CB44 in building 54 Until September 2014 Partial compensation of delayed XRTL

HERA Refrigerating Plant -> XFEL Refrigerating Plant Commissioning of XFEL Refrigerating Plant (Building 54) Cryo Plant SC Colbox 41 Purifier SC Colbox 43 Purifier XRTL Distribution Box DB54 Shaft CXRTL Cold Compressors CB44 Distribution Box XLVB Distribution Box XLVB December 2014 Transport of CB44 from building 54 to final location of installation in XSE Time can be used for further tests (symmetrical operation of both subplants)

Transport of CB44 to XSE

HERA Refrigerating Plant -> XFEL Refrigerating Plant Commissioning of XFEL Refrigerating Plant (Building 54) Cryo Plant SC Colbox 41 Purifier SC Colbox 43 Purifier XRTL Distribution Box DB54 Shaft Cold Compressors CB44 Distribution Box XLVB Distribution Box XLVB October 2014 – March 2015 Installation of transferline XRTL March - May 2015 Final commissioning of XFEL refrigerator with CB44 in XSE

Installation of XRTL Transferline completed In cold operation since week 12

Overview of XFEL Cryogenic Equipment Warm He-Pumps AMTF (Building 54) Cryo Plant SC Colbox 41 Purifier SC Colbox 43 Purifier XRTL Distribution Box DB54 Shaft Cold Compressors CB44 Distribution Box XLVB Distribution Box XLVB Distribution Box XLVB XLVB installation in XSE started week12 2015 Injector Linac

19.March 2015 – XLVB in XSE

Overview of XFEL Cryogenic Equipment AMTF (Building 54) Cryo Plant Warm He-Pumps SC Colbox 41 Purifier SC Colbox 43 Purifier XRTL Distribution Box DB54 Shaft Cold Compressors CB44 Distribution Box XLVB Distribution Box XLVB Distribution Box XLVB Injector FB Distribution Box XIVB CM FC EC 3,9 GHz Linac FB First cool-down of injector June 2015 CM FC EC 3,9 GHz

Cryogenic injector equipment installed Some remaining work for injector components will be completed in April

Overview of XFEL Cryogenic Equipment AMTF (Building 54) Cryo Plant Warm He-Pumps SC Colbox 41 Purifier SC Colbox 43 Purifier XRTL Distribution Box DB54 Shaft Cold Compressors CB44 Distribution Box XLVB Distribution Box XLVB Distribution Box XLVB Linac Injector XLTL1 XLTL3 XLTL2 CMS FC EC SCB Main Linac FB Distribution Box XIVB CM FC EC 3,9 GHz FB – June 2016 June 2016 start of linac cryo operation CM FC EC 3,9 GHz

Installation of cryogenic equipment (shaft) Sequence (shaft) Transferline to XFEL refrig. plant XRTL Cold Compressor Box CB44 Transferline to linac XLTL1 (vertical) Distribution Box XLVB Transferline to linac XLTL1 (horizontal)

Modification of the Coldboxes The effect from 4.5K to 2K Re-arrangement of turbine strings LN2 heat exchanger removed 50% of piping modified To be modified To be removed No changes

Modifications of the refrigerator Coldboxes The effect from 4 Modifications of the refrigerator Coldboxes The effect from 4.5K to 2K… Modifications 50% of all piping were modified LN2 precooling heatexchanger was removed Turbines were re-arranged and equipped with optimised flow parts At least some items remained Platefin heatexchangers 80K and 20K Adsorber Cryogenic valves (shaft, stem and some plugs) 17 years of operational experience  atuomated procedures migrated into plc

Overhaul of the Compressor System Facts & figures Main Objective To ensure «a sufficient helium-supply of the XFEL-linac for at least 15 years of continuous operation» [from T. Schnautz, B. Petersen «Specification of the XFEL-Refrigerator»] Some numbers about overhauling: Adsobent replacement at 4 dryers Revision of 9 screw compressor blocks Calibration of 178 safety valves New sealings at 1292 manual valves Painting of all equipment overhauled Pressure & leak test

