Florida Gas Transmission 16-Inch Section#1 Hydrostatic Test

Slides:



Advertisements
Similar presentations
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Advertisements

Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
Overtime Air Request Website (CWEB). Itinerary for this session: Sign In View Past overtime air requests history View Current overtime air requests View.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
Florida Gas Transmission Section #2 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From Tampa By-Pass Canal to East of Lake Magdalene Hillsborough.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Florida Gas Transmission Mainline Hydrostatic Test From the Palmetto Expressway Interchange with Okeechobee Road to the Intersection of Milam Dairy Road.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
ILLINOIS DEPARTMENT OF TRANSPORTATION Improving Safety For Incident Responders Illinois Department of Transportation Update: June 2010 MODULE 5 INCIDENT.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Florida Gas Transmission Section #1 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From Compressor Station 30 (Plant City West) to Main Line.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
Florida Gas Transmission Mainline Hydrostatic Test From the Golden Glades Interchange to the interchange of NW 122 nd Street with the Palmetto Expressway.
December 2006 Study Update We’ve been busy since our last round of advisory committee and task force meetings were held in the summer and fall. Our next.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Florida Gas Transmission 16-Inch Section#2 Hydrostatic Test
Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve B) to US-19 North of SR 688/Ulmerton.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Mine Safety and Health Administration South Central District Elwood M. Burriss Staff Assistant South Central District Dallas, Texas
Florida Gas Transmission 16-Inch Section#1 Hydrostatic Test 16-Inch Saint Petersburg Lateral Pipeline From Polk City to Lakeland Polk County.
Alternative Alignments Public Meeting
Motion for Extension of Time to Retain Counsel Tutorial
Town of Brighton, Department of Public Works
Four Winds Condominium Association August 2, 2017
THE PALM BEACH COUNTY LEAGUE OF CITIES.
CITY OF HALLANDALE BEACH
June 5, 2017.
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Project Status & Right-of-Way Acquisition
Center City Connector 101.
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Florida Gas Transmission Mainline Hydrostatic Test
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
2010 Regional Intelligent Transportation Systems Plan: 2017 Progress Report on Implementation The Florida-Alabama, Okaloosa-Walton, and Bay County Transportation.
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
Highway 14 – Owatonna to Dodge Center District 6 Update
Florida Gas Transmission Mainline Hydrostatic Test
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
STREETS & STORMWATER DEPARTMENT
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Arizona Conference on Roads and Streets Multimodal Cities: Addressing Issues in Transit Corridors March 24, 2016.
Neighbourhood Traffic Calming Open House
Jeff Byler (AECOM) Shane Winner Wayne Swinehart
SD INTRASTATE PUBLIC EDUCATION
Florida Gas Transmission Mainline Hydrostatic Test
Florida Gas Transmission Mainline Hydrostatic Test
PROJ. 566(17) LOR PID MAJOR WIDENING
TRENTON Casing Filler Presentation
City of Bayport Flood Public Information Meeting
Transportation Workshop
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
Harbour Island Force Main Replacement
Central Avenue Rapid Transit
Metropolitan District | mndot.gov
Interstate 95 Corridor Improvement Plan
Nine Mile Ride – Project Timeline
Alex Henry FDOT District Seven Safety Office
Broward County Congestion Assessment
SD INTRASTATE PUBLIC EDUCATION
Greater Pittsburgh Airport Area Property
Transit in TSMO: Bus On Shoulder
Presentation transcript:

Florida Gas Transmission 16-Inch Section#1 Hydrostatic Test 16-Inch Saint Petersburg Lateral Pipeline From Polk City to Lakeland Polk County

Today’s Outline Who is Florida Gas Transmission (FGT)? Why is FGT testing? What is the test exactly? When will the test occur? Where will the test take place? How will the test be conducted? How will the test affect me?

