Longitudinal Diagnostics for start-up

Slides:



Advertisements
Similar presentations
BC System – Review Options ● BC2 working point (energy-charge-compr.) ● 2BC (rf-rf-bc-rf-bc-rf) ● table: 2BC (rf-rf-bc-rf-bc-rf) dogleg + 2BC (rf-dog-rf-rf-bc-rf-bc-rf)
Advertisements

Beam Dynamics in MeRHIC Yue Hao On behalf of MeRHIC/eRHIC working group.
A Capture Section Design for the CLIC Positron Source A. VIVOLI* Thanks to: L. RINOLFI (CERN) R. CHEHAB (IPNL & LAL / IN2P3-CNRS) O. DADOUN, P. LEPERCQ,
12/28-29/2004ILC Workshop/ PAL General Idea on ILC Beam Diagnostics Jung Yun Huang Heung-Sik Kang PALPOSTECH.
Christopher Gerth, Michael Röhrs, Holger Schlarb DESY Hamburg Optics for Diagnostic Section BC1 in the European XFEL.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
ALICE : Superconductive Energy Recovery Linac (ERL) “Quick course” for new machine operators Part 3: Experimental and Operational Procedures Y. Saveliev.
Beam Dynamic Shifts 2011 C. Behrens, W. Decking, M. Dohlus, H. & D. Edwards, C. Gerth, T. Hellert, T. Limberg, P. Piot, E. Schneidmiller, M. Scholz, M.
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg FEL driver linac operation with very short electron bunches.
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
Influence of the Third Harmonic Module on the Beam Size Maria Kuhn University of Hamburg Bachelor Thesis Presentation.
~ gun3.9 GHz cavity Bunch compressor 3 ILC cryomodules 45 deg. spectro injector main linac user area disp. area transport line Overview of.
W. Decking, M. Dohlus, C. Gerth, A. Krasnov, S. Lederer, T. Limberg, N. Mildner, D. Noelle FEL Beam Dynamics Meeting, XFEL Bunch Compressor.
TTF2 Start-to-End Simulations Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Zeuthen, 22 Jan 2004.
05/05/2004Cyrille Thomas DIAMOND Storage Ring Optical and X-ray Diagnostics.
Overview of ERL MEIC Cooler Design Studies S.V. Benson, Y. Derbenev, D.R. Douglas, F. Hannon, F. Marhauser, R. A Rimmer, C.D. Tennant, H. Zhang, H. Wang,
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
1 Plan and Opportunities for Migration and Integration of the Photoinjector into New Muon Lab Mike Church AAC Review - 12/5/06.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
Beam Dynamics and FEL Simulations for FLASH Igor Zagorodnov and Martin Dohlus Beam Dynamics Meeting, DESY.
Optics considerations for ERL test facilities Bruno Muratori ASTeC Daresbury Laboratory (M. Bowler, C. Gerth, F. Hannon, H. Owen, B. Shepherd, S. Smith,
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
XFEL Beam Dynamics Meeting Bolko Beutner, DESY Velocity Bunching Studies at FLASH Bolko Beutner, DESY XFEL Beam Dynamics Meeting
T. Limberg Position of the 3rd Harmonic System. Injector (with first Bunch Compression Stage) 2 European XFEL MAC May 2010 T. Limberg.
LUCX FACILITY INTRODUCTION : PRESENT STATUS AND FUTURE PLANS A. Aryshev On behalf of QB group and THz collaboration Mini-workshop for advanced THz and.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
Capture and Transport Simulations of Positrons in a Compton Scheme Positron Source A. VIVOLI*, A. VARIOLA (LAL / IN2P3-CNRS), R. CHEHAB (IPNL & LAL / IN2P3-CNRS)
S2E (start-to-end) Simulations at DESY T. Limberg TESLA Collaboration Meeting in Frascati, May 2003.
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
What did we learn from TTF1 FEL? P. Castro (DESY).
XFEL Beam Dynamics Meeting Bolko Beutner, DESY First results of micro-bunching and COTR experiments at FLASH Bolko Beutner, Winfried Decking,
Wir schaffen Wissen – heute für morgen PSI, March 2013 Paul Scherrer Institut PSI / DESY / KIT Mini-Workshop on Longitudinal Diagnostics for FELs.
Beam dynamics and linac optics studies for medical proton accelerators
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Minjie Yan Ch. Gerth, E. Hass Deutsches Elektronen-Synchrotron (DESY)
LLRF'15 Workshop, Shanghai, Nov. 4, 2015
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Controls CBETA controls will extend existing EPICS control system
Thermal emittance measurement Gun Spectrometer
WG2 Summary: Diagnostics, measurements, and commissioning
Revised Commissioning Strategy
UCLA/ATF chicane compression experiments
F. Villa Laboratori Nazionali di Frascati - LNF On behalf of Sparc_lab
Capture and Transmission of polarized positrons from a Compton Scheme
Electron Source Configuration
Diagnostics overview and FB for the XFEL bunch compressors
LCLS Longitudinal Feedback and Stability Requirements
Injector: What is needed to improve the beam quality?
Simulation Calculations
UCLA/ATF chicane compression experiments
OCELOT orbit correction and optimizer
Linac/BC1 Commissioning P
VELA – CLARA AP (Draft) Goals Software Goals
Modified Beam Parameter Range
Laser Heater Integration into XFEL. Update.
Breakout Sessions SC1/SC2 – Accelerator Physics
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
First results of micro-bunching and COTR experiments at FLASH
Diagnostics RF and Feedback
Linac Diagnostics Commissioning Experience
Operational Experience with LCLS RF systems
LCLS Injector Commissioning P
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Review of the European XFEL Bunch Compression System: Introduction and Concept Torsten Limberg.
Bunch Compression Experiment in VUV-FEL BC3
Slice emittance measurement at TTF
Bunch Compressor Beam Line Optics
Presentation transcript:

Longitudinal Diagnostics for start-up Christopher Gerth (DESY) On behalf of XFEL WP18 and many others … Workshop on Linac Operation with Long Bunch Trains 23 February 2010 8

Introduction Set-up of the machine = find operating points a) old settings: save&restore b) predicted operating points from simulations Diagnostics: magnets => orbit,matching => transverse diagnostics (BPM, OTR, BLM, …) modules => energy, bunch compression => longitudinal diagnostics => coarse diagnostics needed with large dynamic range (this talk) Stable operation of the machine = lock operating points a) single-bunch resolution b) feedback capability => high-resolution diagnostics needed (talk before lunch)

Injector laser & Gun set-up See talk by Siggi …

Measurement of absolute Beam Energy in BC2 OTR EBPM SR camera Alignment laser BPM 317.6 mm (survey data) BPM Absolute position of alignment laser: ~ ±0.5 mm Absolute BPM measurement: ~ ±0.5 mm Error of beam energy ~ 1mm/300mm ~ ±0.3% Absolute B field of dipoles: ~ ± 0.2% Error of absolute gun energy ~ ± 0.3 MeV => Error of measured energy gain in ACC1 ~ ±0.7% => ± 1MeV @ 130MeV

Minimum bend angle for SR Camera Beam centre: 292 mm ~ 16.5 deg However, best to stay at 18 deg for beam energy measurement if no particular angle is needed. 10 mm + 7 mm 26 mm 317.6 mm Angle under which SR is imaged: 6 mrad

1) Find on-crest phase (OTR,SR Camera in BC2) Setup of ACC1 phase: 1) Find on-crest phase (OTR,SR Camera in BC2) dE <= minimize energy spread (not exactly on-crest) => accuracy ± 0.5 deg Igor’s 1D simulation tool ~ 1 deg towards compression

1) Find on-crest phase (OTR,SR Camera) 2) Pyro phase scan Setup of ACC1 phase: 1) Find on-crest phase (OTR,SR Camera) 2) Pyro phase scan 9DBC2.3 Weaker signal in case 9DBC2.1 is saturated! ~ on-crest ~ SASE 9DBC2.1

1) Find on-crest phase (OTR,SR Camera) 2) Pyro phase scan Setup of ACC1 phase: 1) Find on-crest phase (OTR,SR Camera) 2) Pyro phase scan Saturated? Not centered in DR ? …

1) Find on-crest phase (OTR,SR Camera) 2) Pyro phase scan Setup of ACC1 phase: 1) Find on-crest phase (OTR,SR Camera) 2) Pyro phase scan Save&Restore required for Pyro Parameters! Especially if someone changes the setup! Accuracy ??? Saturated but scan is still working.

1) Find on-crest phase (OTR,SR Camera) 2) Pyro scan Setup of ACC1 phase: 1) Find on-crest phase (OTR,SR Camera) 2) Pyro scan 3) Start slow feedback => Ideally you have an old target value … Noisy signal (averaging required) See talk by S. Wesch Set target ~ 0.6deg in 2 hours Main beam-based slow feedback for compensation of phase drifts!

Save&Restore list for Pyros

1) Find on-crest phase (OTR,SR Camera) 2) Pyro scan Setup of ACC1 phase: 1) Find on-crest phase (OTR,SR Camera) 2) Pyro scan 3) Start slow feedback Proposed operating points for SASE. Igor’s talk 8-2-2010 Now: 2 phases to be set and controlled! Strong compression required if pyro detectors to be used as phase monitors. Other detectors: e.g. antennas in GHz range, EO, SR camera, …? => Operating points for 9mA run with 3rd harmonic need to be studied!

Measurement of Beam Energy in BC3 Only OTR screen at centre of vacuum chamber available Camera not aligned at the moment EBPM will become available for rel. beam energy measurements (has low prioritity) …?

Energy in dogleg/bypass See talk by Raymund Kammering …

Conclusion Absolute beam energy monitoring important for all accelerating sections! Needs proper design - you cannot simply take a dipole … Wrong beam energy (ca. 320MeV instead of 280MeV assumed) was one of the main reasons that prevented us from first lasing at TTF1!