New Components: 2K Cold Compressors (1) Some facts about cold compressors Small dynamic range Sensitive towards massflow-, pressure-, temperature changes Each system is unique (Re-)start of cold compressors is time intensive DESY has no operational experience with cold compressors

Cold Compressors (2) Cold Compressor Bypass Operation Cold Compressor Box CB44 4 cold compressors, total compression ratio = 45.8 Full flow re-cooling bypass Startup & pumpdown independent from «experiment side» Operational robustness due to high internal turndown ratio 2K Return x % CC kept in operating map (100-x) % x % 2K Return

Screen Shot from CSS Applications SDS (Synoptic Display Studio)

Screen Shot from CSS Applications SDS Correlation Plot

XFEL Refrigerator Capacity Spec Parallel Operation of 2 Cold Boxes to achieve specified design capacities Hope: operation of only one cold box for XFEL linac supply DESY specification for XFEL refrigerating plant LINDE ‚TS‘ prognosis: ( for one coldbox): 2K: 2010 W 5K: 3030 W 40K: 20175 W Design Spec: 2K: 1896 W 5K: 3593 W 40K: 23923 W Start-up: 17.5 GeV version Operating 17.5 GeV Linac with one refrigerator (subplant) would save > 500.000 EUR primary energy costs

Commissioning of XFEL Refrigerating Plant Comissioning of screw compressors, sub-systems, cold-boxes an DB54 until November 2013 (NO demonstration of CB capacities !) Comissioning of CB44 (CCs) and capacity measurements February- September 2014 - start of CCs operation fast, smoothly & promising, bypass works ! - demonstration of capacities failed, low performance of CBs ‚Root-Cause-Analysis‘ to fix low performance of CBs December 2014 – January 2015 repeated capacity tests of CBs (CB44 separated, modified ‚test-caps‘) Since March 2015 – complete comissioning including XRTL and CB44 in final position Distribution Box XLVB Distribution Box XLVB

LINDEKRYOTECHNIK Root Cause Analysis

Modified Testprocedures for Commissioning

Capacities of Cold-Boxes (preliminary) CB41 CB43 (2) Comment: 2K capacity of 13 KW ist the heater equivalent of 100 g/s in TS-diagram

Final Comissioning – CB44 in XSE Verification of cooling capacities including CCs operation (for single cold box operation) Demonstration of parallel cold box operation (verification of specified design capacities) Demonstration of part load operation of CCs (JT screw compressor in sub-atmospheric operation)

Final Comissioning & Installation Schedule XFEL refigerator comissioning until mid May Until mid May: installation of XLVB (BINP) Until mid May: complete injector installation (BINP) May-June installation of final transfer CB44-XLVB Until mid may: complete warm gas tubing July: start of injector cryo operation XLVB not yet connected to linac ! Endcap at XLVB 4 weeks break of injector operation for final connection to XFEL linac in 2016 XFEL helium purifier ordered

RF load / electrical heater load compensation 37 Experiments are going on in FLASH, CMTB, AMTF J.Branlard –MSK-,S.Putselyk –MKS1-, M.Clausen –MKS2- MKS Internal Presentation Dr. S. Putselyk, DESY

Some Remarks Repair / replacement of cooling water supply required -MKK- (old HERA cooling towers leaky) Energy recovering system will be added to HD screws –D5,MKK

Summary Installation of XFEL refrigerator completed First operation of cold compressors demonstrated Cooling capacity of single cold boxes verified Single cold box operation for XFEL linac supply seems to be possible To be demonstrated: final capacities incl. CCs operation To be demonstrated: part load operation of CCs To be demonstrated: parallel cold box operation On schedule for supply of injector and linac

Vielen Dank fürs Zuhören !