Contribution of Henry Gantt

Slides:



Advertisements
Similar presentations
Project Management Techniques and tools Move mouse over arrow to enter presentation End Show.
Advertisements

TK3333 Software Management Topic 7: Schedule Control.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Project Management and scheduling Objectives of project scheduling Network analysis Scheduling techniques.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
8-1 Scheduling Scheduling Defined Gantt Charts Network Techniques: PERT and CPM Determining Task Durations Probability and Simulation Some Examples.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
PERT / CPM PERTProgram Evaluation & Review Technique CPMCritical Path Method.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
Project Management in Practice Fifth Edition Copyright © 2014 John Wiley & Sons, Inc. Chapter 5 Scheduling the Project.
L ECTURE 5 – G ANTT C HART GANTT Charts Constructing GANTT Charts Staffing and Re-scheduling Project Management Software Software Project Management Maria.
1 Operations Management Lesson 5 Project Management.
Project Management. Maintenance and Reliability 14 Aug 2001.
1. Henry Laurence Gantt, A.B., M.E. ( November 1919) was a mechanical engineer and management consultant who is most famous for developing the.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
Roberta Russell & Bernard W. Taylor, III
Engineering Design Development. Turner College and Career High School.
Gantt Chart Engineering Design Development. Turner College and Career High School.
Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
GANTT Charts. What is a GANTT chart? A Gantt chart is a type of bar chart that illustrates a project schedule. Gantt charts illustrate the start and finish.
MST 326 Lecture 7 Project planning John Summerscales School of Engineering University of Plymouth.
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Feasibility and Cost/Benefit Analysis. Cost considerations u Cost classifications –Tangible / Intangible –Direct / Indirect –Fixed / Variable –Developmental.
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
Copyright 2006 John Wiley & Sons, Inc. Project Management OPIM 310.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
ENGM91 ACTIVITY PLANNING Unit 2
Project Management: A Managerial Approach
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Chapter 17 Project Tracking. Objectives Identify, develop, and use project management tools to track project progress: Schedules Gantt Charts Toll Gate.
Gantt Chart Heba Iqbal. What is a Gantt chart? Developed by Henry Gantt Were considered revolutionary when first introduced Type of bar chart Illustrates.
Create a Work Breakdown Structure (WBS) n Develop the project goal yourself n Take a cursory pass at defining the objectives –the preliminary plan n Have.
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
12/2/2015 2:45 AM 1 PROJECT TIME PLANNING Process and Bar Chart Technique.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 10 Projects.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
WEEK 3 Project Planning.
Survey Training Pack Session 17 – Budgeting and timelines for survey design and implementation.
IE 366 Chapter 6, Section 10 Project Planning and Scheduling.
Managing the Information Systems Project Cont’d
Chapter 3 Managing the Information Systems Project
Project Management.
Project Management Project Controlling
PROJECT MANAGEMENT.
Project Management (專案管理)
Project Management: PERT/CPM
Management should be based on effective and thorough planning
Business System Development
Time Planning and Control Activity on Node Network (AON)
Project Management for Business
Project Management and scheduling
Project Planning and Scheduling
Critical Path Method (CPM). Background & History Developed in the 1950s by the US Navy & Du Pont. Originally, the critical path method considered only.
Stevenson 17 Project Management.
Project Management Chapter 17
Time Planning and Control Activity on Node Network (AON)
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
HENRY LAURENCE GANTT.
Scheduling.
Presentation transcript:

Contribution of Henry Gantt Monaz Parekh

Introduction Henry Gantt (1861-1919) was born into a family of prosperous farmers in Maryland in 1861. He graduated from Johns Hopkins College and was a teacher before becoming a draughtsman in 1884 and qualifying as a mechanical engineer. From 1887 to 1893 he worked at the Midvale Steel Company in Philadelphia, where he became Assistant to the Chief Engineer (FW Taylor) and then Superintendent of the Casting Department. Gantt and Taylor worked well in their early years together and Gantt followed Taylor to Simonds Rolling Company and on to Bethlehem Steel. In 1917 he accepted a government commission to contribute to the war effort in the Frankford Arsenal and for the Emergency Fleet Corporation

Gantt's contribution Gantt's Task and Bonus wage system Introduced in 1901 as a differential of Piece Wage System Employee received a bonus in addition to his regular day rate if he accomplished the task for the day Enabled workers to earn a living while learning to increase their efficiency, production often more than doubled

Gantt’s Contribution 2. The perspective of the worker and supervisor Gantt was interested in an aspect of industrial education which he called the 'habits of industry' - habits of industriousness and co-operation, doing work to the best of one's ability, and pride in the quality as well as the quantity of work. Gantt brought in an innovation, by paying the foreman a bonus if all the workers met the required standard of performance From his experience as a teacher, Gantt hoped that his bonus system would help to convert the foreman from an overseer and driver of workers to a helper and teacher of subordinates.

Gantt’s Contribution 3. Gantt's Bar Chart These started as a humble but effective mechanism for recording the progress of workers towards the task standard A daily record was kept for each worker - in black, if he met the standard, in red, if he didn't. This expanded into further charts on quantity of work per machines, quantity of work per worker, cost control and other subjects A bar chart showed how work was scheduled over time through to its completion. This enabled management to see, in graphic form, how well work was progressing, and indicated when and where action would be necessary to keep on time The Gantt Chart provided a graphic means of planning and controlling work and led to its modern variation - PERT (Program Evaluation and Review Technique)

Application of Gantt’s Principles in Modern Business Gantt chart is used today in modern day production scheduling methods It is translated in 8 languages and used throughout the world Starting in 1920 it was used in Japan, Spain and Soviet Union Formed basis for two charting devices used for planning, organizing and controlling complex organization’s processes Critical Path Method (CPM) originated by Du Pont Performance Evaluation and Review Technique (PERT) developed by Navy LOTUS 123

University of Nottingham 9/16/2018 Gantt Chart A GANTT chart is a type of bar chart that illustrates a project schedule. After the PERT/CPM analysis is completed, the following phase is to construct the GANTT chart and then to re-allocate resources and re-schedule if necessary. GANTT charts have become a common technique for representing the phases and activities of a project work breakdown structure. It was introduced by Henry Gantt around 1910 – 1915. Maria Petridou

University of Nottingham 9/16/2018 Gantt Chart Maria Petridou

University of Nottingham 9/16/2018 Gantt Chart Characteristics: The bar in each row identifies the corresponding task The horizontal position of the bar identifies start and end times of the task Bar length represents the duration of the task Task durations can be compared easily Good for allocating resources and re-scheduling Precedence relationships can be represented using arrows Critical activities are usually highlighted Slack times are represented using bars with doted lines The bar of each activity begins at the activity earliest start time (ES) The bar of each activity ends at the activity latest finish time (LF). Maria Petridou

University of Nottingham 9/16/2018 Gantt Chart Advantages Simple Good visual communication to others Task durations can be compared easily Good for scheduling resources Disadvantages Dependencies are more difficult to visualise Minor changes in data can cause major changes in the chart Software Project Management Maria Petridou Maria Petridou

2 Critical Elements of a task Terminal elements are the smaller more intricate tasks that need to be completed as part of a larger task. Summary element is made up of terminal elements to form the larger task. For example, a summary element for a car manufacturer would be to paint the vehicle. The terminal elements of painting the vehicle would be to strip any original paint, primer, apply your first, second and top coats, and finally, wash, wax and buff the new paint job.