XFEL Cold mass & vacuum vessel non-conformities Detected At saclay

Slides:



Advertisements
Similar presentations
Types and Uses of Fasteners
Advertisements

Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
APPLICATION OF EDMS TO XFEL CRYOMODULE ASSSEMBLY AT CEA Christelle CLOUE - Catherine MADEC.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
LCLS-II FPC Aluminum Waveguide Box Karen Fant with work done by Chris Nantista and Ken Premo 6/24/2015.
Agenda – Basics of cavity integration into CAST Introduction (M Davenport) Information exchange 2016 – Vacuum in cold bore – 2 cavities Cooling RF Cavities.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
INTERFACES MANAGEMENT CRYOMODULES Vincent HENNION SYSTEM ENGINEERING ACTIVITIES.
ESS CRYOMODULE RISKS REGISTER ESS CRYOMODULE COMPONENTS AND CAVITY EXPERTISE Franck PEAUGER14th January 2016.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH HARDWARE PREPARATION FOR XFEL TTC topical workshop.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
1 LUND March 16 th, 2016 ESS ELLIPTICAL CRYOMODULE Vacuum vessel: Ports and sealing, Manufacturing feedback LUND, March 16th, 2016 Unité mixte de recherche.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
Tests on production cryomodules Bob Kephart Sept 30, 2006.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.
Status of E-XFEL Module Assembly at Saclay
Visit to Saclay – XFEL Village
Medium beta cryomodule demonstrator M-ECCTD
Task T HTS Dipole Magnet Design and Construction
Power coupler at DESY & for XFEL
DESY Experiences on Use of Gas overlay during Assemblies
How I Made My Bustier….
S1-G cryomodule assembly status
Definition of work flow for string DESY Example on critical operation
X-FEL linear accelerator
6th srf collaboration lasa 13 June CAVITY interfaces - Vincent Hennion / PIERRE BOSLAND Bonjour, Franck Peauger, Je suis Ingénieur RF.
XFEL Tuner system non-conformities Detected At saclay
The 11T cryo-assembly: summary of design and integration aspects
WP 3 coordination meeting Saclay May 2008
LCLS-II CM Ambient Magnetic Field Management
IMP Cryomodule Assembly and Alignment
IHEP Cryomodule Status
Alignment of Main Linac Cryomodule (MLC)
Cryomodule Assembly Plan
F. Peauger (mainly for CM components)
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL main evolutions between M-ECCTD and serie - Bonjour, Franck Peauger, Je.
Incoming inspection of the cavities at saclay
Identification and marking of ESSI deliverables
Cryomodule Product Breakdown Structure and configuration traceability
XFEL cryomodule production and Reliability improvement
Quality assurance and Quality control organisation
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL SAFETY AND RAMI INPUTS - Franck Peauger OLIVIER KUSTER (INSTALLATION AND.
Magnetic shielding and thermal shielding
SNS PPU Cryomodule Space Frame
CEA: Status of CEA Activities on the SRF cavities and cryomodules
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
10th srf collaboration LASA JUNE CAVITY interfaces - Vincent Hennion
Presentation transcript:

XFEL Cold mass & vacuum vessel non-conformities Detected At saclay 2015 XFEL Cold mass & vacuum vessel non-conformities Detected At saclay WG cryomodule TTC 2015 @ SLAC / Thierry Trublet – CEA Saclay

72 cryomodules have been delivered up until now Introduction In the context of the XFEL project, CEA is in charge of assembling the 100 linac cryomodules 72 cryomodules have been delivered up until now The XM100 will be delivered at the end of April 2016 CEA has contracted with ALSYOM for assembly DESY provides cold mass & vacuum vessels 44 out of 45 delivered by ZANON 32 out of 55 delivered by IHEP XFEL cold mass & vacuum vessel non-conformities detected at Saclay – TTC 2015 @ SLAC

Deliveries Cold mass & vacuum Vessels are delivered separately (the cold mass is not delivered inside the vacuum vessel as planned at the beginning) The hardware and 8K/70K shields are delivered one week before cold mass for preparation XFEL cold mass & vacuum vessel non-conformities detected at Saclay – TTC 2015 @ SLAC

Non-conformities detected at Saclay We have been faced with several types of non-conformity and they are recurrent mainly on hardware, shields and cold mass. The cold mass is a complex manufactured component and requires careful inspection during the fabrication process. Parts were frequently missing on the hardware (true for all parts of the cryomodule) Most of the non-conformities led to additional work at Saclay (repair, rework, replacement). Only 1 cold mass and 1 vacuum vessel were returned for repair to DESY XFEL cold mass & vacuum vessel non-conformities detected at Saclay – TTC 2015 @ SLAC

