dTIMS in Western Australia

Slides:



Advertisements
Similar presentations
GREEN PAPER "TOWARDS A NEW CULTURE FOR URBAN MOBILITY" EUROPEAN COMMISSION.
Advertisements

Local Government Roads. ROMAN I Current business processes ROMAN II Proposed business processes Data issues Conclusion Outline.
December 10, 2014 Highway Maintenance and Preservation Needs WSDOT Can Provide Reliable Long-Term Pavement Estimates, but Accuracy of Bridge Estimates.
Shire of Leonora – What’s Down the Track Forum October 2014 Tanya Browning Deputy CEO Shire of Leonora.
The City of Kalgoorlie - Boulder What’s Down the Track? CEO Don Burnett.
Realising the Power of Location A Location Information Strategy for Western Australia Kylie Armstrong | Western Australian Land Information Authority (Landgate)
Road development in an age of austerity Graham Dalton Chief Executive, Highways Agency CIC February 2012.
Lloyd’s Register: Transportation Introducing Lloyd’s Register Transportation.
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
Compendium of Best Practices and Benefits of National Logistics Associations in Selected APEC Economies First Workshop, Oakes on Collins Melbourne, 5-7.
1 Ministry of Transport, Public Works and Water Management.
FINUAS Network Meeting 22 July 2009 Brendan Kelly, Director Financial Services Ireland.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Freight Issues in the Report of the National Surface Transportation Policy and Revenue Study Commission Transportation for Tomorrow.
Asset Management Strategies: Moving from costs to outcomes Tyrone Toole, ARRB Group Ltd South East Australian Transport Strategy Inc, Ordinary General.
1 Transportation Infrastructure Programs Past, Present & Future Transportation Association of Canada Fall Conference September 2011 Edmonton, Alberta.
Contribution of TVET to economic growth: an Australian case study Peter Holden Executive Director, International.
Managing the Local Government Transport Infrastructure Gap Warren Sharpe DIRECTOR INFRASTRUCTURE SERVICES SEATS Meeting - 18 May 2012.
Nate Asplund Director – Public Private Partnerships September 20, 2009 SCORT 2009 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII.
Simon Ramsay President. Rail Freight Grains industry dependent on efficient rail transport Average of 2 million tonnes of grain moves by rail Predicted.
Asset and Network Information Routable Road Centreline A Main Roads Perspective Steve Boston Manager Asset & Network Information August 2009.
1 Asset Management and Multi-Year Programming Christopher R. Bennett University of Auckland Highway and Traffic Consultants Ltd.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
1 The HDM Approach to Multi- Year Programming Christopher R. Bennett University of Auckland Highway and Traffic Consultants Ltd.
Industry Briefing 25 May 2016.
Implementing a National Pavement Management System: New Zealand’s Pragmatic Approach Dr. Christopher R. Bennett HTC Infrastructure Management Ltd.
Title: Road vs. Rail… A shift towards rail Date: 16 Nov 2015.
Road Investment Decision Framework
(c) IRU Academy 2011 Developing professional Training in Syria: IRU Recommendation Damascus, 9 th February 2011 Haydar Özkan IRU General Delegate to the.
Overview of dTIMS Input, Analysis and Reporting HTC INFRASTRUCTURE MANAGEMENT LTD.
Invest in Renfrewshire Partnership Conference on Employment & Economic Development 16 June 2016 City Deal and our Role in the Regional Economy Mary Crearie.
Procurement Development Programs
Optimisation Modelling for Roads through an Outsourced Service
MAIN ROADS WA & LOCAL GOVERNMENT
Challenges and solutions for transport in Norway
EIM/EFRTC Working Together for Improved Market-Access
THE 4 STAGES OF EXPORT PREPARATION E X P O R T P L A N
Developing Transport Service Contracts
Multi-Year Programming and Predictive Modelling
Future of Local Government Summit Local Government Sustainability
5 “Quick Fixes” 2012 International Local Government and Asset Management Conference Ian Mann CT Management Group.
EUM Model Benchmarking Toronto Water EUM Model Evaluation
Socio economic benefits of highways maintenance
L’asset management appliqué aux Chemins de Fer
Municipal Association of Victoria Rate Cap Forum 25th November 2015
KEYNOTE STAGE SPONSOR.
Loddon Campaspe Integrated Transport Strategy
Welcome on behalf of the Warwickshire Safeguarding Board
Outcross Resources - Services Overview
Introduction and Applications
Future of Local Government Summit Local Government Sustainability
Innovate. Improve. Grow. WEAVER: HEXAPOD ROBOT WITH 5DOF LIMBS FOR NAVIGATING ON UNSTRUCTURED TERRAIN.
Municipal Association of Victoria Rate Cap Forum 25th November 2015
Regions for Economic Change – Tools for smart regions
Experiences with On-Board Mass Monitoring in Australia Gavin Hill General Manager, Strategic Development Transport Certification Australia.
5 “Quick Fixes” 2012 International Local Government and Asset Management Conference Ian Mann CT Management Group.
Loddon Campaspe Integrated Transport Strategy
Optimisation Modelling for Roads through an Outsourced Service
East Coast Route Study November 2016 update.
Agenda item 5b Main challenges and priorities for future work Implementation of the 2008 SNA in the EECCA, SEE and Mongolia Presentation by UNECE Workshop.
Assessing Vulnerability & Climate Change Impacts
Our Municipality’s Finances
VR in brief Annual net turnover EUR 1,139.9 million Personnel 14,400
Financial and IT Services
Rail transport developments Agenda point 7.2
Labour Market Information (LMI) What does it tell us?
Manilla Low Level Crossing Project
Country Report of the Statistical Center of Iran for Workshop on Integrated Economic Statistics and Informal Sector for ECO Member Countries November.
About us… Click.
Presentation transcript:

dTIMS in Western Australia Paul O’Docherty – Senior Asset Management Consultant, Talis

Agenda Introduction to Talis – What we do and who we are History of dTIMS in Western Australia Why we need dTIMS in Australia Talis’ Hosted Bureau Service for WA Local Government Case study Where to from here Summary

Talis Small specialist consultancy based in Perth Western Australia New company – 4 years old 4 years ago employees were 4 directors, now 22 staff Extensive experience and knowledge of Western Australia Local Government – Political, Technical, Financial and Operational

Talis Services Specialist services include Asset Management Spatial Intelligence Waste Management Environmental Civil Design

Asset Owners in WA Main Roads Western Australia Local Government dPAW – Largest network in WA (mostly unsealed tracks) Watercorp Rail Mining Oil and Gas Grain – CBH Defence

History of dTIMS in Western Australia MRWA user since ???? Deployed as part of Roman II in 2011 for generating optimised Forward Works Programmes for LG Hosted dTIMS v8 Enterprise delivered via Citrix WALGA gave limited support and training – focused on Asset Inventory system Recorded usage was low through hosted system Some consultants using their own licences so their usage was not recorded

History of dTIMS in Western Australia 2015 WALGA decided to discontinue support for dTIMS through Roman II Consultants could still offer modelling services through WALGA panel Talis decided to work with Deighton setup a hosted system for WA Local Government System is now live!

Need for long term Asset Management planning in Australia

Some facts and figures In 2013–14, 9.6 per cent of Australia’s GDP was accounted for by Australian infrastructure industries In 2013–14, almost 50 per cent of infrastructure construction was in the transport sector, $25 billion was spent on roads Australia’s total road length was 872 849 kilometres in 2013 In 2012–13, there were 203.6 billion tonne kilometres of freight moved by road 176 billion passenger kilometres were travelled on capital city roads Note - Australia's population 23 million Source: BITRE, Australian Infrastructure Statistics Yearbook 2014,

"Selected year 2006 road traffic data" "Selected year 2006 road traffic data". OECD International Traffic Safety Data and Analysis Group (IRTAD)

Source: BITRE, Australian Infrastructure Statistics Yearbook 2014,

Why is our Infrastructure Important? “Infrastructure is important for Australia because of its size, the geographical dispersion of its population and production centres, and its remoteness from other markets.” – Organisation for Economic Co-operation and Development, September 2015 Source: BITRE, Australian Infrastructure Statistics Yearbook 2014,

Australian Infrastructure Our asset infrastructure base is growing Demand on the assets is increasing Maintenance expenditure has not be kept in line with growth When budgets are constrained often maintenance suffers If we want our infrastructure to return value, we must maintain what we build.

Desired Outcomes from modelling in WA Establish network need Identify operational efficiencies What if analysis?? Better use of constrained budgets – Optimisation FWP Strategic analysis Compliance Understanding!

