HIE-ISOLDE Project Status Report

Slides:



Advertisements
Similar presentations
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Advertisements

June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
HIE-ISOLDE Project: Status Report EXTRA COSTS AND ADDITIONAL RESOURCES CERN, 29 January 2013 Yacine Kadi.
HIE-ISOLDE Project Status Report Y. Kadi for the HIE-ISOLDE Project Team 49th INTC Meeting CERN, 11 February 2015.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
HIE-ISOLDE Project Status Report
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
HIE-ISOLDE Project Status Report Y. Kadi for the HIE-ISOLDE Project Team HIE-ISOLDE Physics Coordination WG Meeting CERN, 16 February 2015.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Krzysztof Radwan, PJAS, TE/VSC/ICM Interlocks, Controls and Monitoring Section HIE-ISOLDE Vacuum Controls INSTALLATION.
TE-CRG Activities D. Delikaris, TE-CRG.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
HIE ISOLDE commissioning of the cryogenic control system installation at CERN. LNL-INFN 22/07/2015 Dr. Marco Pezzetti (CERN )
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
ELENA installation progress F. Butin / ELENA collaboration.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Report Technical Director Storage-Ring-Installation Completed
High energy beam transport.
S1G Experiment Schedule Plan
Roadmap for triplet cryostats
Francois and Lau EATM 17 July 2012
ELENA installation and commissioning status
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Complementary ISTC Projects #3888, 3889p
AD consolidation activities in LS2
on behalf of the RF group
SPS cryogenic proximity equipment and SM18 validation
Update on HW commissioning
Hollow e- lens, Cryogenic aspects
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Renovation of the 45-year old PS magnets
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
Overview & baseline of LS2 and roadmap for CRG
Status of the cryogenic system for B180
HIE-ISOLDE Status Report
UK RFD Pre-Series cryomodule
HIE-ISOLDE Project: Planning & Resources
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
HIE-LINAC status report
HIE-ISOLDE Project: Status Report
Report on HIE-ISOLDE Status
CERN’s MidTermPlan and the consequences for HIE-ISOLDE
Cryomodule Assembly Plan
Prototype cryomodule development
Ciprian Plostinar Workshop on Testing and Commissioning
Daresbury ESS In-Kind Contributions
Overall time schedule of SRF activities
as a prototype for Super c-tau factory
A. Herlert, CERN PH-SME-IS
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
Accelerator Installation Schedule
SNS-PPU upgrades the existing accelerator structure
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

HIE-ISOLDE Project Status Report Y. Kadi for the HIE-ISOLDE Project Team 46th Meeting of the INTC CERN, 12-13 February 2014 Technical Advances Procurement Installation works Schedule Conclusions

High beta cavity procurement Version 2 Two series cavities (QP2 and QP3) produced at CERN have been coated Delivery of first 2 pre-series units from industry (Research Instruments) before the end of the year now expected by mid-March The rest of the batch should arrive as initially foreseen All of the series inner conductors already pre-machined => No major impact on schedule. 6 weeks until next cavities arrive to be used to understand frequency shift observed on QP2 and QP3 and to strip and re-coat QP3.

Performance of Series Cavities => QP3 Cavity will be re-sputtered

Superconducting Solenoid Design was revised in June to cope with differential thermal contractions during cool down transients Final Design Report approved Test bench ready First 2 units assembled and ready for training and tests First solenoid delivery foreseen end February beginning of March 2014 Second end March 2014

Cryomodule assembly Procurement of leading items completed (Vacuum vessel, He vessel, Thermal shield and cavity/solenoid support frame): delivery expected by mid-July 2014. Thermal shield: lack of response from industry => will be in-sourced at CERN. New sets of 4 Support adjusters ordered through CATE. Rest of CM sub-assemblies and small components will be produced via CERN Central Workshop (EN/MME). Procurement of CM assembly tooling now on critical path. CM design team has been re-inforced to accelerate procurement (2 additional designers + 1 Safety engineer)

CM Assembly Planning Start of assembly in clean-room Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 CM Long-lead Item wk1 wk2 wk3 wk4 Vacuum vessel   Thermal shield panels Helium vessel Cavity/solenoid Frame Assy tooling item Railing system Delivered/installed 2013 Lifting Frame Cavities/solenoid Chariot Multi function Chariot Ancillary tooling Design/manufacture depending on needs Conceptual Design Build-to-Print Drawing File Tech.spec + drwg folder Price Enquiry Evaluation/adjudication proposal Place order Manufacture Reception/Delivery Commisioning/Installation Start of assembly in clean-room

Technical Advances SC Linac High-Energy Beam Transfer lines Cavity series production started RF coupler and tuner systems are being validated LLRF prototype successfully tested => series production underway SC solenoid design approved=> fabrication starting Cryomodule design finalized => procurement underway for long-lead items High-Energy Beam Transfer lines Layout frozen => tracing on the floor Dipole and quadrupole Magnets + supports ordered H/V corrector magnets by end of November vacuum chambers design to be finalized soon Diagnostic boxes under procurement Design Study for the Intensity Upgrade well underway Target + Front-end (FE8 and 9) Offline separator test bench HVAC + Cooling => nuclearization Charge Breeder => assembly of electron gun, test at BNL (US) HIE-ISOLDE Workshop: TheTechnical Aspectshttps://indico.cern.ch/event/255042/