Main non-Conformities Main non-conformities on cold mass / Vacuum vessel 4K-70K shields / Hardware Picture Main non-Conformities Provider p6 GRP (Gas Return Pipe) bent IHEP Cold mass p7 Diameter of GRP oval or too large IHEP ZANON p8 4K superinsulation eaten by mice p9 Hole for locating pin not deep enough IHEP  p10 4K superinsulation was mounted on right side or left side of the ZANON cold mass ZANON p11 Weld bead prevents assembly of washer and screws for fastening the needle support - Cavity support frame p12 The surface for fitting the big flange was too rough ZANON  p13 Paint and dirt inside threaded holes on several ZANON and IHEP vacuum vessels.  ZANON Vacuum vessel p14 The shape of the 70K was non-conform on several ZANON 70K shields and a few IHEP shields  IHEP p15 8K Coupler Copper braids were too short (IHEP) 70K shield XFEL cold mass & vacuum vessel non-conformities detected at Saclay– TTC 2015 @ SLAC

Main Cold mass non-conformitIES GRP bent GRP (Gas Return Pipe) bent Invar rod & clamps Cavity string The GRP on IHEP cold mass was bent (on 4 CMs) Consequence: the pin on certain cavities is in contact with the invar rod clamp The clamps have been reworked XFEL cold mass & vacuum vessel non-conformities detected at Saclay – TTC 2015 @ SLAC

Main Cold mass non-conformitIES Diameter of GRP oval or too large The GRP diameter on IHEP cold mass was oval (on 2 CMs) Consequence: the mandrels could not be installed in the GRP New modified mandrels have been sent by DESY Mandrels positioned in the GRP The diameter of GRP on ZANON cold mass was too large (on 2 CMs) Consequence: the mandrels cannot be fastened in the GRP Aluminium sheet has been placed between GRP and mandrels End cap clamped in the mandrels and on the vacuum vessel XFEL cold mass & vacuum vessel non-conformities detected at Saclay – TTC 2015 @ SLAC

Main Cold mass non-conformitIES 4K superinsulation eaten by mice on IHEP cold mass (on 2 CMs) The superinsulation has been repaired XFEL cold mass & vacuum vessel non-conformities detected at Saclay – TTC 2015 @ SLAC

Main Cold Mass non-conformitIES Locating pin loose in the posts on IHEP Vacuum vessel (wrong pin hole dimension) Risk: the alignment reference for cavity positioning could change after dismantling/mounting the posts CX015 will be sent back to DESY for repair CX023 will be used as is because 1 in 2 pins is clamped correctly and the locating defect is acceptable XFEL cold mass & vacuum vessel non-conformities detected at Saclay – TTC 2015 @ SLAC

Main Cold mass non-conformitIES 4K superinsulation was mounted on right side or left side of the ZANON cold mass Consequence: 2 different assembly procedures were therefore required (cutting holes for couplers is easier if the superinsulation is mounted and rolled to the coupler side) Hole for coupler coupler 4K superinsulation rolled on coupler side XFEL cold mass & vacuum vessel non-conformities detected at Saclay – TTC 2015 @ SLAC

Main Cold mass non-conformitIES Weld bead prevents assembly of washer and screw for fastening the needle support - Cavity support frame (on ZANON and IHEP cold mass) Solution: the washer is removed or we grind the weld needle support Cavity string hanging via needle bearings Cavity support frame XFEL cold mass & vacuum vessel non-conformities detected at Saclay – TTC 2015 @ SLAC

Main Vacuum Vessel non-conformitIES The surface for fitting the “big flange” was too rough. The marks of the milling tool were visible on at least 4 ZANON vacuum vessels Solution: The surfaces were re-machined by DESY at Saclay XFEL cold mass & vacuum vessel non-conformities detected at Saclay – TTC 2015 @ SLAC

Main Vacuum Vessel non-conformitIES Paint and dirt inside threaded holes on several ZANON and IHEP vacuum vessels. Solution: the threaded holes are re-worked and cleaned by operators Clean room assembly process VS XFEL cryomodule performances – TTC 2015 @ SLAC

70K shields non-conformity The shape of the 70K was non-conform on several ZANON 70K shields and a few IHEP shields Consequence: The 70K interface of the coupler touched the shield when the coupler antenna was moved Solution: the shields were cut to enlarge the passage Before After XFEL cold mass & vacuum vessel non-conformities detected at Saclay – TTC 2015 @ SLAC

Non-conformity on the Hardware 8K Coupler Copper braids were too short (IHEP) Consequence: Copper braids were replaced XFEL cold mass & vacuum vessel non-conformities detected at Saclay– TTC 2015 @ SLAC

Production des cryomodules XFEL - Journées AFF-CSS @ Aussois 2015 Commissariat à l’énergie atomique et aux énergies alternatives Centre de Saclay | 91191 Gif-sur-Yvette Cedex T. +33 (0)1 69 08 xx xx | F. +33 (0)1 69 08 99 89 Etablissement public à caractère industriel et commercial | RCS Paris B 775 685 019 DSM Irfu DIR Production des cryomodules XFEL - Journées AFF-CSS @ Aussois 2015