Preproduction Status & Results

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
November 17, 2004Tracker1 Tracker MRB Wire Bond Encapsulation from MCM to SSD R.P. Johnson U.C. Santa Cruz.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 1 RESULTS OF 1 st RUN PITCH ADAPTER TEST FIXTURE Peter Amnuaypayoat
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
MRB on SLAC NCR 226 MCM Encapsulation Delamination R.P. Johnson January 3, 2005.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
Status and outlook of the Medipix3 TSV project
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Robert P. Johnson 1 GLAST Large Area Telescope: Silicon-Strip Tracker/Converter.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 8 NCRs were generated during TMCM preproduction NCR #00029, CLOSED.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
MRB on SLAC NCR 226 Excess of Disconnected MCM Channels R.P. Johnson November 9, 2004.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
Status of the Planar Edgeless Silicon Detectors Gennaro Ruggiero TOTEM Collaboration Meeting 09/11/2005.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
G. Ruggiero / TOTEM 1 Si Edgeless Detectors in the RPs Edgeless detector (on the old “AP25 module”) active edges (“planar/3D”) planar tech. with CTS (Current.
Conformal Coat Quality issues Update of November 3, 2004.
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
Tracker Timing Margin MRB R.P. Johnson U.C. Santa Cruz October 15, 2004.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
Procedure for MCM rework on tray MID 070
GLAST Large Area Telescope:
Mini-Tower test results
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
THEMIS INSTRUMENT SUITE
We have no new trays for tower 4!!
Investigation on tray MID 063 Back
GLAST Large Area Telescope:
GLAST Large Area Telescope:
FNAL Production Experience
Hybrid & Module Testing Status
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Results from module testing
Module Failures on RODs
GLAST Large Area Telescope:
University of California Los Angeles
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
Sensor probing (Summary)
US Hybrid/Module/Rod Testing Model
Mechanical/Thermal Systems
Encapsulation Studies
The encapsulation problem of the LAT heavy trays
GLAST Large Area Telescope:
US Module Testing Progress Report
GLAST Large Area Telescope
Production Status 39 modules produced
GLAST Large Area Telescope:
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Presentation transcript:

Preproduction Status & Results Qty. 4 completed thermal cycle, burn-in and final electrical test, Sent to SLAC Qty. 10 completed thermal cycle, burn-in and final electrical test, Sent to INFN Qty. 14 thermal cycle complete, burn-in and final electrical test (ECD 2/12/04) Qty. 6 pre-encap electrical test (ship to SLAC ECD 2/13/04) Qty. 3 wire bonding (ECD 2-13-04) Qty. 4 “Short” TMCM, install pitch adaptor & SMT parts (ECD 2/20/04) Qty. 2 samples of Pitch Adaptor sent to INFN Qty. 4 Scrap Qty. 40 short TMCM Qty. 10 tall TMCM Qty. 50 preproduction total Qty. 10 “Tall TMCM” (ECD 2/24/04) +2 spare parts on hand

Pre-Encapsulation Test Results Example Pre-Encapsulation Test Session Results from the most recent test session at Teledyne, SN 173, 359, 509, 516, 523, 524, 562, 571, 576, 578, 584, 593. SN 523: One GTFE chip had a broken calibration mask and drew excess current. It was the only chip out of 312 that had to be replaced. SN 516: One wire bond lifted on a GTFE address line. Shorts cleared on the pitch adapter between two pairs of channels. SN 516 Passed the electrical test, but with 2 shorted channels. Inspection of that region uncovered damaged wire bonds that had to be repaired. SN 509 Passed the electrical test, but with 2 shorted channels. Debris could be seen between the two traces and was cleaned out. These 4 were reworked and tested perfect the following day. The other 8 were perfect in the initial test.

Failed ASICs The incidence of ASIC failure, requiring reworking of MCMs, is low enough that we can live with it, but… All chips were fully tested on the wafer before dicing, so in principle we should not find any failures. Damage during lapping, dicing, picking, inspection? Damage during MCM assembly? We are starting a program to isolate the problem by probing Failed dice returned from Teledyne. Fresh dice from GDSI. New vacuum fixture to be used for probe testing loose GTFE chips.

Preproduction Electrical Results So far, no MCMs have failed at Post encapsulation/conformal coat test at Teledyne. 3-temperature test following thermal cycling at SLAC. Burn-in. Final test after burn-in. In fact, the number of bad channels has not increased at any of those test points with respect to the pre-encapsulation test. Of 4 MCMs checked so far by probing, none has even a single broken trace or wire bond at the channel inputs. Note that we have yet not seen any chips go bad on MCMs following encapsulation and final test, in the Mini-Tower or preproduction. This is evidence that the chips are robust when protected from physical damage and that the ASIC failures seen during pre-encapsulation testing are not results of infant mortality.

Measures on MCM Board B-B’ C-C’ A-A’

Planarity on MCM Board P5 P4 P3 P2 P1

Planarity of the Strips 100um 200um A0 A2 A3 A4 A5

Conclusions The MCM assembly procedure is able to deliver boards that meet all electrical requirements, generally with much less than the maximum of 8 bad channels per MCM. Some rework is required after wire bonding and before encapsulation. The incidence of bad dice is low and seems to be decreasing. We will do some work to understand whether chips are damaged during lapping, dicing, picking, and inspection at GDSI. The largest amount of rework results from physical damage to wire bonds during handling. New fixtures will be made to reduce this. The finished MCMs conform to the designed height and straightness of the top edge, where G&A will wire bond. The perpendicularity of the top edge may be improved with a new fixture, but G&A is confident that it is adequate for good quality wire bonds to the SSDs (but possibly at a cost in wire bonding time).