Practical Assessment Project Template Project title: <title of the project> Organization: <name of your organization> Project leader: <your name> Belt level: <Black or Green Belt> Revision date: <e.g. 02-08-2017>
DMAIC Introduction for this template Objectives of this presentation: Certification by LSSA Project summary for your organization Guidelines: Methodology and logic understandable, for a Lean Six Sigma trained external colleague Clear conclusions on each sheet Target for certification is max. 25 sheets (no limit for internal use) No back-up sheets Delete the (Italic) notes for the user, upon need Delete this slide before handing in.
DMAIC Process improvement roadmap DMAIC roadmap Define 1 Define and Scope project 2 Define defect and CTQs 3 Plan and document project Measure 4 Evaluate measurement system 5 Establish baseline 6 Set improvement goals Analyze 7 Map process and identify inputs 8 Isolate key inputs 9 Develop Y=f(X) function Improve 10 Determine optimum settings 11 Implement proposed improvement 12 Validate proposed improvement Control 13 Implement control strategy 14 Close out project
DEFINE 1 – Define and scope project Problem Description: What is wrong, how does it affect the customer, what is the pain for the organization? Is it a priority, so in line with top-down priorities? Add picture or drawing to explain (If ready, delete this textbox) Objectives: What do we want to achieve? Helicopter view description. (delete this textbox)
DEFINE 1 – Define and scope project Target: Describe the quantified, measurable result (not the solution!). What is the required timing? In Scope What are the boundaries of the process to analyze; what are you allowed to change? Out of Scope: What not . . . ? Deliverables: What evidence to put on the table to show that target metrics are met? This is the key element in the agreement with the champion Hard Benefits: Summarize the calculation to show that this is a ‘major cost saving’ or cost avoidance, in Keuro/year. Upon need add a separate sheet Soft Benefits: Any nice additional benefits, like customer satisfaction, learning Lean Six Sigma
DEFINE 2 - Define defects and CTQs Start from customer perspective ‘OK for customer’ Customer specification Internal specification This can be a vague description of the critical variable VOC Variable: ……… Target: ………… Specifications: …… CTQ ext Describe the measurable variable and specifications as required by the customer. Variable: ……… Target: …… Specifications: ………… Describe the measurable variable and specifications as defined in own organization. Can be different from the CTQext, but must have a known/proven relation with CTQext. CTQ int High level, describe until highest level measurable CTQ int. (the project target) Legend: solid line: proven relation dotted line: relation tbd. grey box: out of scope white box: potential CTQ, or group of CTQs
DEFINE 3 – Plan and document project Project Team Supplier: Champion: User: MBB: who provides resources driving for success will benefit from the results coach for methodology Project leader (Belt): Actively involved members in team meetings Name: Role: Responsibility:
DEFINE 3 – Plan and document project SIPOC is mandatory for process improvement For design improvement: visualize product problem area SIPOC Process Map Supplier: Inputs: Process: Outputs: Customers: ‘Process’ Controllable variables + specs Output variables Main noises Standard Operating Procedures If helpful show below detailed steps on the process Step 1 Step 2 Step 3 Step 4 Step 5
Self Assessment LSSA Assessor Feedback DEFINE Assessment Self Assessment LSSA Assessor Feedback Missing Incorrect Correct N/A Define 1 Project addresses a clear business opportunity (GB: 20k€ p/year; BB: 50k€ p/year). 2 Problem description has been clearly defined. 3 Goals have been clearly defined. Project objectives are measurable. 4 VOC and VOB have been clearly defined. Requirements have been understood. 5 Scope of the project has been clearly delineated. 6 Key stakeholders have been involved and informed. 7 Relevant KPI's have been selected / CTQ-flowdown has been constructed. 8 SIPOC has been made. Missing Incorrect Correct N/A Define 1 Project addresses a clear business opportunity (GB: 20k€ p/year; BB: 50k€ p/year). 2 Problem description has been clearly defined. 3 Goals have been clearly defined. Project objectives are measurable. 4 VOC and VOB have been clearly defined. Requirements have been understood. 5 Scope of the project has been clearly delineated. 6 Key stakeholders have been involved and informed. 7 Relevant KPI's have been selected / CTQ-flowdown has been constructed. 8 SIPOC has been made.
MEASURE 4 – Evaluate measurement system For Target internal CTQs Evaluate whether measurement error for the CTQ int, described in the target is good enough for this project. e.g. reference data, GR&R, bias, attribute agreement, etc. Measurement error CTQ int Conclusion:
MEASURE 5 – Establish baseline How is the situation on the CTQs in the beginning of the project? (measured with the known error) e.g. results of capability & performance study If historical measurement error is unknown, add a note. Visualize if possible, for instance in time. Conclusion:
MEASURE 6 – Set improvement goals Final Target Evaluate whether the original target(s) are realistic. If necessary describe the rational why the targets are being adjusted. Conclusion:
Self Assessment LSSA Assessor Feedback MEASURE Assessment Self Assessment LSSA Assessor Feedback Missing Incorrect Correct N/A Measure 1 Data has been collected / selected properly. 2 The collected data has been proven to be representative for the project. 3 Validity of the data has been verified in an appropriate way (Gage R&R if applicable). 4 Historical data has been used to visualize process stability and performance over time. 5 Variation in the process has been considered (common cause or special cause). 6 Short term versus long term performance has been considered. 7 Performance against requirements has been checked. Missing Incorrect Correct N/A Measure 1 Data has been collected / selected properly. 2 The collected data has been proven to be representative for the project. 3 Validity of the data has been verified in an appropriate way (Gage R&R if applicable). 4 Historical data has been used to visualize process stability and performance over time. 5 Variation in the process has been considered (common cause or special cause). 6 Short term versus long term performance has been considered. 7 Performance against requirements has been checked.
