GIS Portal Racks Project

Slides:



Advertisements
Similar presentations
Intervention Priority Management This talk will show the CERN priority list, the corresponding check list and the tools used by operators to diagnose a.
Advertisements

Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ITEC224 Database Programming
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
Barriere O, Le Roux P
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
E. Calvo (BE/BI-QP) 12/10/2015 LHC BI fibre infrastructure.
Review of the processes released in the framework of the MMP Goran Perinić.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
July 2014, TE-CRG-MLEDMS Naming Key Issues – List of Naming conventions in use QAC Naming Conventions Sub-committee Meeting n.2 S. Knoops QAC TE(-CRG)
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Electrial Safety LS2 days November 2016 AP
Survey on “Chargés de Consignation” Status Update
V4.
YETS & LS2 Works EN-EL / Power distribution
An introduction to Infor EAM at CERN
ABT-EC EYETS Activities 2nd reports
East Area Renovation Project Team meeting # 2 – EDMS News
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Update on the Critical Path of the PS Booster Schedule for the EYETS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
ARIES WP 6 / Task September 2017
Vacuum Controls Quality Management
YETS & LS2 Works EN-El on LHC / Power distribution
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
Identification of the unused cables
TuNGSTEN E-INVOICE SUBMISSION GUIDE.
Forecasts for waste and radioactive material storage
EYETS LHC 2016/2017 Works EN/EL/CF
Infor Reporting Options and Pentaho
LIU – EVM status and next steps
Configuration Management and Layout Database ELENA Project
EC Activities Status for the LIU
YETS & LS2 Reminder G. Girardot 20 juin 2017.
EN 4946 – Refurbishment of Electrical Substations
Layout Drawings and Mechanical Assembly Drawings
n_TOF “Draft” plans for YETS and LS2
Georgia Gkioka TE-VSC-ICM National Technical University of Athens
Hollow e- lens, Cryogenic aspects
The MTF adjusted system to meet Vacuum Group needs
J. Uythoven for the MPE-MI & MS Teams
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
the CERN Electrical network protection system
Survey on “Chargés de Consignation” Follow-up
SPS East Extraction bump inhibit during COLDEX operation
SPS activities during LS2 TE-EPC (Power Converter Group)
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
Software Developer for Vacuum Control System (BE3528)
YETS PS + PS SWY + TT2 Facility Coordinator:
YETS & LS2 Works EN-EL / Power distribution
AMMS-WG BE-BI and PPE 9/12/2018.
EP Experiments safety validation process Safety Permits
East Hall under construction
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Vers PS YETS PS Booster David HAY & Cyrille BEDEL.
Robert Gomez-Reino Garrido
TEST PLANS for HL LHC IT STRING
Case management as logbook for the cryogenic installations at CERN
Experimental Areas – LS2 planning
Implementation of RP training ranks in SPS and NA_target
LS3 Study & Readiness Meetings
Rack and Interconnect Design in E-plan
Presentation transcript:

GIS Portal Racks Project Olivier Barrière BE-CO-IN BE-BI TC February 22th, 2018

Outline Purpose Scope Missing features Links with other CERN entities Next project (BE-CO Hardware Data Management) Summary Demo February 22th, 2018 BE-BI TC

Purpose Provide a global & common infrastructure to all Equipment Groups (EG) for: Locating the equipment Finding the corresponding documentation (Infor-EAM, EDMS,MTF) Finding links to databases (Layout, CCDB, IT Network, Power converter, etc..) Finding IT Outlets in racks Integrate tunnel view Finding power distribution in racks Finding cable racks => Reduce piquet intervention time for intervening in accelerators => Share information from different services for exploitation & installation February 22th, 2018 BE-BI TC

BE-CO Scope Phase 1 - data integration (2013-2018/Q2) 2013-2016 Racks for accelerator sector for PS, LHC U & S, SPS 2016-2018 Racks for Prévessin & Meyrin site, SM18, IT Star Points, North area… Phase 2 - Data validation (2017-2018/Q2) Validate racks Groups responsible for SPS & PS complex Maintain data up-to-date Put in place automatic repports between databases If a responsible change unit or leave CERN If a new rack is installed If a rack is removed February 22th, 2018 BE-BI TC

