Cryostat design Mechanical design: Thermal screens: Specifications:

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Mucool cryo-design Christine Darve Fermilab/Beams Division/ Cryogenic Department 8/12/02.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
2 Technical seminar - 5 th June 2014 Vincent Roger - TE-MSC-TF.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
Preliminary Design for the Coupling Coil Cryostat in MICE
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Agenda – Basics of cavity integration into CAST Introduction (M Davenport) Information exchange 2016 – Vacuum in cold bore – 2 cavities Cooling RF Cavities.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
The integration of 420 m detectors into the LHC
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
RESEARCH AND DEVELOPMENT FOR FUTURE LHC SUPERCONDUCTING MAGNETS POINT SUR LA STATION D’ESSAIS préparé par Jean-Marc Gheller Steering committee –September.
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
S A Griffiths CM42 June 2015 Electrical & Control.
Hongyu Bai LCLS-II 2 K Cold Box PDR September 27, 2016
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
Crab Cavity Technical Coordination meeting:
Final Design Cryogenic and mechanical configurations
Teleconf ACS – FREIA 28th March 2017
Teleconference ACS – FREIA 31th May 2017
Teleconf ACS – FREIA 13th March 2017
Mechanical and cryogenic configurations
Installation of the T600 at Fermilab
Control System and Automatic Sequences
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Cryogenic behavior of the cryogenic system
HFM Test Station Main Cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200
Teleconference ACS – FREIA 18th April 2017
Teleconference ACS – FREIA 10th May 2017
Cryostat design Mechanical design: Thermal screens: Specifications:
Teleconference ACS – FREIA 17th October 2017
LARP Vertical Test Facility
Teleconference ACS – FREIA 31st October 2017
(vertical cryostat, Gersemi)
CERN Cryomodule Requirements for Crab Cavities
Block 4 and Cluster D - Safety
MICE Coupling Coil Update
FRESCA Cryostats Outer cryostat during pressure test at the manufacturer Top plate and lambda plate for the outer cryostat Inner cryostat during reception.
Teleconference ACS – FREIA 20th February 2018
Cryomodule Assembly Plan
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
SNS PPU Cryomodule Instrumentation
Burst Disc Experiences at CEA Test Stand
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

Cryostat design Mechanical design: Thermal screens: Specifications: The design of stiffeners are modified to simplify the manufacturing, Two safety valves (1”, 3.9 barg) are added to protect the pressure vessel, The flatness of the Lambda seat must be better than 0.1mm, The final mechanical design is validated by numerical calculations. Thermal screens: An aluminum design defined, The cylindrical upper part will be manufacturing in copper. Specifications: Maximum allowable operating pressure:  3.9 barg, Hydraulic test pressure: 7.15 bara, The manufacturing norms is defined : EN13458

Valve Box Mechanical design: Heat Exchangers: The 3D piping design is done, The thermal shield is copper designed. Heat Exchangers: 2 different exchangers (DATE) welded together.

Liquid Insert Mechanical design: The level probe (3.2m) is composed of two probes of 1.6 m. Two pumping lines (DN63 and DN100) for the cavity vacuum will be installed, An ACS low pressure safety valve has been defined to operate at 0.7 barg, this safety valve could be connected to the recovery helium system. CD has improved the initial design of the low pressure safety valve. CD drawings to be checked.

Lambda Insert : several modifications Mechanical design: Several modifications must be made to install the magnetic measurement system. (Ø and axis distance in magnet design?) Current leads requirements to define final ports design. Access holes to design on the thermal shields, - The low pressure safety valve operates at 2.5 barg, HX681 design to be discussed (full copper, excepted the flanges, silver brazing and TIG welding).

Specifications and equipments The specifications of main equipments are defined excepted the instrumentation of the four current leads, The electrical heaters of Minco will be replaced by the Winkler heaters, The Minco Pt100 thin films are used to measure the temperature of the electrical heaters, ACS will test the Winkler heaters in vacuum and cryogenic conditions, A VAT control valve has been tested by ISII-Tech, this kind of butterfly valve could be used to replace the MKS valves, The Brooks pressure sensors will replace the MKS sensors used to regulate the pressure of helium bath, Two kinds of Brooks pressure sensors will be used : - the capacitance manometers in the range from 0 to 100 Torr and 0-1000 Torr : CMX45, - the pressure sensors in the range from 0 to 2 bars and 0-7 bars : Solidsense II, The mass flowmeters will replace the gas counters but the range of measurement will be reduced (1/50 instead of 1/500).

Cryogenic schemes - The new cryogenic scheme and the nomenclature included the equipment modifications are available. The modifications concerned : The cryogenic superfluid line used for the vacuum insert (no bayonet) : L015, The new safety valves of the cryostat cold vessel : SV642, SV643, The level probe of liquid insert composed of two probes : LT660, LT661, The level probe of vacuum insert composed of two probes : LT670, LT671, Magnet insert, the level probe of pressurized 2 K bath composed of two probes: LT680, LT681, Magnet insert, the level probe of heat exchanger HX681 : LT683 instead of LT681.