PRE-PROPOSAL MEETING, January 16, 2018 Contract No.:

Slides:



Advertisements
Similar presentations
Doing Business with El Paso Water Utilities
Advertisements

ESTIMATING By Laith Jacob.
REPAIR ELECTRICAL DISTRIBUTION SYSTEM TO THE COMMUNICATION BUILDING Site Visit March 12, 2015 NASA Armstrong Flight Research Center 1.
Expectations What your Construction Professional, Architect, Construction Manager/Contractor expects from you? What you can expect from your Construction.
FAR Part 28 Bonds and Insurance. What is a Bond? Promise by a third party (the Surety) to fulfill the contractor’s responsibilities or compensate the.
Washington Metropolitan Area Transit Authority (WMATA) Invitation for Bid/ Contract Number – FQ12210 December 12, :00 AM JGB Board Room Rehabilitation.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Office of Risk Management Annual Conference Insurance Requirements in Contracts and Indemnification Agreements Procedures Manual Published by The Office.
Washington Metropolitan Area Transit Authority (WMATA) FQ15237 SIX (6) TIE BREAKER STATIONS UPGRADE ORANGE AND BLUE LINES VA, DC AND MD Pre-Bid Conference.
1 Risk Management Bonding & Insurance Jimmy Porter Risk Analyst City of Atlanta.
Dallas Area Rapid Transit Pre-Bid Conference Event #B Purchase and Install 5 Generators February 25, 2016.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Bus stop Amenity Cleaning April 13, 2016.
Department of Veterans Affairs Network Contracting Office (NCO) 21 Repair Building 1A Data Cables Pre-Proposal Conference and Site Walk Construction Request.
PRE-PROPOSAL CONFERENCE COMMUNITY LIVING CENTER CULTURE AND SAFETY IMPROVEMENTS VA R-0961 PROJECT: 654-CA-317 MAGNITUDE: $5 - $10 Mil 8/27/2012.
Request For Proposals. Request for Proposals Book 1 Contract Book 2 Project Requirements Book 3 Applicable Standards Reference Information Documents (RID)
Welcome to the Pre-Proposal Conference for the Comprehensive Fare Payment System March 4, 2015 Solicitation Number: P Event #3876.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Inspection, Testing, and Maintenance of Fire Protection and Life Safety Systems.
Procurement & Strategic Sourcing Chemistry Lab 150 Renovation
DOING BUSINESS WITH ALBERTA INFRASTRUCTURE
PROPERTY MANAGEMENT.
Joint Parking Task Force Update Procurement & Strategic Sourcing
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE
Joint Parking Task Force Update Procurement & Strategic Sourcing
Construction Oversight
Procurement & Strategic Sourcing FPM Geology Rock Collection 2017
Joint Parking Task Force Update Procurement & Strategic Sourcing
Joint Parking Task Force Update Procurement & Strategic Sourcing
PRE-PROPOSAL MEETING, September 19, 2017 Contract No.:
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Procurement & Strategic Sourcing FPM Parking Structure Lighting
Washington Metropolitan Area Transit Authority (WMATA)
9/18/2018 Bids CONTRACTING Khamis…..
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
June 27, 2017.
PRE-PROPOSAL MEETING, November 14, 2017 Contract No.:
Procurement & Strategic Sourcing Elliman Air Handling Units
Procurement & Strategic Sourcing FPM PRB Freezer Farms HVAC
Procurement & Strategic Sourcing USB Roof & Structure Repairs
Procurement & Strategic Sourcing Social Work Roof Replacement
PRE-PROPOSAL MEETING, January 25, 2018 Contract No.:
Procurement & Strategic Sourcing Matthaei Weight Room Flooring
Procurement & Strategic Sourcing Heat Pump Replacements 5057 Woodward
Procurement & Strategic Sourcing Elliman Air Handling Units REBID
Procurement & Strategic Sourcing Woodward and Warren Greenspace 2018
Washington Metropolitan Area Transit Authority (WMATA)
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
DOING BUSINESS WITH THE CITY OF KNOXVILLE
Procurement & Strategic Sourcing
Request for Proposal and Specifications for
How to do business with the RCSS?
Westmoreland Intermediate Unit
Procurement & Strategic Sourcing
Doing Business with Sno-Isle Libraries
WHAT IT TAKES TO BE A QUALIFIED SUBCONTRACTOR
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing School of Social Work Phase II
How To Do Business With The RCSS
FPM State Hall DTE PLD Electrical Conversion June 26, 2019
FPM State Hall DTE PLD Electrical Conversion June 26, 2019
Procurement & Strategic Sourcing Matthaei Office Addition
State Hall Elevator Improvements Phase 1 August 19, 2019
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
Presentation transcript:

PRE-PROPOSAL MEETING, January 16, 2018 Contract No.: 070735 Maintenance Mezzanine and Shed Heating

Presenters JULI TUSON CONTRACTS & PROCUREMENTS ANALYST Stan Ryter PROJECT MANAGER

Solicitation Info Scope of Work Site Visit Agenda Solicitation Info Scope of Work Site Visit

Procedural Issues Contact with The Port of Tacoma Juli Tuson, Contracts & Procurements Analyst Contact with The Port of Tacoma Clarifications/Addenda – only information published on the website is binding Interpretation or Changes to Solicitation www.portoftacoma.com (Contracts, Procurement, Bid 070735) All Information is Posted on the Website

HOLDER’S LIST

INSTRUCTIONS FOR BIDDING BID INFORMATION INSTRUCTIONS FOR BIDDING Bids due January 31, 2018 at 2:00PM PST Front Reception Desk, Port Administration Office, One Sitcum Plaza, Tacoma, WA Bidding Security: Each bid must be accompanied by a Certified Check or Security Bond in the amount equal to 5% of the bid. Award made to the apparent low bidder.

Insurance Port of Tacoma as Additional Insured by endorsement - Ongoing and Completed Operations Also by endorsement – Express Waiver of Subrogation Contractor’s policy is primary and not contributory Policies - Commercial General Liability Comprehensive Auto Except where noted – limits shall not be less than $2,000,000 for each occurrence and $2,000,000 in the aggregate Washington State Worker’s Compensation Fund and evidence of Stop Gap Employer’s Liability Insurance Contractor is solely responsible for determining if United States Longshoremen’s and Harbor Worker’s Act (USL&H) and Jones Act are required for this project.

Bonds – Performance & Payment

Scope of Work Stan Ryter Project Manager

Scope of Work The work required for this project includes: Construction of a pre-engineered steel mezzanine with steel shelving inside of an existing building and associated electrical, lighting, fire protection, and architectural upgrades. Remodeling of an existing pre-engineered building with new insulation, heating, and electrical upgrades. Architectural improvements include two new roll up doors and sealing of gaps.

Bid Documents Include: Scope of Work Bid Documents Include: Project Manual Mezzanine Drawings Shed Drawings Reference Documents – 1990 Maint. Shop Remodel Dwgs Reference Documents – Equip & Facilities Maint. Building Architectural

Procurement & Contracts Analyst Questions and Answers Juli Tuson Procurement & Contracts Analyst

Site Visit Everyone that participates in the Site Visit MUST complete and sign off on the “Release and Acceptance of Responsibility and Acknowledgement of Risks” form. Please hand the completed and signed form to the driver of the vehicle you ride in.