Boris Deriy, APS Electrical Safety Committee Chair

Slides:



Advertisements
Similar presentations
Subcontractor Electrical Safety & NFPA 70E
Advertisements

LIMITED APPROACH BOUNDARY
Murray State University
Richard (Rick) Elwell Senior Operations and Safety Instructor and Consultant
 ELECTRICAL SAFETY Gerald P. Robinson Jr., P.E. – Hatch Mott MacDonald.
Two-mode Safety and Battery System Service
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
San Bernard Electric Cooperative, Inc. Arc Flash Assessment.
ELECTRICAL SAFETY / E N V I R O N H & S T R A I N I N G P R O G R A M ELECTRICAL SAFETY OSHA requires that electrical equipment be approved for use and.
ARC FLASH ANALYSIS.
Construction Training
1 OFFICE ELECTRICAL SAFETY Environmental Energy Technologies Division (EETD) On the Job Training August 12, 2013.
Electrical Safety ANR Building, Davis Staff Meeting February, 2015.
Presented by Environmental Health and Safety
1 – Electrical Hazard Recognition EFCOG Electrical Safety Subgroup May 2015 Electrical Safety Month 2015.
Electrical Safety Training
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
THE INTERNATIONAL SOCIETY OF FIRE SERVICE INSTRUCTORS Electronic INSTRUCT-O-GRAM Program Lockout / Tagout Policy.
Utilizing Only Qualified Persons for Electrical Work can Reduce Risk Presented by: Dennis K. Neitzel, CPE Director Emeritus AVO Training Institute, Inc.
“Standard for Electrical Safety in the Workplace”
Qualified Persons Working On Or Near Energized Equipment
An Introduction to Mersen Electrical Services Putting electrical safety to work.
© Business & Legal Reports, Inc Alabama Retail is committed to partnering with our members to create and keep safe workplaces. Be sure to check out.
Electrical Safety.
Hazard Identification at Home. Ground Fault Circuit Interrupters (GFCI’s)  GFCI’s provide protection by turning off the power before a shock occurs 
Lock-Out / Tag-Out Types of Energy Types of Energy Electrical Electrical Mechanical Mechanical Chemical Chemical Thermal Thermal Hydraulic Hydraulic.
© Evaluating Electrical Risk Factors Module 3.
All Colby employees work with and around electricity on a daily basis. This Safety Talk focuses on the basic electrical safety elements to protect you.
Electrical Safety in Construction. Objectives In this course, we will discuss the following: Common electrical hazards Standards relating to those hazards.
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Electrical Safety and Electrical Safe Work Practices EHS Course #525 Reference EHS Electrical Safety Procedure
Electrical Safety, Subpart K
Linda Bagby - SBN Program Electrical Coordinator T600 Installation 8 February 2016 SBN Program Operational Readiness Clearance.
MNM Fatal Electrical Electrical November 18, 2013 (Kentucky) November 18, 2013 (Kentucky) Crushed Stone Mine Crushed Stone Mine Contract Electrician.
Oregon OSHA Grant # NFPA 70E - How to Comply with OSHA’s Electrical Standards NECA-IBEW Electrical Training Center’s Free Online Course This.
Timing (minutes) Learning ObjectiveMain tasks / ProcessResources / tools 5TitleStandard Operating Procedures for Power Press Machine Slide 1 5Index 
Chicago Area Facilities (CAF) Electrical Safety Program.
Working On or Near Energized Conductors and FR Clothing.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Chapter 3 PHYSICAL INJURY AND CONTROLS 3.2 Electrical Safety
Training of Airport Visual Aids Maintenance Personnel “Airport Operator” - Are you Meeting the Requirements? IESALC Denver 2015 Presented by Seward Ford.
Chicago Area Facilities (CAF) Electrical Safety Program.
Electrical Safety OSHE 382, Spring 2016
What is Arc Flash? Electrical arc flash and arc blasts release dangerous levels of heat energy, fire , molten materials, vaporized solids that can be inhaled,
Lock Out / Tag Out The Control of Hazardous Energy
Managing Safe Work Permits
“Success in Safety”.
Electrical.
LCLS-II CRYOPLANT CONTROLS HARDWARE FINAL DESIGN REVIEW
Photovoltaic Systems Engineering Session 19
Electrical Safety Equipment
General Information for Electrical Installations
Personal Protective Equipment
OSHA’s Final Rule: Electric Power Generation, Transmission, and Distribution Electrical Protective Equipment Presented to: RESAP Area Administrators Presented.
Outlet Branch Circuit Arc Fault Circuit Interrupter (OBC AFCI)
Murray State University
Developing a Comprehensive Electrical Program
Photovoltaic Systems Engineering Session 12
ECMA-287 Safety of Electronic Equipment Safeguards to reduce harmful exposure to energy sources Ecma TC12 Rue du Rhône CH-1204 Geneva - T: +41.
Safety Meeting Topics Standby Generator Safety
Presented by Environmental Health and Safety
Click anywhere to get started…
Ian Evans SSRL Safety Office
DOE Review of the LCLS Project October 2006
Electrical Hazards By Kory Hildebrand.
LOCKOUT/TAGOUT By: Kory Hildebrand.
Presentation transcript:

Integrated Safety Management and Electrical Equipment Inspection at the APS June 14, 2010 Boris Deriy, APS Electrical Safety Committee Chair Ju Wang, Power Systems Group Leader

Why has Argonne adopted ISM? Argonne's Integrated Safety Management (ISM) program Formal approach to integrate safety into all aspects of the work process in the Lab Why has Argonne adopted ISM? ISM program provides an organized process for people to plan, perform, assess and improve the safe conduct of work at all levels. DOE mandates ISM within our prime contract ISM provides a framework for compliance with other regulatory requirements ISM based on seven principles and five core functions B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 2 9/16/2018 Go to ”Insert (View) | Header and Footer" to add your organization, sponsor, meeting name here; then, click "Apply to All"

Seven ISM Principles 9/16/2018 B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

Five ISM Core Functions Everyone assigned for a job has to ask himself B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018 Go to ”Insert (View) | Header and Footer" to add your organization, sponsor, meeting name here; then, click "Apply to All"

Analyzing Hazards Example (Booster Magnet PS) Arc Flash Calculation, Stored Energy Warning This is an example of how ISM works based on LOTO Procedure for Booster Dipole. Every piece of equipment at the APS is provided with a label containing information based on Arc Flash Calculations -- what hazards present, the Arc Flash Boundaries, PPE required... B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

Implementing Controls Example (Booster Magnet PS) Warning Signs, Panel Meters, Power Alert UAP-100, LOTO Procedure B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

An Example of Clear Roles and Responsibilities (Test&Measurement Authorization Form) Division Director Responsibilities Appoints qualified electrical workers Approves conversion of task-specific one-time-use to extended-duration T&M Authorizations Group Leader Responsibilities (For CATs: CAT Director ) Assures that the energized test & measurements can be justified Assures that the work can be done safely and that persons listed are authorized and qualified to perform the work. ESH Coordinator Responsibilities Assures that the proper safety approval process has been followed. APS Electrical Safety Committee Member Responsibilities Approves and/or performs the hazard analysis. Approves and/or defines PPE and safe working practices for the task to be performed. Self-certifies that they are qualified to address electrical safety issues with the work for which the authorization is requested. Authorized Worker Responsibilities Participates in pre-job briefing Complies with criteria on the T&M Authorization. Understands the safety envelope of work before starting, and stops work if conditions change beyond the original scope or safety envelope. Performs work according to established APS safe working practices. B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

Unlisted electrical equipment approval program at the APS By 2005, two independent safety issues obviously grew up: For almost 15 years of operation APS accumulated hundreds of pieces of equipment facing aging and obsolescence. Some of them did not match with newer standard safety requirements. With extensive growing of users’ programs, the APS beamlines became flooded with non-standard equipment brought by users for experiments. There was no trained personnel at beamlines to help users to set up non-APS equipment which compromised safe operation. OSHA requires that electrical equipment must either be listed by an NRTL, or approved by the local AHJ. To meet these requirements ANL initiated an unlisted electrical equipment approval program performed by Designated Electrical Equipment Inspectors (DEEI). B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

