Poor service performance

Slides:



Advertisements
Similar presentations
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 8 – Worker engagement & communication Version: September 07.
Advertisements

VERS Program Next Steps David Brown. VERS Refresh Project Outline Project Deliverables 1. Research Papers Proposal for Refreshing the VERS Implementation.
The student learning experience Student learning experience Programme design Environment for learning and teaching Equipment and materials for learning.
Designing and Implementing. Approaches Lots of models Based in theories for software development.
CTO Head Of ICT Business & Governance Head of ICT Change Portfolio Lead ICT Architect Head of ICT Corporate Solutions Head of ICT Schools & Business Solutions.
Introduction. What do they have in common? CASA Peer Review California Association of State Auditors (CASA) California Association of State Auditors.
1. Ten Principles of Fair Trading Practice 3 General Principles 1.Consumer Interests and sustainability 2.Freedom of Contract.

Industry Perceptions survey 2014/15 results. Contents sample composition methodology findings areas of improvement actions.
Technical External Management Requirements Technology Complexity Interfaces Reliability / Performance Quality Planning Controlling Funding / Resources.
Digital Credentials File: Are We There Yet? Donna Goestenkors, CPMSM, President June 15, 2016.
1 December 2010 Workers Compensation Claims Management Presented by: Sharon Roxby – Senior Manager, Claims Operations - Workers Compensation & Liability,
Project Failure RYAN BIBBY – PROJECT 5 ASSIGNMENT 2 TASK 1.4.
Development Services Blaby District Council Blaby District The District covers 129km 2 Situated in the East Midlands to the south west of Leicester The.
What is HSE Competence Assurance?
Program Management Office (PMO) Design
HSE Incident Investigation and Corrective Action Procedure
Program Management Office (PMO) Design
Safety Inductions CPNZ Basic Training
EISA ACE Southern Africa Regional Resource Centre
Access Service – National learning network.
mSCOA Project Phase 4: Change Management and Transition
Survey Design Clinic Fall 2016: Wilson-Short Office 143
SAMPLE Implement Performance Improvement Plans
Seminar Aims and Objectives
Planning for a Homeroom Roll-out
A brief update to inform on current actions
Stakeholder Survey Prepared for: Seafish Date: May 2016.
Denial of responsibility. Denial of injury. Denial of the victim.
Cultural Due Diligence
Program Management Office (PMO)
Best Practices for Impact Evaluations in Conflict Areas: CRS in Darfur
Fire Risk Assessments Bedfordshire - Pat-testing-bedford.co.uk
Sample Presentation. Slide 1 Info Slide 2 Info.
CS 351d Human-computer interaction Lecture 01 Introduction
CS 580 Human-computer interaction Lecture 01 Introduction
Meet their needs Key player Least important Show consideration
COMMUNICATION.
دانشکده سرمایه گذار مبانی و مدل
Exams from the 1950s to 2018 in less than 6 months
التحديات الناجمة عن التقانات الحديثة
ريكاوري (بازگشت به حالت اوليه)
فرایند تسهیلگری در مددکاری جامعه ای
The Impact of the Livelihoods Training Project: Findings from the Evaluation Dr Mark Wilding Reader in Social & Public Policy Associate, SHUSU University.
Website Call
Program Management Office (PMO)
Program Management Office (PMO)
التعلم بالإكتشاف المراجع:
Provider expectations of information in a SAR – Safeguarding
Understanding the current Public Sector landscape from an risk management point of view Applying the ethical responsibility to the Triple Bottom-line:
Call : Website: -
Improving Consults and Interdepartmental and Interdisciplinary Communication in the Emergency Department Joshua McHugh, MD, Jessica Leifer, MD, Shannon.
Pupil Health & Well-Being External evaluation
1. Identify the following mixed number.
mSCOA Project Phase 4: Change Management and Transition
Long Term Care in Europe
Unit 4 – Task 2 For this task, you are required to produce a Customer Service Training Guide to be given to all staff working for the “cruise Line”
CS 580 Human-computer interaction Lecture 01 Introduction
President, Discern Consulting
Getting to scale: developing a collaborative, mixed-method approach to space assessment at UW Libraries Jackie Belanger, Maggie Faber, Jenna Nobs University.
C.2.10 Sample Questions.
Copyright. Approaches to Population Health in 2015: A National Survey of Hospitals.
C.2.8 Sample Questions.
Using research to support programme development
C.2.8 Sample Questions.
Building Disaster Planning
 WEBSITE:
 WEBSITE:
Conducting the Assurance Engagement
Management commitment and responsibility Safety accountability of managers Appointment of key safety personnel SMS Implementation Plan Coordination.
Presentation transcript:

Poor service performance Sample Root Cause Analysis Poor service performance Speed Quality Public Service & Engagement Mixed quality applications Low staff morale Process Complexity Inadequate pre-application process Consultation Bottlenecks Poor quality physical environment Poorly designed procedure/ process ‘Over-consultation’ Poor stakeholder communication Fragile Performance Management Paper-based processes Poor Risk Assessment Management Information Poor Website underdeveloped Poor internal info exchange Poor training/ induction Inadequate ICT (UNIFORM) = Key Performance Drivers