Video on verification – to be used in group discussions

Slides:



Advertisements
Similar presentations
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Isolation Positive isolation of dangerous fluids is providing a safe environment during.
Advertisements

Recording Narration to a PP presentation For an unattended PP, recorded narration may be added to replace a presenter Be careful-poor narration is worse.
Lockout/Tagout Training: 29 CFR Lockout Tagout Standard
February  Remove Version 7.5 from your computer  Install NSTAR Version 10  Create the model and server connections.
HSE’s Ageing and Life Extension Key Programme (KP4) and Human Factors
"AIR COOLER" Heat Exchanger
Video on verification – to be used in group discussions Norwegian oil and gas association.
OFFSHORE MISHAPS AND ACCIDENTS
The Problems with Long Bolt Flanges in process pipe connections when exposed to a fire!!
Forms: Getting Started Why use forms? –Make applications easier to use –Prevent errors –provide different groups of users with different views of the database.
THE INTERNATIONAL SOCIETY OF FIRE SERVICE INSTRUCTORS Electronic INSTRUCT-O-GRAM Program Lockout / Tagout Policy.
Sign In/Out. Auto-launches when logging in If there are issues, log off and log back in OR restart computer (hold in power button) To by-pass, use Shift.
Almost there! Though in the final stages of completing a program of study, students in the COMPLETION phase can still drop out or give up for many reasons.
Connecting to USF Network for Web Site SSH Secure Shell is the FTP program you will use to download your http files onto the USF server. To get the SSH.
Guide Demo Program installation SOP ePAD SW PM. Before you start Check “Guide” version is latest ( or ) * follow next page Latest version.
PowerPoint Extras. Eyes to the front please! Action Buttons.
Sarah Cordett, M.A. 1. Agenda Unit 7 Topics  Assistive Technology  Research Activity  Video: Demonstration of AT devices  Virtual Field Trip: Family.
Ice breaker: While we wait for class to start at the top of the hour, please share at least one key take-away that you learned in Unit 1 that will help.
Reflective Learning No Leaks – I own my barrier September 2015.
How to Use a Laptop Computers. Unplug the laptop from the computer on wheels!
Maryknoll Wireless Network Access Steps for Windows 7 As of Aug 20, 2012.
The Welding/Cutting Torch Objective 25.0 Demonstrate proper procedures for oxyacetylene processes.
Piper Alpha Disaster (6th July 1988) By : Nurul Azzah binti Abd Aziz.
Installing RMS 3.0 Contractor Mode
Lock Out / Tag Out The Control of Hazardous Energy
CASD Mobile Labs.
Lockout/Tagout/Verify Awareness
Supervisor Instructions: Bi-Weekly Payable Time/Absence Request
Economics: Principles in Action
How to document large technical-industrial monuments at sea.
Automatic Transmissions and Transaxles
USING A FIRE EXTINGUISHER
Lawson System Foundation 9.0
Objective: Given a data set, compute measures of center and spread.
Dr. Maureen O’Brien, Ph.D. Duquesne University
Dome C, Antarctica 2012.
Failure of Auxiliary valve
Tuesday 11th September LHCb dipole presently fault off
Introduction & Overview
Why Hire A Professional Licensed Plumber For Furnace Cleaning
Digital Literacy Computational Thinking and Coding
Economics: Principles in Action
What are the Parts Need to Replace For Resolving Transmission Fluid Leaks.
TWM Basic Steps to Perform Valve Check Load Test.
Copyright Pearson Prentice Hall
Applying the Principles
Microsoft PowerPoint This is the introduction to PowerPoint.
Why Do You Face 13-Pin Connector Issues in Your Mercedes Benz?
How to view the online lectures
Lessons Vocabulary Access 2016.
Control of Hazardous Energy
Cake q2 BARRIERS I BARRIERS  .
VG INSTALATION & MAINTENANCE.
A SELF-GUIDED COMPUTER ACTIVITY
A Day in the Life Video 2.
Working at Height.
CLICK TO SHOW ANIMATION
CLICK TO SHOW ANIMATION
CLICK TO SHOW ANIMATION
Global Safety Standard Orientation Line and Equipment Opening
Click Summary Value Button to Show Source of Integral or Time
CLICK TO SHOW ANIMATION
Economics: Principles in Action
Monday, November 5th If you are finished with your PowerPoint Presentation, please type for 15 minutes.
Topic 4: Connecting and Starting Single Phase Motors
INTERNET SPEED TEST IRELAND - CHECK BROADBAND SPEEDS.
Why are so many children still not in school?
Google Account Recovery Process
Risk Management Student Powerpoint
Welcome back to 2016 Memory Jogger – Mobil Retail M&R Activities
Presentation transcript:

Video on verification – to be used in group discussions Norwegian oil and gas association

Agenda Hydrocarbon leak causes Video on verification Discussion in groups

Major accident example Piper Alpha accident in 1988: Leak (2 kg/s)  ignition  explosion  fire  167 fatalities. Misunderstandings between day shift and night shift whether or not a job (PSV replacement) was initiated. Before During After

Hydrocarbon leaks categorization Hydrocarbon leaks above 0.1 kg/s on the Norwegian continental shelf in 2008-2013 [n=62] Almost two out of three leaks were related to work on hydrocarbon equipment (pink sector) Most of this work was carried out in the operations phase (not during annual shutdowns)

Examples Flange bolts with wrong torque Opened the wrong valve Forgot to reinstate a plug Reinstated too early Used the wrong kind of gasket Worked on wrong (pressurised) equipment

Leaks related to human intervention on hydrocarbon equipment (pink sector) Errors during isolation and reinstatement are important causes to hydrocarbon leaks!

Important principles to prevent such leaks Systematic use of isolation plan Verification of all critical tasks: One person performs and another person verifies

Link to Norwegian version and English version Video on verification The film is started by clicking one of the buttons below. Please note: The computer must be connected to the internet PowerPoint must be in «presentation mode» The resolution can be adjusted by clicking «settings» in the lower right corner. Choose 1808p if you have a fast internet connection No subtext English subtext Both versions have Norwegian speech Link to Norwegian version and English version

Discussion in groups

In which cases should isolation plan and verification be used? Task 1 In which cases should isolation plan and verification be used? During isolation and reinstatement when a valve is removed and replaced? During certification of a PSV? When a pig is going to be launched?

How should the verification be performed in practice? Task 2 How should the verification be performed in practice? Should the verification always be performed in field? Can the person performing the isolation and the person performing the verification go together? How can we ensure the two roles are separated?

Task 3 Verification is required, but you are the only process operator on your shift. What do you do?

Task 4 Pilots use check lists before take-off even though they perform this work task several times every day. Why?

Summary In average there is one leak every 10th year per platform on the Norwegian continental shelf (>0,1 kg/s). This equals one leak every 30th year per shift. Hydrocarbon leaks can result in a major accident like on Piper Alpha. We have to do whatever we can to prevent such an accident. Everybody makes an error from time to time. At least in 30 years! This is why we need strict rules for the use of isolation plans and verification. You are the pilot offshore!

More information www.norskoljeoggass.no/hydrokarbonlekkasjer