Low temperature chiller Market Survey

Slides:



Advertisements
Similar presentations
EG Medical Systems Maintenance BU MEDICAL SYSTEMS Service Department Scope  Service Department offers after sales service for products sold by EG Medical.
Advertisements

Welcome to CERN Research Technology Training Collaborating.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Safety Driven Performance Conference 2013 The future of managing asset-intensive businesses John Keefe APM/RBMI Technical Manager Asset Integrity Services.
European Federation of Engineering Consultancy Associations.
Conformity Assessment and Accreditation Mike Peet Chief Executive Officer South African National Accreditation System.
Detector Cooling Project Thermosiphon Project Status Report
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
M. Battistin – 28 th May 2010EN/CV/DC1 M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop - Back-up solutions to.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
RP PROCEDURE FOR FLUID ANALYSIS Detector Cooling Project - 16 th June 2011 Heinz Vincke, Nadine Conan DGS/RP..... based on EDMS document # prepared.
Doing business with CERN Anders Unnervik 3 November 2014.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
CALLS FOR TENDER AND MARKET SURVEYS - ROLES AND PROCEDURES L.ANNILA, K.FORAZ PART 2. ROLE OF THE COMITE DE LECTURE.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st September 2009 ATLAS Working Group Thermo-siphon review - Low temperature condensation.
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
GOING ABROAD WITH ERASMUS+ STUDY OR TRAINEESHIP ABROAD INTERNATIONAL OFFICE 2015.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
© Enterprise Europe Network South West 2009 The Eurostars Programme Kenny Legg R&D Funding for the Environmental Sector – 29 June 2010 European Commission.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Cooling System Solutions
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
EN/CV/DC IT-3673 Presentation done by Elena Perez Rodriguez For further information contact For the purchase of cooling fluids.
Michele Battistin Elena Perez Rodriguez 10 November 2010
M. Battistin, J. Botelho – 20 October 2011EN/CV/DC Detector Cooling Project V Thermosiphon Workshop - Cost and Planning Michele Battistin Jose Botelho.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4134/EN/LHC Supply and Commissioning of HVAC Systems for Five LHC Surface Buildings B.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
IT-4014/EN/NA62 Technical Specification Dismantling, Design, Supply and Installation of a Ventilation and Air Conditioning System for ECN3, TCC8 and GHN300.
Doing business with CERN Anders Unnervik 20 May 2014.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4154/EN Supply Centrifugal Water Pumps B. Jenssen
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
M. Battistin –6 th July 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 6 th July 2009 DCP WP3 First thermo-siphon workshop - Low temperature condensation.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 4142/EN Supply, Installation, Testing and Commissioning of the HVAC System for the.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Best Sustainable Development Practices for Food Security UV-B radiation: A Specific Regulator of Plant Growth and Food Quality in a Changing Climate The.
CERN Procurement Procedures for the HL-LHC project Civil Engineering work London, 24 June 2016 Lisa Bellini-Devictor, CERN/IPT-PI.
CERN Procurement Procedures Rome, 28 th June 2016 Adam Horridge.
SAP Digital Business Services June 2016
Demineralised water cooling system
Minimum Set of Requirements for Suppliers
Doing business with CERN Anders Unnervik
EUROPEAN UNION – MAKING OFF European Economic Community
Minimum Set of Requirements for Suppliers
Doing business with CERN Anders Unnervik
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Doing business with CERN Dante Gregorio (dante.
Options for association and collaboration with CERN
Purchasing supplies at CERN
Invitation To Tender Procedure IT – 4327/SMB Technical specification for the civil Engineering works for the construction of the new building.
Cooperation between CERN and Ukrainian Industries 2017
First beam impact report
ALIGNMENT RULE PROCEDURE
ATLAS Thermosiphon Electrical Distribution and Run Modes
Adriatic Persian Gulf Map Test #1 Answers.
Today is a special day ... It is the 10 year anniversary of ...
ALIGNMENT RULE PROCEDURE
Adriatic Persian Gulf Map Test #1 Answers.
IT-4464/EN Bidders conference
Prodcom Statistics in Focus
Presentation transcript:

Low temperature chiller Market Survey By Elena Perez Rodriguez Thermosiphon project review (28/5/2010) Low temperature chiller Market Survey, done by Elena Perez Rodriguez. For more information, please contact elena.perez.rodriguez@cern.ch. For more information, please contact elena.perez.rodriguez@cern.ch EN/CV/DC

Index Introduction Purchase procedure Technical description Schedule Documents Technical description Scope of the purchase Requirements Possible suppliers Qualification criteria List of firms Conclusion 28/05/2010 Thermosiphon project

INDUSTRIAL STANDARD SOLUTION Introduction The chiller is a CRITICAL part of the Thermosiphon installation. In terms of cost (approx. 1.5 MCHF) In terms of reliability and maintenance The chiller is a CRITICAL part of the Thermosiphon installation. In terms of cost (approx. 1.5 MCHF), is the most expensive part of the station. In terms of reliability and maintenance, contains the active parts of the circuit. As it is in the surface and its fluid is not radioactive it can be easily accessed for preventive and corrective maintenance. To solve this problem, an industrial standard solution will be used. To search for the more adequate supplier, a Market Survey is taking place. In this presentation, an overview of this Market Survey will be done. INDUSTRIAL STANDARD SOLUTION MARKET SURVEY 28/05/2010 Thermosiphon project

