Update of CLIC accelerating structure design

Slides:



Advertisements
Similar presentations
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
Advertisements

Choke-mode Damped X-band Structure for CLIC Main Linac Hao ZHA, Jiaru SHI CERN Sep 27, 2011 Jiaru Shi, LCWS11 Workshop, Granada1.
Jiaru Shi(Department of Engineering Physics, Tsinghua University) Hao Zha (CERN) CLIC Workshop 2014 CLIC choke mode structure and X-band activities.
Choke-mode damped accelerating structures for CLIC main linac Hao Zha, Tsinghua University Jiaru Shi, CERN
ABSTRACT A damped detuned structure (DDS) for the main linacs of CLIC is being studied as an alternative design to the present baseline heavily damped.
Compact Linear Collider. Overview The aim of the CLIC study is to investigate the feasibility of a high luminosity linear e-/e+ collider with a centre.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
July Alexej Grudiev, Improvement of CLIC structure. Possible improvement of the CLIC accelerating structure. From CLIC_G to CLIC_K Alexej.
ABSTRACT A damped detuned structure (DDS) for the main linacs of CLIC is being studied as an alternative design to the present baseline heavily damped.
CLIC MAIN LINAC DDS DESIGN AND FORTCOMING Vasim Khan & Roger Jones V. Khan LC-ABD 09, Cockcroft Institute /14.
Wakefield suppression in the CLIC main accelerating structures Vasim Khan & Roger Jones.
ERHIC Main Linac Design E. Pozdeyev + eRHIC team BNL.
Design of Standing-Wave Accelerator Structure
Different mechanisms and scenarios for the local RF
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
Direct Wakefield measurement of CLIC accelerating structure in FACET Hao Zha, Andrea Latina, Alexej Grudiev (CERN) 28-Jan
7.8GHz Dielectric Loaded High Power Generation And Extraction F. Gao, M. E. Conde, W. Gai, C. Jing, R. Konecny, W. Liu, J. G. Power, T. Wong and Z. Yusof.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Course B: rf technology Normal conducting rf Part 5: Higher-order-mode damping Walter Wuensch, CERN Sixth International Accelerator School for Linear Colliders.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
Overview of CLIC main linac accelerating structure design 21/10/2010 A.Grudiev (CERN)
2nd CLIC Advisory Committee (CLIC-ACE), CERN January 2008 Introduction to the CLIC Power Extraction and Transfer Structure (PETS) Design. I. Syratchev.
RF structure design KT high-gradient medical project kick-off Alberto Degiovanni TERA Foundation - EPFL.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
Beam breakup and emittance growth in CLIC drive beam TW buncher Hamed Shaker School of Particles and Accelerators, IPM.
CLIC Power Extraction and Transfer Structure.
CLIC choke-mode structure Hao Zha 2013-Oct-09. Outlines 1. Choke-mode structure design; 2. Optimization on RF parameters; 3. Experiments. 4. Future plan.
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
Hybrid designs - directions and potential 1 Alessandro D’Elia, R. M. Jones and V. Khan.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
Optimization of CLIC-G structure & Design of CLIC open structure Hao Zha, Alexej Grudiev (CERN) Valery Dolgashev (SLAC) 27/01/2015.
TESLA DAMPING RING RF DEFLECTORS DESIGN F.Marcellini & D. Alesini.
Optimization of waveguide geometry in the CLIC-G structures Hao Zha 13/08/2014.
Accelerating structure prototypes for 2011 (proposal) A.Grudiev 6/07/11.
ELI and other things A. D’Elia 1. C-BAND STRUCTURES FOR MULTI-BUNCH RF LINACS: ELI_NP PROPOSAL Bunch charge 250 pC Number of bunches 40 Bunch distance.
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
Direct Wakefield measurement of CLIC accelerating structure in FACET Hao Zha, Andrea Latina, Alexej Grudiev (CERN) 18/06/2015 High Gradient work shop 2015.
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011.
Structure Wakefields and Tolerances R. Zennaro. Parameters of the CLIC structure “CLIC G” (from A. Grudiev) StructureCLIC_G Frequency: f [GHz]12 Average.
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
Status of the sub-harmonic bunching system for the CLIC DB injector front end Hamed Shaker School of Particles and Accelerators, Institute for Research.
Wake-fields simulations and Test Structure
Multi-stage pulse compressor
New test structures for CLIC (RF design)
Dielectric accelerators in Microwave regime and a short pulse collider concept Chunguang jing AWA & Euclid Techlabs AWLC2017 June, 2017.
X-band high-power variable RF splitter
An X-band system for phase space linearisation on CLARA
A 2.3 GHz BANDWIDTH STRUCTURE FOR CLIC_DDS
Optimisation of single bunch linac for FERMI upgrade
RF Power Generation and PETS Design
NC Accelerator Structures
RF design of compact X-band waveguide components
Brief Review of Microwave Dielectric Accelerators
Developments on Proposed
Summary of the test structure design
CEPC injector high field S-band accelerating structure design and R&D
Measurements, ideas, curiosities
Overview Multi Bunch Beam Dynamics at XFEL
Status of the CLIC Injector studies
CEPC Main Ring Cavity Design with HOM Couplers
Progress in the design of a damped an
CLIC Feasibility Demonstration at CTF3
CLIC Power Extraction and Transfer structure (PETS)
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Parameters Changed in New MEIC Design
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Presentation transcript:

Update of CLIC accelerating structure design Hao Zha, Alexej Grudiev 18/01/2015

Could be further optimized CLIC base line design So called CLIC-G design: [A. Grudiev et al., Design of the clic main linac accelerating structure for clic conceptual design report, LINAC 2010, MOP068]. Could be further optimized Working frequency[GHz] 11.994 Shunt impedance [MΩ/m] 92.0 Number of Cell 26+2 Peak input power [MW] 63.4 Active length[mm] 230 RF to beam efficiency 27.9% Average Gradient [MV/m] 100 Total pulse length [ns] 242 Phase advance per cell 120° Filling time [ns] 67 Bunch charge 3.72*109 Maximum electric field [MV/m] 248 Bunch train number 312 Maximum Sc [MW/mm2] 5.70 Bunch separation [ns] 0.5 Maximum temperature rise [K] 47

HOM wakefield suppression of CLIC-G Wakefield suppression requirement: transverse kick at 0.5 ns < 6.6 V/pC/m/mm The design was proved by the Wakefield measurement at FACET facility. Transverse offset deflected orbit Downstream BPMs Dump e+ e- CLIC-G TD26cc Dipole e+, Driver bunch e-, Witness bunch Charge: 3 nC; Energy: 1.19GeV; Bunch length: 0.7mm (RMS) EXPERIMENTAL VERIFIED! !

New-CLIC-G design We found that: the profile of wall geometry: elliptical arc -> polynomial line, surface H-field ↓ ; Optimize the waveguide geometry: cell diameter ↓,surface H-field ↓ ; Larger rounding: input power ↓, manufacturing cost ↓ R = 0.5mm R = 2.5mm elliptical arc Width=11mm ->10.1mm Opening=8mm->7.8mm polynomial line

Maximum temperature rise [K] New-CLIC-G design Now we have a lower surface field , lower input power , lower cost  design: CLIC-G* . Manufacturing is now undergoing (anticipate high power test in 2016). CLIC-G CLIC-G* Rounding[mm] 0.5 1.0 Manufacturing cost reduction -- 7%↓ Shunt impedance [MΩ/m] 92.0 95.4↑ Peak input power [MW] 63.4 62.3↓ RF to beam efficiency 27.9% 28.4%↑ Filling time [ns] 67 66↓ Maximum electric field [MV/m] 248 250↑ Maximum Sc [MW/mm2] 5.70 5.65↓ Maximum temperature rise [K] 52 41↓

Load design for CLIC structure Cell, higher manufacturing accuracy ~1um Cell diameter: 20 cm. Use manifold design to reduce cost Manifold, lower manufacturing accuracy 5~10um 20 cm 4 cm 5 cm : safety distance

Load design for CLIC-G structure Cell diameter is limited by : Safety distance (Maintain Low accelerating mode loss) RF load design (HOM suppression) 200 W peak loss per load 2.4 mW average loss

Load design for new CLIC-G* structure New design diameter: 17 cm Safety distance : 3.3 cm, Load Length: 4.2 cm 17 cm 4.2 cm 3.3 cm

Load design details Length is dominated by the tapered section. L1 = 38 mm, L2 = 4mm (old CLIC-G, L1 = 30 mm, L2 = 10 mm). Smaller waveguide -> longer propagate wavelength -> L1↑ . More powerful damped material? -> L1 ↓ , safety distance ↑, total length change very little. power SiC: R. EICHHORN, CORNELL 5 mm L2 = 4 mm : Normal section L1 = 38 mm : Tapered section 0.5 mm

Change the waveguide geometry Change waveguide geometry to compensate the reflection in the load. Matching step in the waveguide could match the RF load cell by cell. Tapered waveguide design Matching step design

Final RF load design Load length = 3.3 cm, Safety length = 3.2 cm. Full diameter decrease by 5 cm! Wakefield suppression keep same. Old CLIC-G design : 20 cm New CLIC-G design : 17 cm New CLIC-G design with matching step: 15 cm

Coupler design CLIC-G structure has double feed coupler. CLIC PETS 3 dB hybrid High power RF load 62.5 MW 135 MW CLIC-G structure has double feed coupler. A power splitter is usually use to feed the structure in two branches. Wakefield dipole mode? A power splitter here ? Coupler waveguide HOM waveguide

HOM suppression in the coupler Wakefield TM011x mode go though the coupler waveguide to the power splitter. Reflected? Absorbed? HOM suppression Magic-T: Power splitter and HOM coupler are isolated + - Accelerating TM010 mode Wakefield TM011y mode Wakefield TM011x mode Coupler waveguide HOM waveguide + Coupler waveguide HOM waveguide + - Coupler waveguide HOM waveguide - +

HOM suppression in the coupler Do Fourier

Design of the HOM-free Magic-T Straightforward to match the working frequency (bandwidth: 130 MHz). For HOM mode matching? Need very large bandwidth (> 1 GHz): tune the waveguide dimensions. Mismatch in working frequency Mismatch in dipole frequency Trapped modes

Trapped modes Change the waveguide width to tune the frequency of trapped modes. Optimum width: 25 mm.

Wakefield simulations The HOM free magic decrease at least 1/2 of the reflected wakefield in the coupler.

I hate trapped modes! Bend waveguide excited extra TE20 modes. TE20 mode is allowed for 17 Ghz in the WR 90 waveguides. Need more work!

Summary We’ve almost finished the new CLIC accelerating structure design: Better RF parameters of the structure Lower machining cost Compact transverse dimensions and RF loads. HOM-free magic-T for the power coupling.