Blanco mirror lift upgrade ACTR #480

Slides:



Advertisements
Similar presentations
Clutch Fundamentals Chapter 69.
Advertisements

1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
Automated Golf Ball Teeing System Mr. Tee - The Automated Golf Buddy Jeremy Woods Mike Seyboth Tim Walker Tomas Krones.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter P. 1 Drive Train Calculations Week 3 Day 1.
Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2005 P. 1 Drive Train Calculations Week 3 Day 1.
Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2004 P. 1 Drive Train Calculations Week 3 Day 1.
Patent/Product Search & Selection Analysis Team Up (Phill – Mark – Josh – Chris – Ed) June 4, 2008.
Engineering Integration of the Double- Double Bend Achromat (DDBA) into the Diamond storage ring Jim Kay Diamond Light Source Low emittance ring 2013 workshop.
Yury Gavrikov 25/03/  I met with two very nice g…oniometers 3 Because we decided to adapt their for a new experiment.
Service Bulletin 161 SUBJECT: Upgrade to current production level UNITS:D27105 DATE CODE RANGE: All units up to date code to be checked ISSUED.
VECTOR DRIVES EASA June 2005 “REACHING NEW HEIGHTS” Dave Ruehle and Bill Colton.
Dakota Humphries (Project Lead) Thomas Impellitteri (Tech Lead) Daryl McGhee II (Design Lead) Keith Rosier (Asset Lead)
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
Manufacturing Engineering Elevator Lift System Operation Copyright © Texas Education Agency, All rights reserved. 1.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
Static Equilibrium; Elasticity and Fracture
Towers. Why worry too much about the tower? Would you put a solar collector in the shade? Wind is the fuel! Remember, 30’ above anything w/in 500’ Measure.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH September 19th 2008 VST Meeting1.
Static Equilibrium; Elasticity and Fracture
P09011 – Object Recognition - 1/9/2009. Functional Decomposition, Simplified by System Connecting Object Method Apparatus Connection Device Object Connection.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
SOUTHERN AFRICAN LARGE TELESCOPE Team Building 22 nd May 2014 Raoul SALT Tracker Upgrade Project.
8am: start testing the corner cube mounts on DX cells.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
Design time and Run time Chris, Andrea, Martina, Henry, Antonio, Ole, Philippe, Hartmut, Anne, Jeff, Felix, Sebastian, Kurt.
Dr Emma Rushforth (originally by Prof Ken Young/ Margret Low)
MECVEL SIGNS THE “SLIDING DOORS” REMAKE: SLIDING DOORS ONLY WITH OUR LINEAR ACTUATORS!
1. 2 Quiz Preparation l Have Quiz sheet ready. l Top Center: QUIZ 2 l Upper Right: »Name (L, F, MI), »Today’s date 8/28/12 »Lab day, time »section number.
LBT Q Engineering and Software Review ENGG Engineering General.
BL 8.2 MIRROR UPGRADE Front End Mirrors (M101) and (M201)
Linear Mechanical Systems Sizing & Estimating Life of a Positioning System.
Attic Lift Team Up Phillip Nichols – Mark Zoller – Chris Jacobs – Ed Fleiss – Josh Marcy June 11, 2008.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH July 23rd 2008 VST Meeting1.
F/8 Repair and recommissioning status and near term forward look Ron Probst, Roberto Tighe 06 Nov 2012.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
F/8 tip-tilt mechanism and handling cart P. Schurter December 2012.
Updates on projects 472, 470, 443, 462, 442, 471, 480, 483, 484 Tim Abbott Changes since 9 July are in blue.
Components of Mechatronic Systems AUE 425 Week 2 Kerem ALTUN October 3, 2016.
Rebuilding a 6 m Dish antenna
Robotics Education & Competition Foundation
Upgrading your Internet Connection
Maunakea Operations and Engineering Workshop
Clutch Fundamentals.
An Introduction to Motivational Interviewing
Financial Planning STEM.
Status and Progress of NSW HUB and Extension
Plan for the installation of the TAMU screen
P07203 Dynamometry Laboratory Infrastructure
Alistair Walker Version 3 December
for the entertainment industry
Chapter 9 Static Equilibrium; Elasticity and Fracture
ACTR #480 - Blanco Mirror Lift Upgrade
PIANC Work Group SMART Rivers 2017
ETS For ACTR 9the April 2015 R.Tighe april 2011 april /04/2015
TRANSPORTATION TUESDAY
Teacher training resource: Robotic Assembly
Factors in spring design Materials Torsional
Units of Chapter 9 The Conditions for Equilibrium
Network Performance Manager
VEXnet User's Guide.
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Connecting Devices Hosts and networks do not normally operate in isolation Connecting devices connect hosts together to make a network or connect networks.
Detailed Design Presentation
Goodman Acquisition Camera
Presentation transcript:

Blanco mirror lift upgrade ACTR #480 Tim Abbott & Patricio Schurter 11 May 2015

Existing drive configuration

Safety factors (for Mayall lift) Before upgrade: After upgrade with 50T actuators:

Upgraded Mayall Drive Not installed

The Mayall experience Duff Norton ball screw lead time was 1 year (2x anticipated). Duff Norton could not do factory load tests. Manufacturing quality questionable. Fouling in ball screws required mods. Tuning of drive was problematic (3 motors) Tilt encoders and limit switches worry us. Safety catchers not done (no space) But it’s done now and works.

AAT design Outside vendor: PM Design Group, Victoria Australia Identified 2 major load cases: Mirror preload Mirror removal/installation Identified 6 concept solutions: Do nothing Existing elevator + cable counterweight (Est. US$410k, 2012) 3x 50T actuators (single motor) ($515k) 3x 50T actuators + “redundant load path device” ($610k) Wire rope winch ($690k) Load cells on mirror cart AAT went with (3) + (6), plus load cell in drive base (didn’t work)

The AAT experience Ball screws from GROB (Germany) Very high quality (“compare WWII bomber vs modern Boeing”) Looked at Duff Norton, decided against them (“hopeless”). Single motor, direct drive Slower, but not enough to matter. Selectable torque – used as safety limiter after drive base load cell “did not work”. 2 brakes on the motor + another on the drive. Cost more than expected Bells and whistles don’t work: Envisaged system to know what is on the elevator & interlock Collision avoidance system doesn’t work Sensing device on trolley doesn’t work. Static load test, 120% load The system did back drive despite claims that it could not

To do next… Intra-NOAO meeting to discuss detailed pros and cons of each design. More conversation with AAT FEA to figure out where bending loads concentrate Port Mayall and AAT existing load and new design calculations to Blanco Establish pertinent Chile and OSHA safety codes Open a conversation with PM Design Group Can we collaborate on a modified design? All assembly & installation done by us. The above require ~2 weeks of Patricio’s time, this month, plus 2 more in June. Then: Tim and Pato go to Oz Visit AAT There is much to learn besides the mirror lift: they have shutter problems too, can look at their dome drive, aluminizing procedures, etc. Visit PM Design Group Negotiate need for PM Design Group engineer to come here? ‘roo hunt, shrimp on barbie, go walkabout in the outback, argue relative merits of Marmite vs Vegemite, “Now this, this is a knife”, whinge, “No worries, mate” etc.