Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

2012 ITE Annual Conference Allen Nie, PhD, PE, HMM June , Santa Barbara, CA SR 46 Improvement PSR/PDS Study.
State of Morrisville Mayor Mark Stohlman July 17, 2014.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
US 52 Corridor Study Public Meeting November 15, 2010.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Applying DynusT to the I-10 Corridor Study, Tucson, AZ ITE Western District Meeting Santa Barbara June 26th, 2012 Jim Schoen, PE, Kittelson & Assoc. Khang.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Lynn Peterson Secretary of Transportation Combining Macro Scopic and Meso Scopic Models in Toll and Traffic Revenue Forecasting SR 167 Corridor Completion.
Orem City Roundabout Feasibility Study Brigham Young University and the City of Orem Determination of available land Roundabout parameters established.
Tshwane Line 1 Traffic Simulation Results October 2012.
BROKENHEAD OJIBWAY NATION COMMUNITY MEETING June 23, :00 PM – 7:00 PM Information on the PTH 59N and PTH 101 Interchange.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
Portland State University 11 By Maisha Mahmud Li Huan Evaluation Of SCATS Adaptive Traffic Signal Control System.
Problem 1: Determination of Facility Types for Analysis.
Problem 4: Clifton Country Rd/Route 146 Intersection Base Case Phasing and Volumes Analysis Plans Description of Analyses Overarching Issues 4a: AM peak.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
September 14, 2015 Transportation Board of Directors John M. Terry Assistant Director- Engineering SR-160 from SR-159 to Mountain Springs Phase 2 Final.
Best Practices for Collecting Counts and Risk Evaluation for Bicyclists and Pedestrians Krista Nordback, P.E., Ph.D., PSU Taylor Phillips, PSU Mike Sellinger,
US Route 33 Access Management Study Purpose- Determine feasibility of converting US 33 from Hamilton Road in Franklin County to Carroll in Fairfield County.
April 20, 2012 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Fehr & Peers | December 13 th, 2011 Traffic Access and Circulation Analysis Pinole Valley High School Reconstruction.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Lessons Learned from Intersection Improvements on U.S. Highway 280 PMI Central Alabama Chapter Darrell B. Skipper, P.E.
Visit Our Website at: Click to edit Master title style.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
NC-54 at Farrington as Offset Intersection
MD 30 (Hanover Pike) at Mt. Gilead Road
Integrating Transit and Highway Solutions In High Volume Corridors
Nixon Road Corridor Study: Findings & Options
(Expressway Traffic Management System)
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
The I-465 West Leg Reconstruction Project
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
Mesoscopic Modeling Approach for Performance Based Planning
Fordham at Columbia as a Grade-Separated Intersection
Light Rail Enhancement Project
Evaluation and Re-Design Haifa and Yafa Streets.
Homeowners Update Meeting
District 3 Complete Streets Projects
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
The Oakton Condominium Association September 12, 2017
River to Sea TPO Meeting US 92/International Speedway Boulevard
Slugging in the I-395 Corridor
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Evaluation and Redesign Faisal and Amman Streets
FM 518 By-pass Traffic Review
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Proposed Driscoll Expansion Brookline, Massachusetts
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
Fordham at Columbia as a Grade-Separated Intersection
Colorado Avenue University of Colorado, boulder
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Presentation transcript:

Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance and better accommodate pedestrians Minimize potential construction costs

Study Area Our study area is the section of NC 54/US 15-501 between Raleigh Rd and South Columbia/NC 86 Separated into 2 sections based on available traffic count data Section 1: Raleigh Rd interchange and adjacent intersections on NC 54/US 15-501 Section 2: NC 86 interchange and adjacent NC 86/Mt Carmel Church Rd intersection

Study Area

Preliminary Assumptions – Raleigh Rd Study Scenarios: Existing Year (2016) No-Build Future Year (2030) Build Peak Hours: Weekday AM Weekday PM Annual growth rate of 1%

Design Concept – Raleigh Rd

Preliminary Results & Observations – Raleigh Rd Two proposed signals on Raleigh Rd and one on NC 54/US 15-501 south of Raleigh Rd all intersecting with ramps Proposed signals are operating at LOS C or better during weekday peak hours Improves safety at interchange by eliminating weave segments on Raleigh Rd Better accommodates pedestrians by providing crosswalks/ped phasing at signals on Raleigh Rd Old Mason Farm Rd/Carmichael Ct intersection is operating at LOS E during the AM peak and LOS F during the PM

Preliminary Assumptions – NC 86 Study Scenarios: Existing Year (2014) No-Build Future Year (2040) Build Peak Hours: Weekday AM Weekday PM Utilizing volumes from US 15-501 Widening – Project Level Traffic Forecast (U-5304)

Design Concept – NC 86 Evaluating grade separated intersection idea that was developed by Dr. Hummer