1 OneGeology Technical meeting Utrecht 30-31 May 2007 Ian Jackson 30 May 2007.

Slides:



Advertisements
Similar presentations
Short overview of the SCORE project
Advertisements

The IPR-Helpdesk is a project of the European Commission DG Enterprise, co-financed within the fifth framework programme of the European Community © 2004.
1 Entering through the same door - Universal design put simple Soren Ginnerup Danish Building Research Institute Consultant to the COE group on Universal.
Planning Reports and Proposals
Using public procurement to foster research and innovation More Research and Innovation COM(2005) 488 of 12 October 2005 Commission communication to the.
IPv6 Program Update How to get more involved? Hisham A. Ibrahim IPv6 Program Manager, AfriNIC AfriNIC - 16, Gambia 17 May 2012.
1 of 19 Organization and Management New Structures and Alliances IMARK Investing in Information for Development Organization and Management New Structures.
Scaling up the global initiative on the implementation of the SNA and supporting statistics Meeting on Scaling up the coordination and resources for the.
1Bringing solutions home: Defining the scope for an action plan February International Organization for Standardization.
UNFCCC African Group Preparatory Meeting for COP9 Addis Ababa, October 20-24, 2003 Presentation on the Status of consideration of the IPCC TAR By: Nagmeldin.
Alex C. MUELLER, NuPECC meeting, Athens, March EURONS 1st annual report: Generalities (I) With an EC contribution of 14,056,000 EURONS is.
OA-Forum 1 st Workshop: Summing up & way forward Leona Carpenter (UKOLN) with Donatella Castelli (IEI-CNR) & Susanne Dobratz (HUB) Open Archives Forum.
Overview of Capacity Building Committee Activities GEO Capacity Building Committee Meeting Brussels – 14 September 2006 Errol Levy DG Research – European.
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
GEO Call for Proposals on Earth Observations in Decision Support Projects.
GEO-5 in Ottawa 1 29 November 2004 Draft GEOSS 10-Year Implementation Plan and Status Report on Reference Document Ivan B. DeLoatch, Toshio Koike, Robert.
SIF Status to ADC Co-Chairs
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
TCE Board Presentation February, 2006 Evaluating the Initiative Oakland, CA - Seattle, WA.
EU-Regional Policy Structural actions 1 GROWING EVALUATION CAPACITY THE MID TERM EVALUATION IN OBJECTIVE 1 AND 2 REGIONS 8 OCTOBER 2004.
The Implementation Structure DG AGRI, October 2005
The Managing Authority –Keystone of the Control System
The NATURE–SDIplus project Best Practice Network for SDI in Nature Conservation Co-funded by the Community Programme eContentplus ECP-2007-GEO Co-funded.
1 World Meteorological Organization WMO Information System (WIS) Managing & Moving Weather, Water and Climate Information in the 21 st Century WORLD METEOROLOGICAL.
Committed to connecting the world Bridging The Standardization Gap for Africa Africa Regional Preparatory Meeting for WTSA-12 Bridging the standardization.
Project design, preparation and approval Basel Convention Resource Mobilization Workshop Nairobi, 3 – 7 December 2006 Andreas Arlt Secretariat of the Basel.
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
0 - 0.
Addition Facts
1 Portals – an institutional imperative Paisleys portal production process Tony Shaw, Anne Strachan Network and Information Systems Management University.
2 Cataloguing and retroconversion: what do we need to know as a community ? Patricia Methven.
European R&D Support Programme ACCESSING EUROPEAN FUNDING FOR RESEARCH AND DEVELOPMENT.
Collection-level description & collection management: tool for the trade or information trade-off? Collection Description Focus Workshop 4 Newcastle, 8.
