Tools for project scheduling.

Slides:



Advertisements
Similar presentations
Gantt Chart.
Advertisements

Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
Chapter 10: Project Schedule Planning
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
ASSIGNMENT 1 Model Answers. Question 1 Q1) Consider building a garden shed project, which involves designing the shed, figuring out what materials are.
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
Review Questions Speculate as to the advantages and disadvantages of appointing project mangers from the ranks of senior systems analyst. The advantage.
Winter 05 Project Schedule A Gantt Chart is a means of presenting the master schedule of activities for your project –Named for Henry L. Gantt ( ),
Gantt Charts and PERT Charts. Copyright © 2009 South- Western/Cengage Learning. All rights reserved. 14–2 Managing Operations Systems Planning Sheet –
Project Scheduling & Budgeting CEE 402 Engineers Without Frontiers Lecture 6 February 26, 2003.
The Gantt Chart in Project Management. What is a Gantt Chart?  A type of chart that shows the Work Breakdown Structure (WBS) in terms of the start and.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
Workshop-3 Gantt and Pert Chart.
Planning & Scheduling Your Projects 1. Planning Elements Work Breakdown Structure (WBS) ◦Identifying the tasks and organizing them Scheduling the WBS.
GANTT Charts. What is a GANTT chart? A Gantt chart is a type of bar chart that illustrates a project schedule. Gantt charts illustrate the start and finish.
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
Copyright Irwin/McGraw-Hill Project and Process Management Techniques Prepared by Kevin C. Dittman for Systems Analysis & Design Methods 4ed by.
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
TA. MARAM AL-KHAYYAL NET481 MS Project Overview. Outline Introduction to project management.  Project 2007 can help you manage project time, resources,
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Scheduling CTC-415. Scheduling Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Tm&i 2010 VI.1 technology management & innovation introduction to project management (ii) project planning methods & tools.
Gantt Chart Heba Iqbal. What is a Gantt chart? Developed by Henry Gantt Were considered revolutionary when first introduced Type of bar chart Illustrates.
Unit 9.2_Lesson 2_CD Resource 2f_Plenary Gantt charts From the Gantt Chart answer the question.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
Gantt chart A graphical representation of the duration of tasks against the progression of time. Used for effective time management Lays out the order.
W ORK B REAKDOWN S TRUCTURE (WBS). W ORK B REAKDOWN S TRUCTURE  A method to organize the project total scope of work in a hierarchical structure where.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
Project Scheduling Class 7.
Project Schedule & Gantt Chart Unit 4 – Virtual Project.
Project Management SAI’s Class. Project Management Task Cadets will create a project management plan and their project. a. Define the stages of project.
Survey Training Pack Session 17 – Budgeting and timelines for survey design and implementation.
Mastering Digital Media Project Management November 22, 2007 By: Nagehan & Ahmad.
Chapter 9 Planning. 222 Learning Objectives  clearly defining the project objective  developing a work breakdown structure  developing a network diagram.
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
Gantt Chart of Progress FY
A Brief intro to Project Management What can it do for you
Project Management – PTM721S
PROJECT MANAGEMENT TOOLS AND TECHNIQUES
Project Management MGT 30725
I want to plan a project by developing a project schedule Gantt Chart.
Project Management Systems
WHAT IS A GANTT CHART.
Gantt Chart Presentation Name Course Name
Project Scheduling
PERT & GANTT CHARTS An Introduction.
REQUIREMENTS Project management tools
Fall 06 ECE 361 Project Schedule
Project Management and Information Security
CHAPTER 6 PROJECT TIME MANAGEMENT
Chapter 5 Planning
Guide to Project.
PROJECT MANAGEMENT Bill Biddle.
Project Management: A Managerial Approach
Rank-order bar chart of percentage of patient-days with blood glucose results > 299 mg/dl for non-ICU units. Rank-order bar chart of percentage of patient-days.
Gantt Chart.
Gantt Chart of Progress FY
Project Management © 2004 D. J. Foreman.
P ROJECT M ANAGEMENT Skills.
Planning assignment in MS-Project
PROJECT MANAGEMENT TOOLS AND TECHNIQUES
Project Management © 2004 D. J. Foreman.
Importance of Project Schedules
Leading A Group.
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Management © 2008 D. J. Foreman.
Presentation transcript:

Tools for project scheduling. Gantt Charts. Tools for project scheduling.

Gantt charts. A Gantt chart is type of bar chart that illustrates a project schedule. Gantt charts illustrate the start and finish dates of the activities/tasks of a project along with their progress. The artifacts such as WBS, PERT chart, project schedule provide all the better support to prepare a Gantt chart. The initial format of the chart was developed by Henry L. Gantt (1861-1919) in 1910. The horizontal axis represents time. The tasks/activities are listed along vertical axis. Gantt Charts. Masroor Hussain [SPM Session Feb. 2014]

1 Simple Gantt chart. Gantt Charts. Masroor Hussain [SPM Session Feb. 2014]

2 Gantt chart (using the WBS). Gantt Charts. Masroor Hussain [SPM Session Feb. 2014]

3 Gantt chart (An IT project). Gantt Charts. Masroor Hussain [SPM Session Feb. 2014]

Critical Activities Non - Critical

4. PERT VS Gantt. PERT and Gantt charts are frequently presented as mutually exclusive project management tools. PERT is usually recommended for higher projects with high inter-task dependency. Gantt is recommended for simpler projects. Most project managers prefer Gantt charts because of their simplicity and ability to show the schedule of a project. PERT vs. Gantt. Masroor Hussain [SPM Session Feb. 2014]

Assignment. You have been asked to produce an application that maintains a blood donors database. The idea is to locate a donor when a particular group of blood is needed by a hospital. Prepare a WBS for this project. Using the WBS create a PERT chart. Make assumptions about activity durations. - Also create a Gantt chart. Ascertain the duration of the project. Assignment. Masroor Hussain [SPM Session Feb. 2014]

THAT’s IT. THE END.