Accelerator sector Scope Phase 3 - (2018/Q3…) Maintain data up-to-date A decision has to be made by the management, to decide who will be in charge of the maintenance Missing features (Electrical distribution, common exploitation cable DB) A working group, composed by BE-CO, BE-OP, EN-ACE, is writing a document to describe: The current situation in terms of use cases. The needs The impact of not having such data available today in terms of cost (intervention time => impact on operation) The cost of implementation and keeping this data up-to-date for operation and installation By the end of March this document will be presented to the sector hierarchy to ensure: The situation and potential impact is understood To take into account priorities to work on this topics February 22th, 2018 BE-BI TC

Racks & power distribution Missing feature 1 - GIS Links between: Racks & power distribution Rack power distribution for exploitation & installation From where racks are powered Visualise which racks are impacted by a power cut => Validate if a device is powered Which network is distributed February 22th, 2018 BE-BI TC

Cable DB for exploitation Missing feature 2 - GIS Common cable DB for exploitation including: GESMAR, CCDB, etc… To avoid double check in CCDB & GESMAR…, each time users need to find a cable Add a search in GIS Portal Racks to visualise the cable extremities Cable DB for exploitation February 22th, 2018 BE-BI TC

Missing feature 2 Cable search in GIS Search by cable 25812 February 22th, 2018 BE-BI TC

Links with other CERN entities "Demande d’installation de rack" Equipment groups DB Layout DB EN/EL Cablothèque Gesmar TO BE DONE CCDB Diamon TO BE DONE BE-CO BE-CO InforEAM SMB/ACE Layout core tables NETWORK DB IT-CS Update LAYOUT_ID or create new rack Not yet automatic Combine with already existing layout data IT sockets in racks Sync to Layout on demand TE/CRG EN/CV SMB/ACE … GIS DB SMB/SE/DOP Match GIS Shapes with Layout data using Labels & LAYOUT_ID Automatic since April 2014 Provide rack data to GIS RACK IMPORTS Staging table GIS info Panel View Import API running daily or on demand 20 Nov 2015 9 February 22th, 2018 BE-BI TC

Links with other CERN entities Group DB BE-CO LAYOUT CCDB (FEC’s & Cables) DIAMON EN-EL GESMAR EN-ACE Infor-EAM EDMS MTF IT-CS Network SMB-SE GIS TE-EPC Power Converters Clients BE-ABP EN-ACE TE-ABT IT-CF HSE-CN BE-BI EN-CV TE-CRG IT-CM HSE-RP BE-CO EN-EA TE-EPC IT-CS EP-CMD BE-ICS EN-EL TE-MSC EP-DT BE-OP EN-HE TE-VSC SMB-SE BE-RF EN-MME EN-STI EN-SMM February 22th, 2018 BE-BI TC

Next project BE-CO Hardware Data Management Racks & cable Layout purpose Replace manual drawings by automatic ones One source of data to maintain up-to-date Status Manage data in Layout DB Give an equipment code for all material: crates, cards, patches… Define all connections of each equipment: connector numbers & types Define cable connections between connectors February 22th, 2018 BE-BI TC

Next project purpose 1: Fill Racks Layout 2018/Q2 February 22th, 2018 BE-BI TC

Next project purpose 2: Automatic Cables Layout 2018/Q4 Replace manual drawings by automatic ones For all BE-CO systems: MTG, Timing, white rabbit, buses, external conditions… Manage data in Layout DB => Generate automatic logical schematics => Display data in GIS Portal Racks February 22th, 2018 BE-BI TC

Next project purpose 3 Display data in GIS Portal Racks (2019) Replace manual drawings by automatic ones February 22th, 2018 BE-BI TC

Summary GIS phase 1 - Data integration (2013-2018/Q2) Rack integration for accelerator sector, machines, test benches, star points… GIS phase 2 - Data validation (2017-2018/Q2) Racks Groups responsible validation for SPS & PS complex Put in place automatic reports between databases Gis Phase 3 - Maintain data up-to-date (2018…) A decision has to be made by the management, to decide who will be in charge of the maintenance GIS Missing features 1 & 2 - Rack power distribution & common cable DB for exploitation By the end of March, a document will be presented to the sector hierarchy to ensure: The situation and potential impact is understood To take into account priorities to work on this topics Next project - BE-CO Hardware Data Management Fill racks layout (2018/Q2) Manage cabling data in Layout DB (2018/Q4) => Generate automatic logical schematics Display data in GIS Portal Racks (2019) February 22th, 2018 BE-BI TC

Demo https://home.cern/ http://smb-dep.web.cern.ch/en/content/isp https://gis.cern.ch/gisportal/Racks.htm February 22th, 2018 BE-BI TC