Collection-level description & the Information Landscape: users evaluate strategies for resource discovery Collection Description Focus Workshop 5 Cambridge,
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
1 The OneGeology project IC GS Ian Jackson, February 2007.
1 Project Management. 2 Mission and governance and scope Users and Usage Technical and funding assistance for some countries Support and involvement and.
OneGeology An overview Ian Jackson 25 April 2008 OneGeology Secretariat British Geological Survey.
1 IC GS J. Broome, Mar Introduction to the Informatics and Data Aspects John Broome (Canada)
1 NEST New and emerging science and technology EUROPEAN COMMISSION - 6th Framework programme : Anticipating Scientific and Technological Needs.
Enterprise Directorate General European Commission Supporting NCPs’ activities Irja Vounakis
1 Dissemination to Policy and Decision Makers and a Wider Audience Peter J. Bates pjb Associates
SAI Performance Measurement Framework
How to commence the IT Modernization Process?
ITU Activities on Bridging the Standardization Gap (BSG) ITU Regional Standardization Forum for Africa (Kampala, Uganda, June 2014) Vijay Mauree,
Maputo, Mozambique, April 2014 ITU Activities on Bridging the Standardization Gap (BSG) Hiroshi OTA Study Group Engineer, ITU/TSB
Slide # 1 Report to ADC AR Status Doug Nebert, POC U.S. Geological Survey.
1 Development of Electronic Reporting Tools for IPPC Directive and WI Directive Workshop – Objective and next steps Tuesday 3 rd March 2009 Meeting room.
Addition 1’s to 20.
Week 1.
European Clearing-House Mechanism Portal Toolkit Expert Group Meeting
1 What is the Internet Archive We are a Digital Library Mission Statement: Universal access to human knowledge Founded in 1996 by Brewster Kahle in San.
FRED Interlinked Registries DRAFT roadmap for consideration.
OneGeology Making geological map data for the Earth accessible 1 March 2008 OneGeology Secretariat.
IC GS Informatics Breakout Group. Informatics Breakout – topics discussed 1)How will 1G integrate with topographic data? 2)Centralized, distributed, or.
1 OneGeology IC GS Ian Jackson, March Introduction to OneGeology And this Workshop and the week ahead IC GS Ian Jackson, March 2007.
OneGeology IC GS. A project to make web-accessible the best available geological map data worldwide at a scale of about 1:1 million, as a Geological Survey.
Making Geological Map Data for the Earth Accessible OneGeology, the story so far….
Welcome !. OneGeology The current position Ottawa 2 November 2007.
Workshop WSS-03: Delivery of Geoscience Information using Web Services IGC August 2008.
CGMW Commission for the Geological Map of the World Headquarters:
Introduction to the CGI - aims, activities and progress Kristine Asch, CGI Chair.
Utrecht Technical Workshop Outcomes and progress to date OneGeology Management Meeting, Nov 2-3, Ottawa.
GEO Standards and Interoperability Forum SIF First Organizational Meeting 27 July 2007 Barcelona, Spain.
8.Communication and Website Early communications Name & logo Trailer web site Brighton media relations Brighton visual material Brighton videos New web.
OneGeology in Asia Koji Wakita Geological Survey of Japan.
Status and Progress of OneGeology: Operational and Technical Ian Jackson and Francois Robida 23 April 2009 OneGeology Secretariat.
TAIEX-REGIO Workshop on Applying the Partnership Principle in the European Structural and Investment Funds Bratislava, 20/05/2016 Involvement of Partners.
OneGeology IC GS.
Global GEO-Map a proposal for the International Year of Planet Earth
Presentation transcript:

1 OneGeology Technical meeting Utrecht May 2007 Ian Jackson 30 May 2007

2 Contents of this presentation Review & current status of OneGeology Scope and objectives of this meeting What’s out of scope Considerations

3 OneGeology (or 1G) is…. A project to make web-accessible the best available geological map data worldwide at a scale of about 1:1 million, as a Geological Survey contribution to the International Year of Planet Earth

4 1G is about making the data interoperable

5 1G is not about harmonising the data

6 Who is backing 1G? International Year of Planet Earth (IYPE) Commission for the Geological Map of the World (CGMW) International Union of Geological Sciences (IUGS) International Lithosphere Program International Steering Committee for Global Mapping (ISCGM) An international consortium of Geological Surveys International Bodies UNESCO EuroGeoSurveys Co-ordinating Committee for Geoscience Programmes in East and Southeast Asia (CCOP) Commission for the Management and Application of Geoscience Information (CGI) GSO

7 We are now 65 participating nations

8 The objectives Making existing geological map data accessible –in whatever digital format is available in the participating country Transferring know-how to those who need it Stimulate a rapid increase in interoperability (ie disseminate GeoSciML further and faster)

9 That means OneGeology is: focusing on Internet access to digital data rather than paper maps - society wants its information on- demand adopting an approach that recognizes that different nations have differing abilities to participate. facilitating the transfer of know-how and technical expertise and data between nations - Cutting the learning curve and costs to nations with limited resources

10 The Outcome “The Brighton Accord” 81 participants from 43 nations and 53 national and international bodies Agreed OneGeology should go forward Mission: improve the accessibility of global, regional and national geological map data and increase its usefulness to society Focus on making accessible existing geological map coverage Recognise that this will catalyse scientific harmonisation of map data globally.

11 The Brighton Accord - continued Priority is access to ~1:1 million data but with links and interoperable with applications for societal access and wider-resolution mapping. Aims to benefit society and improve the efficiency and effectiveness of Geological Surveys. Participants to seek funding to support 1G and develop strategies to provide mutual assistance to build participant capacity. Data distributed will be owned by the originating Geological Survey and ideally be available at no cost.

12 Governance: Steering Group of Geological Survey representatives with link to international bodies Must interact with the wider geo-spatial community Secretariat based in the BGS until Dec Priority: make available interoperable, Internet- accessible, scientifically-attributed data Progress at levels appropriate to participants’ capability Geological Surveys to work together to develop interchange standard to make their data interoperable Progress to be presented at the International Geological Congress in Oslo in 2008 The Brighton Accord - continued

13 65 Geological Surveys around the world have expressed interest in 1G 8 global bodies, 2 international geoscience organisations, 2 multinational companies and 3 celebrities are actively supporting 1G! Kick-off Workshop concluded successfully in an Accord (agreed by 81 participants from 43 nations & 53 organisations) 1G has momentum and has captured the imagination of people inside and outside the geosciences. BGS have allocated an initial € to move project forward in 2007/08, TNO are supporting first Tech. Workshop Today! Summary of 60 weeks (February 2006 – May 2007)

14 To make a practical start on the OneGeology ~1:1 million scale initiative To do this in conformance with the Brighton Accord and the Technical breakout group outcome To initiate a prototype 1G portal/web site as soon as possible (something available before 31 December 2007 if possible……?) To develop an action plan and allocate the tasks for all involved partners, to meet the above objectives Scope and objectives of this meeting

15 Overall project resources and funding Financial assistance to developing nations Intellectual property rights OneGeology governance Geopolitics. Communication Website, other than the map portal These are to be discussed at a separate meeting to which all will be again invited What’s out of scope at this meeting

16 The prototype portal/web site must: demonstrate the broad extent of the 1G concept including making web map services (images – from paper maps or vector or raster data) )and vector data as XML (GeoSciML) available for viewing and using. Must be based upon open standards Can be unilingual (English) in this first instance Show data from as many continents a possible. Considerations

17 Aim is to share the prototype tasks amongst the participants URL of the prototype and associated documentation to go to all 1G participants for comment Quick deployment takes priority over depth-of-data, uniformity, and sophistication Purpose of the exercise is to provide a tangible "strawman" to illustrate and test the concept Allows us to move forward practically through "build- review-revise" Considerations

18 GeoSciML is the potential supporting technology for 1G 1G and GeoSciML are symbiotic but distinct. Cataloguing available geological maps/coverages is not a priority at this stage. 1G participants are expected to contribute own resources for this prototype development project Considerations

19 Thank you Good luck! Any questions ?