Software Solution

Asset Deterioration Modelling

Deterioration Modelling Methods Deterministic models HSD Demand, weather, soil type and other factors to calibrate rate of deterioration Probabilistic Models Data with discreet bins – Visual data Calculates probability of being in the next condition state Probability established from historic data Families of like performing assets – Road hierarchy, Urban/Rural , pavement strength, soil type, demand

Probabilistic Models – Markov Chain If more than 1 survey available Group into like performing families Calculate probability of change for family Assign to section Use local knowledge as sanity check Only 1 survey available Use local knowledge to determine rate of change Prob.xlsx

Talis Modelling Process Capturing local knowledge Documenting knowledge Model implementation and run Review and improve Field validation Long term improvements and maintaining the model

Capturing Local Knowledge Workshop with local experts – Technical and operational Capture required outcomes (minimise rutting, smoother network, minimise maintenance $ etc) How do local assets deteriorate Segmentation rules Intervention levels Treatment selection process Alternative treatment scenario criteria Unit rates What are our optimisation parameters – Objective function Budgets to model

Documenting Treatment Selection

Model Review and Improvement How do we get better Implementing added functionality Measuring success and value Sharing success with entire industry – Locally, National, Globally

Analysis of Multiple Strategies Analysing alternatives Unsealed roads – what if we let them deteriorate? Key routes – What will be our long term costs if we raise level of service? Un-Constraining Funding Criteria Cross asset optimisation – What if I take money from road maintenance and put some towards bridges?

WA Asset Management Cycle Data Collection Inventory validation Asset Valuation 10 year FWP Year 1 Inventory updates Revaluation Updated Annual FWP Year 2 Year 3

Regional Road Groups in WA Goldfields RRG Kalgoorlie Coolgardie Menzies Laverton Leonora Dundas Esperance

Example of Regional Road Group Council Unsealed length km Sealed length km Esperance 3,740 855 Kalgoorlie-Boulder 1,030 376 Coolgardie 800 428 Dundas 500 860 Leonora 1,213 363 Menzies 2,144 36 Laverton 4,442 57 Wiluna 1,832 92

What can Modelling offer RRGs? Strategic analysis of region – based on each individual network Strategic analysis of individual LGs Optimise shrinking budgets Understand and communicate outcomes from constrained budgets Effect of capital expansion

Shire of Augusta Margaret River Case Study

Shire of AMR Overview 2014 Talis undertook condition assessment and dTIMS Modelling at Shire of Augusta Margaret River Asset inventory updated Visual condition survey undertaken and uploaded to RAMM dTIMS model implemented 10 year FWP and predicted condition report delivered The outcomes identified issues with the funding model

Margaret River Modelling Project Initial site visit to capture expectations Data collection completed Data updated in asset register (RAMM) Workshop to determine desired outcomes and model parameters Technical staff, operational staff, financial staff from council Business rules established for sectioning, treatment selection and optimisation Added a refined hierarchy system to better categorise roads

Margaret River Modelling Project Model implementation Initial model run Alternate budget scenarios run Desktop sanity check Field validation Model refining and extra scenarios added Outcomes – This is where it gets interesting!

Margaret River Modelling Outcomes The funding model heavily favours rehab projects above resurfacing – Limits potential treatment strategies Budget scenarios were constrained to allow for this Alternate strategies were run with the funding constraint removed – money could be spent reseal or rehab Outcome – Costing approx. 20% more to get comparable result constrained vs unconstrained

Margaret River Modelling Outcomes

PCI – Alternative Funding Scenario ConditionByRoadHeirarchy.xlsx

An Opportunity?? There is potential to get a similar result for network even with reduced funding!! Should be challenging funding methodology? To understand the long term effects of current funding levels Explore and analyse at a regional level to get best value for a wider region? There is always opportunities to be more efficient and make better with limited funds!

Talis Services Offered Bureau Service – Model setup and run, forward work programme proposed sites and treatments, condition prediction from budget scenarios Hosted Option – Includes all services offered in Bureau Service plus client access to dTIMS, support and customised reports. Client owns model setup and IP Enterprise License – Includes all of above options plus install and deploy dTIMS on your IT environment, support and continuous improvement.

Summary

Dale Hughes Paul O’Docherty dale.hughes@talisconsultants.com.au 0418 908 621 Paul O’Docherty paul.odocherty@talisconsultants.com.au 0488 216 206