Safety Issues Recommendation from IAP from 11th of April 2013: “A review on the safety aspects of ODH (Oxygen Deficiency Hazard) is planned and the committee also recommends it” The Safety Review took place the 5th of November 2013 Covers ODH as well all the other Safety Aspects of the project Internal Reviewers: CERN Safety expert, TE-CRG Cryogenic Operation for Accelerators, Chairman BE-OP-PS Operation External Reviewers: INFN Legnaro, TRIUMF Canada

Cryogenic Hazard Safety devices of the Insulation Vacuum Vessel placed at the bottom of the cryomodule due to space constraint on cryomodule top plate Safety issue for the access during steady state Acknowledgment : Y.Leclercq All Safety devices (for LHe tank and Insulation Vacuum Vessel)  now routed outside the tunnel  No safety issue Space between CM and tunnel roof to impact on pipe routing and possibly roof girder position

HIE ISOLDE installation works

Status Bldg 198 & 199 Building 198, Compressor building: EL power cable trays and cabling done, power connections ongoing CV Electrical cabinets installed, connecting of power and instrumentation ongoing Air ducts and diffusers installation done Pumps all installed and connection instrumentation ongoing Tubing inside B198 largely done Ventilator openings in roof to be done Installation and piping of refurbished compressors as of end February followed by electrical cabling in March Building 199, Cold Box building: All openings in walls between the different buildings for EL , CV and Cryo done Ventilation units all in place and adjusted with regard to unequal floor surface. Connections water and air ducts done Air ducts inside B199 largely done EL power cable trays installed, cabling ongoing RF room closed (sandwich panels in place) New power transformer installed outside B199, connections ongoing

Status Bldg 170 Hall 170: Tunnel walls done and last level of concrete blocks installed. Few missing blocks at end shielding to be installed week 27 Jan and removal of spare blocks Special size blocks for shielding door to arrive week 27 Jan Chariot shielding door installed end Dec., wall adjusted for free running of the door Installation of air ducts and diffusers along the walls done. Missing small connecting part to B199 Installation EL power cable trays ongoing: Inter connecting power room B197 and new B199 along Saleve wall and under ventilation room(B170) ongoing – to finish start next week Retracing and verification of the linac and HEBT elements done this week Rack platform ready for cable tray installation – to be in place end March Metal carrying structures for roof ventilators in place. Opening roof foreseen next week (VIC 27 Jan) Metal covers for lateral trench to be cut to correct size Drawing and drilling HEBT supports holes (with templates) in Feb (1 day) in coordination with other floor work Installation of HEBT supports March/beginning April in coordination with other floor work Priorities metal structures: Metal structure holding HEBT cable trays from platform into hall (design ready to be validated) – installation mid Feb – mid March with trays Metal structure in tunnel (design to validate) – installation beginning March + 2 wks Metal structure jumper boxes between tunnel and B199 (design to finish & validate) – installation beginning March + 2 wks Metal structure / beams under RF racks (AYPA) to be in place end Feb

Hall 170

Status Bldg 197 Building 197: All new pumps in place, electrical connections ongoing Target cooling water station to be connected Tubing between the different water stations largely done (inside B197, outside B170 and into B198) Aiming for deadline 15 March to have station ready for the ISOLDE facility low energy part cold-check and run Key dates water: 31st March for the ISOLDE hall (including separator magnets) 7th April for the target cooling water (the small separate station) 26th to 30th May for the BTY line   B197 1st floor: HT power room: Reservation for the HT cable to connect B197 to the new HIE Isolde power installation in B199 done EL HT cabling along B170 roof to newly installed HIE ISOLDE transformer at B199 ongoing

HIE Simplified Planning End LS1:Start Low E physics July 2014 HIE physics at 5.5MeV/u October 2015 Start Isolde shutdown 17 dec 2012 We are here: Feb 2014 2011 2012 2013 2014 2015 2016 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Civil HEBT Cryo Civil hall Main services RF Ventilation Demi water 5.5MeV/u CM 1&2 Electrical syst.s Cabling Timeline: sd sd LS1 sd sd Beam commissioning 3 months 17 Dec 2012 - Q3 2014 shutdown Isolde Ops HIE installations and tests (Isolde normal operations) Machine Check-Out (Isolde normal operations) Beam Commissioning (Isolde normal operations)

HIE-ISOLDE Operation 2015

Conclusions (1/2) Technical Activities: progress is tangible on most of the machine parts => however one has to carefully monitor the following items: Procurement of CM parts and instrumentation Tooling for clean room assembly Cryogenics for SM18 test Installation Works: High activity in the hall and service buildings; Despite delays we are still in line with the overall schedule which aims for low energy physics during 2014 and HIE physics as of Oct 2015. Critical paths for some activities are being addressed (cryogenics & cryomodule installation) Next meetings: ATSMB on March 24th Physics Coordination board + HIE-SC on April 1st HIE International Advisory Panel April 8-9

Conclusions (2/2) Budget and Resources: Planning: Financial situation analysed in-depth: 5.8 MCHF shortfall for the completion of Phase 1 (5.5 MeV/u) 8.6 MCHF shortfall in total up to Phase 2 (10 MeV/u) 13.8 MCHF shortfall including Phase 3 (10 MeV/u + Low-Beta) Decision to allocate extra budget by CERN-DG to be endorsed in MTP2014 (June) Additional resources have been allocated: V. Mertens (TE) project monitoring and F. Formentti (TE) technical coordination P. Santos Silva (DG-HSE) risk management plan B. Leida (EN/MEF) planning and installation coordination 2 additional draughtsmen + 1 safety engineer (TE/MSC) Planning: Baseline Planning should be ready by end of February and presented at AT sector meeting on March 24th