Vers PS YETS 2017-2018 PS Booster David HAY & Cyrille BEDEL.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Electrial Safety LS2 days November 2016 AP
Update on the PSB Cooling and Ventilation Systems
YETS & LS2 Works EN-EL / Power distribution
Linac4-PSB 160 MeV connection readiness review
ABT-EC EYETS Activities 2nd reports
LIU – EVM status and next steps
AFC 2017 (and 2018) AFC timeline:
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Framework Schedule from EYETS 2016 to LS2
BE-ICS activities for LIU Project
SPS LS1 Planning meeting (N019) 04/09/13
Update on the Critical Path of the PS Booster Schedule for the EYETS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
EYETS Works EN-EL [ FC excluded ]
YETS & LS2 Works EN-El on LHC / Power distribution
BE-ICS Activities during the LS2 Period (15 min)
TE-MSC activities in SPS during LS2
EYETS David Hay EN-OSS.
ELENA installation and commissioning status
EYETS LHC 2016/2017 Works EN/EL/CF
LIU / HL-LHC Cost and Schedule Review
LIU – EVM status and next steps
AD consolidation activities in LS2
SPS - EYETS 2016/17 Vacuum systems planning
Configuration Management and Layout Database ELENA Project
LIU–PLI report LIU PSB meeting.
SHORT LHC-TS Coordination meeting #1
EYETS16-17 ACTIVITIES EN-EL-CF
Planning and Installation
EC Activities Status for the LIU
BE-ICS activities for LIU Project
LIU–PLI report LIU SPS meeting.
TE-ABT Activities for LS2
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
YETS Booster Post-Mortem
WPs concerned by L4 connection:
SPS East Extraction bump inhibit during COLDEX operation
SPS activities during LS2 TE-EPC (Power Converter Group)
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
Short LHC-TS week 38 Confirmed by LMC on 16th August
YETS PS + PS SWY + TT2 Facility Coordinator:
EN-HE L2 – PS – PSB – TT2 works during YETS
YETS & LS2 Works EN-EL / Power distribution
TE-MSC activities in SPS during YETS
BE-CO Activities for PSB
East Hall under construction
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
GIS Portal Racks Project
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Experimental Areas – LS2 planning
Implementation of RP training ranks in SPS and NA_target
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

Vers PS YETS 2017-2018 PS Booster David HAY & Cyrille BEDEL

Master Schedule Date YETS 2017-2018 PS Booster

Overview of the machine activities LIU Project Overview of the machine activities HL-LHC Project Fire Safety Project New PPS Project Vers PS EN-EL Consolidation. Lighting Power New EBD switchboard Consolidations Maintenance Upgrade Install GSM cable EN-EL cable campaigns LIU signal cables (PSBLIU-CC02) LIU DC cables (PSBLIU0-CP02) General cables (PSBINT0-CYC01) New SEMGrid (4L1 ring 3) TBC? Replace wire scanner in 4L1 New Tune pick-up BPM (3L1) Replace wire scanner in 2L1 EN-CV Remove heating system Terminal units Pipes Valves Date YETS 2017-2018 PS Booster

Overview of the surface activities LIU Project Overview of the surface activities HL-LHC Project Fire Safety Project New PPS Project Consolidations Maintenance Upgrade TE-EPC Install pulse transformers Install power converters EN-CV Install temp cooling circuit EN-HE Install transformer lifting beam EN-EL cable campaigns LIU signal cables (PSBLIU-CC02) LIU DC cables (PSBLIU0-CP02) POPS-B cables (PSBL.IUO-CC05 & CP02) General cables (PSBINT0-CYC01) EN-EL Consolidation. Lighting Power New EBD switchboard TE-MPE/EN-EL Install 2 new racks (BIC) IT-CS Wi-Fi consolidation Star point consolidation Date YETS 2017-2018 PS Booster