ANALYZE 7 – Map process and identify inputs Process Map Input variable 1 Input variable 2 ............. Use this format for process improvement (in case of Lean project use a VSM) For design improvement use Boundary Diagram or Parameter Diagram, for the applicable function(s) (process step 1) Input variable 1 Input variable 2 ............. …. Input variable 1 Input variable 2 ............. …. Input variable 1 Input variable 2 ............. (process step x) Output variable 1 Output variable 2 Output variable 3 ............. These should be the CTQs Conclusion:
ANALYZE 7 - Map process and identify inputs Create this diagram to complete and categorize the list of inputs Ishikawa Diagram Measurement Machine Men Defect Methods Environment Materials Conclusion:
ANALYZE 8 – Isolate key inputs If a large number of inputs is identified, it is important to limit the analysis to a small set of important (key)inputs. Tools include: Cause & effect matrix, screening (DOE), FMEA Conclusion:
ANALYZE 9 – Develop Y=f(X) function Tools: Anova, Regression, DOE, simulation, etc Conclusion:
Self Assessment LSSA Assessor Feedback ANALYZE Assessment Self Assessment LSSA Assessor Feedback Missing Incorrect Correct N/A Analyze 1 Process has been mapped in detail (e.g. Process Flow / VSM Current State). 2 Potential factors of influence have been determined. 3 Cause & Effect / FEMA have been used to identify factors with highest influence. 4 Hypothesis for root cause has been defined properly. 5 Input data has been collected and analyzed correctly. 6 Graphical and statistical techniques have been applied to investigate root causes. 7 Major root causes have been identified. 8 Conclusions have demonstrated strong evidence / statistically valid. Missing Incorrect Correct N/A Analyze 1 Process has been mapped in detail (e.g. Process Flow / VSM Current State). 2 Potential factors of influence have been determined. 3 Cause & Effect / FEMA have been used to identify factors with highest influence. 4 Hypothesis for root cause has been defined properly. 5 Input data has been collected and analyzed correctly. 6 Graphical and statistical techniques have been applied to investigate root causes. 7 Major root causes have been identified. 8 Conclusions have demonstrated strong evidence / statistically valid.
IMPROVE 10 – Determine optimum settings DOE, simulation, etc Conclusion:
IMPROVE 11 – Implement proposed improvement Show a list of implemented improvements Conclusion:
IMPROVE 12 – Validate proposed improvement Show the verification run compared to baseline that the Define conditions will be met. Conclusion:
Self Assessment LSSA Assessor Feedback IMPROVE Assessment Self Assessment LSSA Assessor Feedback Missing Incorrect Correct N/A Improve 1 Improved process meets the requirements of the VOC and VOB. 2 Risks have been assessed (e.g. pFMEA). 3 Resistance for change has been overcome / Risks have been mitigated. 4 Internal and external clients have accepted the new process. 5 Improvements have been proven to be successful. (Capability study if applicable). Missing Incorrect Correct N/A Improve 1 Improved process meets the requirements of the VOC and VOB. 2 Risks have been assessed (e.g. pFMEA). 3 Resistance for change has been overcome / Risks have been mitigated. 4 Internal and external clients have accepted the new process. 5 Improvements have been proven to be successful. (Capability study if applicable).
CONTROL 13 – Implement control strategy Open actions …. Documentation Component drawings Manufacturing specifications Control plan Engineering reports FMEA Roles & responsibilities Actions and owners necessary to finish this project How is assured that all information is well documented for future success What are the key roles & responsibilities to assure continued success
CONTROL 14 – Close out project Conclusions …. Recommendations Lessons learned Relate this to the project objective, targets and deliverables For follow-up, next steps, or next projects For colleagues, others
CONTROL 14 – Close out project The realized benefits of this projects are: Summarize final total savings, average per year Champion: Date, Name & Signature - Controller: Date, Name & Signature - LSSA Assessor: Date, Name & Signature -
Self Assessment LSSA Assessor Feedback CONTROL Assessment Self Assessment LSSA Assessor Feedback Missing Incorrect Correct N/A Control 1 Evidence of 'In-Control situation' is available and sufficient. 2 Improvements have proven to be sustainable. 3 Measures have been put in place to monitor process performance. 4 Documentation has been updated (pFMEA, Control Plan, SOPs). 5 Training has been performed for the new process. 6 Project report has been completed. Lessons learned have been communicated. 7 Champion has been involved and signed the project. 8 Controller signed that project savings / benefits have been achieved. Missing Incorrect Correct N/A Control 1 Evidence of 'In-Control situation' is available and sufficient. 2 Improvements have proven to be sustainable. 3 Measures have been put in place to monitor process performance. 4 Documentation has been updated (pFMEA, Control Plan, SOPs). 5 Training has been performed for the new process. 6 Project report has been completed. Lessons learned have been communicated. 7 Champion has been involved and signed the project. 8 Controller signed that project savings / benefits have been achieved.