Purchase procedure Schedule Installation and commissioning Market Survey Selection of the firms Invitation to Tender Reception of the offers Selection of the firm Lowest price that complies with specifications Purchase of the chiller Installation and commissioning 1st semester 2012 1st trimester 2011 September 2010 April 2010 Schedule for the purchase process of the chiller. Notice that the market survey has already been sent. 28/05/2010 Thermosiphon project

Purchase procedure Documents Market Survey Technical documents Technical description Qualification criteria Technical questionnaire Purchase documents List of firms Evaluation of firms All these documents are available in EDMS 1066003 and as part of the documentation of the Thermosiphon review. Technical documents Technical description: description of the technical characteristics required for the chiller. Qualification criteria: description of the criteria used to evaluate the possible suppliers. Technical questionnaire: document to be filled by the possible suppliers related to the qualification criteria. Purchase documents List of firms: list of firms to which the documents were sent. Evaluation of firms: excel table evaluation the possible suppliers according to the qualification criteria and their answers to the technical questionnaire. EDMS 1066003 28/05/2010 Thermosiphon project

Technical description Scope of the purchase Chiller Thermosiphon tank Chilled water The delivery shall include Hardware The complete chiller unit, including the brine circuit to be connected to the condenser (the supply shall not include the condenser) The electrical and control board. Software The regulation system configuration. Documentation The technical dossier, as from the template that will be provided in the invitation to tender, with the technical specification, shall include at least: The design calculations. The list of components and their technical data sheet. The complete electrical and control studies and schematics. The operation manual. The results of the performance tests. The preventive maintenance plan. Spare parts The required spare parts to perform the preventive maintenance plan. -70 C 200kW Control Documents Spares 28/05/2010 Thermosiphon project

Technical description Requirements Redundancy MTBF of at least one and a half years. Minimum power during preventive maintenance. Control based on a standard PLC Material Compatible with fluid CERN IS41 Safety European standards CERN rules Redundancy MTBF (Minimum Time Between Failures) of one and a half years. A minimum power shall be provided even during LHC technical stops, when preventive maintenance will be performed. Different scenarios of redundancy can be required between 30% and 100% of the power. Control Based on standard PLC. Material All the equipment materials shall be compatible with the fluid to be used into the different stages of the chiller. All not metallic material shall be compatible with CERN IS41. Regulations and safety: the firm shall follow European standards, including PED (Pressure European Directive) and PS-92 related to seismic design. CERN regulations concerning safety and environment http://safety-commission.web.cern.ch/safety-commission/SC-site/index.html . 28/05/2010 Thermosiphon project

Qualification criteria Possible suppliers Qualification criteria Experience 2 similar references. Experience with PLCs. In-house design office. In-house workshop. Size Annual turnover in cooling: 5 MCHF/year. 15 FTE engineers and technicians. Other ISO 9001:2000 Language: English or French Competence and experience Provide at least two references of successful design, construction, installation and commissioning of similar chiller installations done in the last five years. These references shall follow the European Standards. Have demonstrated experience in using industrial PLC’s in cooling plants in the last five years. Have an in-house design office with expertise in the field of designing refrigeration systems with at least three years of experience. The minimum size required is 2 FTE engineers and 3 FTE draftsmen. Have an in-house workshop equipped with: Premises suited for pre-installation and tests; Helium spectrometer for leak detection; Qualified stainless steel welders, at least 2 FTE; Qualified personnel for the manipulation of refrigerating fluids, at least 2 FTE; Size An annual turnover in the cooling activity higher than 5 MCHF/year during the last three years. 15 FTE (full time equivalents) engineers and technicians in the design and construction of cooling systems during the last three years. Quality assurance The firm has to be certified ISO 9001:2000 within the last three years. Language The contract manager of the firm must be able to communicate in English or French both verbally and writing. 28/05/2010 Thermosiphon project

Possible suppliers List of firms Country Number of companies Austria 4 Netherlands Belgium 2 Norway 1 Czech Republic Poland 3 Denmark 5 Portugal Finland Spain France 6 Sweden Germany 10 Switzerland Hungary United Kingdom 7 Italy 8 The full list can be consulted in EDMS 1066003 and as part of the documentation of the Thermosiphon review. 28/05/2010 Thermosiphon project

Conclusions A Market Survey is taking place to find an adequate supplier for the chiller. The documents can be consulted in EDMS 1066003 Contact persons: Elena Perez Rodriguez and Bjorn Jenssen CERN contact persons Persons to be contacted for technical matters: Name/Division/Group Tel-Fax Email Michele Battistin Tel: +41 22 767 80 87 Fax: +41 22 766 87 49 michele.battistin@cern.ch In case of absence Elena Perez Rodriguez Tel: +41 22 767 06 48 Fax: +41 22 766 84 60 elena.perez.rodriguez@cern.ch Persons to be contacted for commercial matters: Bjorn Jenssen Tel: +41 22 767 44 05 Fax: +41 22 766 80 89 Bjorn.Jenssen@cern.ch Sebastien Sonnerat Tel: +41 22 767 30 92 Fax: +41 22 766 98 95 Sebastien.Sonnerat@cern.ch 28/05/2010 Thermosiphon project

Thank you for your attention Any questions ? 28/05/2010 Thermosiphon project