An Architects View Non Structural Seismic Design

Slides:



Advertisements
Similar presentations
Reducing construction waste through design Dave Marsh Construction Project Manager.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
DoI Procurement Overview Improvements to Process Cindy McDonald Director Contracts and Program Management Construction Industry Forum 30 May 2013.
© 2011 Autodesk The e-SPECS® BIM Process Peter Marchese Microdesk, Senior Consultant.
Each user is assigned a username as well as a password– multiple users may use the same password but only one at a time The G.O. Contracts database provides.
How to submit your 2014 Summer Reading Project by Mrs. Csorny
SOUTH ASIA LAUNCH OF GLOBAL CAMPAIGN MAKING CITIES RESILIENT MY CITY IS GETTING READY New Delhi June 8-9, 2010.
Facilities and Construction: Did you know your GPO can help?
National Spent Nuclear Fuel Program Meeting April 14, 2009 Stephen O’Connor, Director Office of Packaging and Transportation.
AN INVESTIGATION INTO THE EFFECTIVENESS OF PARTNERING IN PROMOTING HEALTH AND SAFETY MANAGEMENT ON CONSTRUCTION SITES Brian C Heath BSc, MSc, MRICS Directorate.
Cash study 5 Chapter 9 Not for Profit Organization Craig Lizotte.
Asbestos Awareness Annual Presentation DET Staff/P&C.
Contractors CDM Compliance Kit CDM Contractors CDM Compliance Kit PRODUCT OVERVIEW.
CDM & RIBA Plan of Work th June 2013 Ross Gooding – Principal Health and Safety Consultant / CDMC.
Web Content, Ad Copy, Blogs, Social Networking, Research-based Articles.
Federal Emergency Management Agency Unit U nit 3- Mitigation Measures by Type of Disaster.
Anytime 24 hours a day, 7 days a week the parts library around the world will come to you. Toyota Industries Corporation.
URL Tagging. What is URL Tagging? URL tagging is a system of building URL file paths with campaign Source, Medium, Name, Term, or content. You can set.
Museum of 2012 Brief. Introduction To hold cultural and social record of 2012 To transform a way-point into a landmark destination On a main route into.
Welcome to Course title goes here Your Logo. Introduction.
Enhanced Capital Allowances Tax Relief for Businesses Investing in Technologies Benefiting Water Use and Quality.
Basic Search Engine Optimization. What is SEO?  SEO is an abbreviation for search engine optimization.
 Good navigation is consistent, clearly labeled, and reflects the needs of the site’s audience.  Navigation labels are short, clear, and user-friendly.
 Shopping Basket  Stages to maintain shopping basket in framework  Viewing Shopping Basket.
Dynamo use cases on the New Rennes Subway Line. London General Contractor & Construction company 1400 employees 380 M€ Turnover Engineering Office: INGENOVA.
Teledyne QUG V MidasWL MOV Integrated Design Analysis System WEAK LINK Software.
GATE SAFETY WEEK 10 th – 16 th OCTOBER GUIDANCE FOR POWERED GATE GROUP MEMBERS KEEPING THE NATION SAFE How DHF Powered Gate Group members can lend their.
Department of Transportation Road Services Division Snow and Ice Response
Geoffrey Chaucer The Canterbury Tales Click on this link for many reliable areas of interest regarding The Canterbury Tales:
Kapi’olani Community College Art 128 Interface Programming 1 In-class Presentation Week 2B.
OPS 571 Week 2 Learning Team Reflection To purchase this material click below link Week-2-Learning-Team-Reflection.
Get Short Term Loans at Paydayloan93kod.org/
Click Here for Best Gourmet Food Online - Bottegagourmet.com
LDR 531 Week 6 DQ 1 To purchase this material click on below link 531/LDR-531-Week-6-DQ-1 LDR 531 Week 6 DQ 1 How has.
Putting the Right Waste, in the Right Place
Cryogenic safety organisation at CERN
Joanne Macgregor C Lund & Son Ltd March 2016
UST Inspection Program
Façade Management Consulting
The Canterbury Tales Geoffrey Chaucer
Focus on high consequence risks
The public – private continuum
Course title goes here.
Helen Ferner – Technical Director Structural Engineering
Regulation of non-structural elements in NZ
NZS 4219:2009 Seismic Performance of Engineering Systems in Buildings
An Analysis of Project Management Practices Related to Constructability followed in Indian Construction Industry Sharmin Khan Assistant Professor, Department.
ICT Computer Skills Year One.
To help make ITU’s history accessible to anyone, anywhere and at any time, we launched the History of ITU Portal in February 2010 and today the new and.
The purpose of this Code is to assist the construction industry, building consent authorities, architects, engineers, builders, installers and specifiers.
Essex Developers Group Construction Skills
Segmentation Quadrants
Architecture and Building Culture Policy of the Czech Republic
Opportunities arising from housing development schemes
Today’s goals Review relevant materials for the upcoming quiz
Essex Developers Group Construction Skills
Bushfire Compliance– October 3rd 2018
Do Now Today, you will complete a current event. So begin the period by finding a current news article from one of the sites listed on the current event.
Excess Soil Management in Ontario
Significant people in history
Lecture 10 PROCUREMENT Ferdinand FASSA.
Web Design and Development
Workshop commissioning Installation Coordination at ESS
Yes, it is for a grade! GET YOUR CHROMEBOOKS!
PUBLIC SCHOOL LAW Part 9: Primary Legal Sources: The Constitution
How to add a website to your class Wiki
Making Web pages (3).
CEM 515 Done by: Abdulkarim Sulais
Computer Information Technology
 Depending on unreliable sources for your cannabis and other products is a thing of the past as you can get weed online through.
Presentation transcript:

An Architects View Non Structural Seismic Design HISTORY, STANDARDS & PAST PRACTISE EDUCATION FOR ARCHITECTS PROCUREMENT TODAY NEW PROJECT WITH STRUCTEX

The BRANZ Non-structural Elements seminar The seminar aim was to raise awareness of issues arising from the design and installation of non-structural elements such as: suspended ceilings above-ceiling services partitions curtain walls and the like.   The seminar was in response to issues raised regarding the performance of non- structural elements in the Canterbury and Seddon earthquakes such as: lack of coordination between disciplines lack of checking on site that non-structural elements are being installed correctly complexity and misinterpretation in the regulatory requirements lack of focus on seismic performance by architects, engineers and contractors cost-driven tendering – tagging out bracing for cheaper pricing.

 BRANZ resources just released to support seismically resilient design: The BRANZ Seismic Resilience website – an online resource that aims to raise the seismic performance of New Zealand's building stock. Seismically Resilient Non-structural Elements Fact Sheets, click link for PDF file: Compliance and Standards Design Criteria Restraint Systems Seismic Clearance at Penetrations Project Process Suspended Ceilings Both resources, developed with significant industry engagement, aim to raise the seismic resilience of New Zealand's building stock.    Refer also to Jasmax Practice Note 06 Non-Structural Seismic Design