DEEI Program – Why we needed it An example of equipment brought to APS by a user for a beamline experiment B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

DEEI Program – Why we needed it Same equipment -- modified, inspected and allowed for experiment B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

Designated Electrical Equipment Inspectors (DEEI) Training Program The training program was initiated in 2005. Now we have more than 90 inspectors trained (33 at the APS) Program included: Approval by UL Hazard Classification Unlisted Equipment Approval Administrative Controls Lessons Learned Practical Electrical Safety including Argonne Tour NFPA 70E for R&D Review of Electrical Basics Codes and Standards NEC Code Violations DOE Handbook Managing Electrical Hazards NRTL by OSHA B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

All other electrical equipment requires inspection and inventorying What Needs Inspection? Equipment not needing inspection, one or more of the following: NRTL listed, not modified, and used per mfgr’s instructions Equipment considered non-hazardous Prototype (i.e. equipment under construction) equipment for < 3 months Equipment not being used All other electrical equipment requires inspection and inventorying B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

Argonne Recognized Reputable Manufacturers (8/31/2009) allows to perform “light” inspection B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

Guidelines for Equipment Approval Suitability for installation and Grounding Some potential considerations of suitability for installation and use are as follows: Operation, considering environmental conditions Temperature, humidity, air pressure, radiation, outdoor/indoor, etc. Normal and abnormal use, considering duty cycle, average and peak power, etc. Properly sized and installed equipment grounding (chassis grounding) Equipment design that includes consideration of the available short circuit and ground fault current Properly sized and installed over-current protection (fuses or circuit breakers) Separation of high- and low-voltage components, especially where high voltage could escape along a hidden fault path B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

Guidelines for Equipment Approval Mechanical strength and Preventing from Arc Flash Mechanical strength and durability considerations : Enclosure should: Prevent damage to internal components during use and transportation Contain arching, heating, and explosion Prevent injury to personnel from hazardous energized parts Prevent damage to internal components from environmental conditions Workmanship—unused openings effectively closed Integrity of electrical equipment and connections Any item that would adversely affect the safe operation or mechanical strength of the equipment, such as damaged, corroded, or overheated parts B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

Guidelines for Equipment Approval Wiring and Insulation Wire bending and connection space includes the consideration of assembly and potential repair : The protection of conductors and their insulation against damage by over-bending, over crowding, location near moving parts in equipment, and at termination points. The integrity of insulation ensures that the system: Prevents the escape/transfer of electrical energy to other conductors and to personnel; Is free from short circuits or potential short circuits; Uses listed conductors where possible; and Is free from grounds other than those required or permitted by National Electrical Code. B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

Guidelines for Equipment Approval Other factors contributing to the practical safeguarding of personnel • Reviewing non-electrical hazards (X-rays, UV and IR, RF fields, excessive noise ). • Preventing electric shock, burn, or reflex hazards by eliminating personnel contact with live parts of equipment operating at 50 volts or more. • Establishing a procedure of energy removal, e.g., disconnection, LOTO, removal of stored energy, for both normal/emergency shutdown. • Use listed or recognized components where possible. Consider the loss of electrical power, automatic removal of stored energy, the use of interlocks on enclosures and other systems. B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

Unlisted Electrical Equipment Approval Form B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

Purchased Equipment should be listed by an NRTL (Nationally Recognized Testing Laboratory) The following are the NRTLs for electrical equipment recognized by OSHA B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

Approval and Rejection Labels B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

Electrical Equipment Inspection Discoveries One fuse per 6 supplies Abandoned live wire Spliced Ground Wire Cracked Insulation B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

Lab-wide Unlisted Electrical Equipment Database B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

APS Electrical Equipment Inspection Status B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018

Questions? B.Deriy, J.Wang, 2nd Workshop on POCPA, June 14-17, 2010 9/16/2018