Florida Gas Transmission Company Natural gas transmission company operating a 5,000 mile pipeline system along the Gulf Provide majority of the natural gas for power generation in Polk County 16-inch diameter pipeline serving Tampa area Customers include: Electric utility companies Local distributors Industrial clients

Need for the Test The U.S. Department of Transportation regulates all interstate pipelines Testing is federally mandated Best practice to confirm the safety and reliability of the pipeline Safety is our #1 priority Ensure continued superb client service

Nature of the Test Hydrostatic Test Remove the natural gas from the line Controlled release vents harmlessly into atmosphere Service is maintained on another system Test the integrity of the pipeline by filling the line with water Put the water under pressure for a fixed period of time

Background Hydrotesting the 16-inch lateral system Standard, common pipeline test procedure Recent, successful pipeline tests were completed in: Polk testing has been set for October 2015 Hillsborough Palm Beach Miami-Dade St. Lucie Broward Martin

Prepare System for Testing Project Process Begin Project Obtain Permits Prepare System for Testing Conduct Hydrotest End Project Public Awareness Campaign

Project Schedule Test window is set: Monday, 19 October 2015 TASK DATE Community Awareness July – November Permit Applications July – August System Preparation August – September Test Preparation September – October Conduct Hydrotest 19 October 2015 Test window is set: Monday, 19 October 2015 Early morning, midnight – 4:00 a.m.

Project Location Total Project Length = 15.8 miles Begin: SR 33/Commonwealth Ave N, Polk City End: Kathleen Rd, Lakeland Generally follows the below roadway alignments: SR 33/Commonwealth Ave N CR 582/Old Polk City Rd CR 582/N Socrum Loop Rd/Marcum Rd US-98 Within Unincorporated Polk County, Polk City, and Lakeland

Project Location (con’t)

How the Test is Performed Remove natural gas from the pipeline Completed the week before the hydrotest Fill the line with water Pressurize the system Normal operating pressure is 788 PSI Test pressure is up to 1,350 PSI Relatively short duration (approx. 30 minutes) Reduce to intermediate pressure at 1,225 PSI Maintain for 8 hours

How the Test is Performed (con’t) De-pressurize the line Drain the water from the system If any integrity issues are found: They are corrected as soon as possible The hydrotest is performed again Any re-testing will be performed as soon as possible, during the same hours Resume normal natural gas service

Safety During the Test Safety is our #1 priority Performed extensive test preparations, including an inspection of the entire system Any pipe anomalies will be repaired in advance of conducting the hydrotest For the duration of the high pressure test, as a safety consideration, we plan to isolate sections of the pipeline route from people and traffic

Conducting the Test Advance Preparations Make all key stakeholders aware Adjacent property owners Emergency service providers General driving public Announcements Flyers, newspaper, website, etc. Dynamic message signs 2 weeks in advance

Conducting the Test (Con’t) Night of the Test Begin at midnight Close roads/lanes with barricades Law enforcement support Confirm all-clear along the 15.8-mile corridor Conduct hydrotest Reopen roadways at approximately 4:00 AM

Traffic Control During the Test General Utility Permit from the Florida Department of Transportation is in process Officers will be stationed at road and lane closures Emergency responders will be able to cross as needed Detours will include signs and officer support

Detours During the Test – SR 33 Southbound lane of SR 33/Commonwealth Avenue N closed – flaggers will be used to allow two-way traffic between: Tavares Rd and Voyles Loop (N) Both directions of SR 33/Commonwealth Avenue N closed – use detour route along: Voyles Loop (S)/Voyles Loop (N)

Detours During the Test – CR 582 CR 582/Old Polk City Rd full road closure: Epicenter Blvd to Walt Loop Rd Detour Route (South side of CR 582): SR 33/Commonwealth Ave N Old Combee Rd CR 582/N Socrum Loop Rd Walt Loop Rd Walt Williams Rd Daughtery Rd

Detours During the Test – CR 582 CR 582/Old Polk City Rd full road closure: Epicenter Blvd to Walt Loop Rd Detour Route (North side of CR 582): Moore Rd Tom Costine Rd CR 582/N Socrum Loop Rd US-98

Detours During the Test – CR 582 CR 582/N Socrum Loop Rd/Marcum Rd full road closure: Walt Loop Rd to US-98 Detour Routes (north-south crossings open): CR 582/N Socrum Loop Rd Pearce Ave/N Socrum Loop Rd

Project Location – District 3

Project Location – District 5

For More Information Please visit our website: www.fgthydrotest.com Or contact FGT: Mr. Terry Coleman 2405 Lucien Way, Suite 200 Maitland, FL 32751 Toll Free – 844-FGT-INFO (844-348-4636) Office – 407.838.7054 Fax – 407.838.7052 Email – Terry.Coleman@energytransfer.com

FGT 16-Inch #1 Hydrotest Summary Federal mandate Testing with water Test will be Monday, 19 October 2015 Midnight – 4:00 AM Detours for SR 33 and for CR 582 With law enforcement Emergency vehicles can always cross

Thank You