Linear Schedule Date YETS 2017-2018 PS Booster

General Constraints YETS 2017-2018 PS Booster Date

Machine activities on the critical path Date YETS 2017-2018 PS Booster

Engineering Change Requests Facility Title Reference Author PS Booster New SEM Grid Monitor in Period 4 (LIU-PSB) This ECR is urgently needed if the work is to be done during YETS Space Reservation Request PSB-LJ-EC-0004 BE-BI Four New Pickups Dedicated for Tune Measurement (LIU-PSB) PSB-BPMTA-EC-0001 Released J. Abertone, M. Gasior (BE-BI) EIS-Machine Related to the Powering Configuration of the PS Booster Bending Magnets PSB-Y-EC-0001 Released L. Hammouti (BE-ICS) New Lighting System for the PS Booster Tunnel (CONSOLIDATION) PSB-E-EC-0001 Under Approval J. Devine (EN-EL) Replacement of a Telecoms Radiating Cable in the PS Booster (CONSOLIDATION) PSB-CC-EC-0001 Under Approval S. Agosta (IT) For questions regarding ECRs please contact T. Birtwistle (EN-ACE-CL) Date YETS 2017-2018 PS Booster

Activities pending approval TE-ABT (J. Schipper) if possible, would like to install and then test new software and timing hardware for the Ejection Kickers & Bumpers: BE1.KFA14L1,BE2.KFA14L1,BE3.KFA14L1,BE4.KFA14L1,BE.BSW14L4 , BE.BSW15L1 & BE.BSW15L4. This would involve pulsing the magnets (method & duration to be determined) out of hours during YETS !! (de)consign magnets and restrict access. BE-BI (W. Andreazza) Install the new SEMGrid in 4L1 ECR? SEMgrid readiness? Would require reopening the vacuum sector BR20 late into YETS. EN-CV (G. Petrika) would like to remove the redundant heating infrastructure installed at ceiling level in the injection area. Lifting and handling issues + mechanical & dust protection of the machine infrastructure (would involve working at height off nacelles or scaffolding). Pilot scheme requires LIU-PSB committee approval. Date YETS 2017-2018 PS Booster

Coordination Contacts Groupes Contact In case of absence BE-CO E. Said M. Vanden-Eynden BE-BI W. Andreazza R. Veness BE-ICS D. Chapuis (Access) D. Raffourt (F/Evac) R. Nunes (Ac) or S. Grau (F/Evac) BE-OP A. Akroh & F. Chapuis B. Mikulec BE-RF M. Haase C. Rossi EN-ACE D. Hay J. Coupard Survey T. Dobers D. Missiaen EN-CV J-M Vuaillat - E. Amarilla S. Deleval EN-EL G. Georgiev - J. Devine - P. Gallay D. Bozzini EN-HE Y. Seraphin - N. Perez - G. Roche C. Bertone EN-STI J. Lendaro S. De Man SMB-SE D. Pazem F. Magnin HSE-RP G. Dumont - J-F Gruber R. Froeschl HSE-SEE L. Colly C. Pinto TE-ABT L. Feliciano - T. Masson - A. Prost F. Castronuovo TE-EPC C. Coupat - L. De Mallac - S. Pittet V. Montabonnet TE-MSC A. Newborough D. Tommasini TE-VSC P. Demarest - J. Ferreira Somoza G. Bregliozzi TE-MPE C. Martin - R. Mompo J. Uythoven IT-CS L. Borakiewicz - S. Agosta M. Da Costa Date YETS 2017-2018 PS Booster

Important contacts & links Facility Coordinator / TSO: David Hay 16 33 17 Deputy: Fernando Pedrosa 16 22 37 Operational Safety Advisor (EROS): Cyrille Bedel 16 08 04 Deputy: eros-safety@cern.ch Piquet number: 16 17 37 General Coordination website: http://ls1ls2.web.cern.ch/ Detailed schedule: https://pwa.cern.ch/Projects-Accelerator-Complex-Schedules/Projects.aspx Track-it: https://cmmsx.cern.ch/SSO/trackit/ Layout Drawings: https://layoutdrawings.web.cern.ch/ Impact: https://impact.cern.ch/ Date YETS 2017-2018 PS Booster

Q’s

Opening and closing sequence

Beam instrumentation installations

BE department activities

EN department activities

EN-EL activities

HSE, SMB, IT department activities

TE department activities