LESOTHO HIGHLANDS WATER PROJECT

Slides:



Advertisements
Similar presentations
Regional Policy Common Indicators: Infrastructure Definitions and Discussion Brussels, 22 nd November
Advertisements

INDEPENDENT WATER SCHEMES IN SAMOA
1 Regional Policy investing in ecosystems & green infrastructure for regional development Mathieu Fichter Policy Analyst Environment European Commission.
RATIFICATION OF THE LHWP II AGREEMENT Select Committee on Land and Environmental Affairs 23 October
Community Managed Project approach: an opportunity to improve the ownership in fluoride mitigation in Ethiopia Arto Suominen CTA/COWASH/MoWE/Ramboll GeoGen.
The Hashemite Kingdom of Jordan Ministry of Water and Irrigation Jordan Valley Authority RSDS- Phase I Desalination of (80-100) MCM/yr at Aqaba.
Proposed Rogun Hydropower and Regional Reservoir Project (Rogun HPP) Environmental and Social Impact Assessment (ESIA) Report by Panel of Experts* Almaty.
DALHOUSIE UNIVERSITY Halifax, Nova Scotia, Natural Environment Planning, AASHE 2011 Rochelle Owen, Director Office of Sustainability,
17 th Annual New Mexico Infrastructure Finance Conference Integrated Planning and Funding for Utilities Development and Maintenance of the ICIP Program.
Jodhpur Discom PRESENTATION Sr. OFFICERS MEETIN DATED
National Solar Water Heater Programme Update May 2014 Slide 1.
LESOTHO HIGHLANDS WATER PROJECT PHASE 2
Asia Geospatial Forum, PWTC, Kuala Lumpur 25 th September 2013.
1. 2 UN-HABITAT Current Status & Strategy for the Future.
LVBC 3 RD LAKE VICTORIA BASIN DONORS’ CONFERENCE Round Table Three Economic and Infrastructure Development Lily Kisaka.
Ingula Pumped Storage Project & Spirit of Ireland Project Sam Mottram – Manager Power Services 8 November 2010.
C51 RESERVOIR PROJECT UPDATE Design, Permitting and Coordination NOVEMBER 10, 2014.
1 Tanzania National Roads Agency TANROADS BRIEF OVERVIEW OF TANROADS Tuesday 29 th March 2011 Thursday 17 th June
AfDB Partnerships Forum March 2010
Department of Natural Resources and Conservation, Water Resources Division State Water Projects Bureau Kevin B. Smith, P.E., Chief
INSTALLATION OF CAPACITOR BANKS IN COMMERCIAL/INDUSTRY BUILDINGS African Regional NAMA Workshop Kigali, Rwanda, 2015 By: Kennedy Amankwa, Energy Commission,
FANRPAN THEME “ Advocating for the Active Engagement of the Youth in the Agricultural Value Chain".
NRCS Watershed Rehabilitation
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
1 1 BRANCH: CORPORATE AFFAIRS 1. CORPORATE MANAGEMENT SERVICES To provide financial and strategic support services that enhance service delivery by the.
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
Presentation of the ESIA Inception Report (Poyry, May 2011) Rogun Riparian Information Sharing and Discussions World Bank Central Asia Regional Office.
STANDING COMMITTEE ON APPROPRIATIONS Presentation by Zandile Mathe Deputy Director General: NWRI 11 February Briefing by Department of Water Affairs.
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
For Long Term Water Security SARDAR SAROVAR (NARMADA) PROJECT Sardar Sarovar Narmada Nigam Limited Dr. M.B. Joshi GM (Tech. & Coor.)
Middle Fork Project Project Description April 25, 2006.
Power Plant Construction and QA/QC Section General Features of Hydro Electric Project Engineering Technology Division.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
WEST KOWLOON CULTURAL DISTRICT
PRESENTATION TO THE PORTFOLIO COMMITTEE ON WATER AND FORESTRY International Water and Forestry Agreements.
Alternative funding model for water conservation African Water Leakage Summit 7 September 2011, Midrand.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
LOGO Capacity Building Programme on the Economics of Adaptation Supporting National/Sub-national Adaptation Planning and Action VIETNAM TEAM Cost and Benefits.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
PRACTICAL EXAMPLES OF CATCHMENT MANAGEMENT IN THE LESOTHO HIGHLANDS WATER PROJECT Presenter: G. Mokone Senior Officer Catchment Management APRIL 2011 LESOTHO.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Impacts of Road Projects on Environment & Recommended Mitigation Measures. (Presented for Discussion) December, 2008 E.C; Fogera Woreda, Woreta Abraham.
STANDING COMMITTEE ON APPROPRIATIONS Water Trading Entity 1 Briefing on the 4 th Quarter Expenditure Report for the Financial Year 2011/12.
RATIFICATION OF THE LIMPOPO WATERCOURSE AGREEMENT Presented by Ms. R. Moloi – International Development Cooperation Ms. M. Setwaba – Legal Services.
1 PRESENTATION TO THE NCOP FINANCE COMMITTEE MEETING 27 AUGUST 2008.
Department of Water Affairs and Forestry Department of Water Affairs and Forestry Department of Water Affairs and Forestry Department of Water Affairs.
Presentation to the Portfolio Committee on Public Works 1 March 2016 GREEN BUILDING FRAMEWORK PROPERTY MANAGEMENT TRADING ENTITY.
Restructuring of the Finnish Infrastructure Administration Draft
Erdeneburen HPP Project Implementation Unit
Water & Environment Sector Overview of 2016/17 Grant and Budget Guidelines Ministry of Water and Environment.
DC Water 的项目合作与职业 发展机会 Chein-Chi Chang ( 張建祺 ), Ph. D., P. E. D. C. Water and Sewer Authority, USA University of Maryland, Baltimore County, USA Environmental.
Led by a governing Board of Directors: Secretary of State (Chair) MCC Chief Executive Officer Secretary of the Treasury U.S. Trade Representative USAID.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
歐洲復興開發銀行採購商機 台灣歐銀業務發展辦事處 楊雅雯經理. 3,468 Projects 59.4 billion EURO – private sector 15.8 billion EURO – public sector 33 countries of operations.
1 KENYA SPAIN MULTILATERAL PARTNERSHIP MEETING (08-11 December 2013) AfDB Kenya Water and Sanitation Portfolio.
Hydropower development of Bulgaria: current state and future outlook Valentin Ivanov Deputy Minister Ministry of Economy and Energy.
1 TIF 9 (Trinity River Vision) Expanded and Updated Project and Financing Plans December 8, 2009 Presented to the City Council Jay Chapa Housing & Economic.
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Presentation to Portfolio Committee on Water and Sanitation on TCTA Integrated Annual Report 2015/16 Ms Monhla Hlahla CHAIRPERSON 2016.
Report to the UPDEA 39th General Assembly
Class III Estimate for Regional Consolidation
Welcome to the Stormwater & Sustainability Branch
Water & Environmental Affairs
Report on Conditional Grants
PROGRAMME 2 CONT - NATIONAL WATER RESOURCES INFRASTRUCTURE BRANCH.
REPORT ON THE STATUS OF THE INTEGRATED VAAL RIVER SYSTEM
Presentation transcript:

LESOTHO HIGHLANDS WATER PROJECT

CONTENTS Phase I – Current Status Phase II - Future Performance Costs Implementation program Performance Effects of Climate Change

Phase II Agreement signed on Treaty signed on 24 Oct 1986 Phase II Agreement signed on 11 August 2011

WHAT IS THE LHWP ? Bi-national interbasin water transfer - ultimate delivery 70 m3/s 5 Phases - 30 year Implementation - LHWC, LHDA & TCTA One of largest engineering projects Worth $ 8 billion

WHY THE LHWP ? Augmentation for Vaal System in RSA Millions people without water Cheaper alternative source Good quality water Opportunity for regional development Hydro-electricity for Lesotho

LESOTHO HIGHLANDS WATER COMMISSION Project governance Gov of Lesotho Gov of South Africa LESOTHO HIGHLANDS WATER COMMISSION

PHASE 1A & 1B Current

Phase 1

10

MUELA HYDRO POWER SWITCH YARD

POWERLINES

Bokong Vehicular Bridge

PHASE II Future

LHWP PHASE II Kobong Pump storage 101m high Kobong Dam 6.3 km tunnels 11.5m dia Transfer Tunnel 38.2 km long 5.2m diameter Polihali Dam 163.5m high rockfill dam 49.5m Saddle dam

POLIHALI to KATSE TUNNEL

TBM BREAKTHRU

Biophysical features Mitigation measures: Fish species Natural grass and woodlots Sedimentation Erosion prevention programmes Rehabilitation of disturbed areas Rescue Indigenous and threatened flora and fauna   Instream Flow Requirements IFR volumes and policy - Downstream losses & compensation Water quality Responsibility for monitoring

Other assets Affected By Reservoir ( Fields & Grazing Lands) SOCIAL Resettlement Polihali Reservoir Affects - 17 Villages = 534 Households = 2547 People Other assets Affected By Reservoir ( Fields & Grazing Lands) 72 Villages Affected Mokhotlong Town Excluded

ADVANCED INFRASTRUCTURE Roads St Peters to Oxbow Rd Oxbow to Seate Bridge Rd Seate Bridge to Mapholaneng Rd, etc…. = OR = Matsoku to Polihali Route construction power Reroute Letseng-Tlokoeng 33kV line Reroute Tlokoeng-Mapholaneng 33kV line Reroute Mapholaneng-Mokhotlong 33 kV line New line 132kV line (Kao option done by LEC to be considered later) = OR = Matsoku to Polihali line Substation Polihali Upgrade Ha Lejone sub station Residential areas Client, Engineer, Contractor facility, Lodge @ Mporosane and Polihali Labour camps FEEDER ROADS Mokhotlong to Mositeng Chaba Li Maketse to Moeaneng Ha Tlhakola to Makalong Ramoruti to Ha Pohla Ntlholohetsane to Ha Letjama Various road bridges Telecommunications Relocate existing lines Polihale dam connection Tunnel connection @ Polihali

KOBONG PUMP STORAGE SCHEME

Upper dam Tunnel Powerhouse Discharge tunnel to Katse Dam

Tunnel Intake Water transfer to SA Katse reservoir PS

KOBONG 1200MW PUMP STORAGE SCHEME PROJECT STATUS Lower Dam = Katse Dam Upper Dam = Kobong Dam Dam height = 101 meters Headrace Tunnel length = 4270 meters Headrace Tunnel diameter = 11.5 meters Detailed Feasibility Study funded by Swedish Government commenced in 2012 Feasibility Study complete 2013 Detailed design 2014 to 2016 Construction to start 2016 Completion end 2021

TOP STRUCTURE OF THE LHDA – PHASE II Chief Executive CHIEF OPERATING OFFICER (COO) Div Manager Social Development and Environmental Div Manager Phase II & Project management Unit Div Manager Development and Operations Division PMU - Engineering - Social & environmental - Financial - Communications (PR) - Contracts / Legal ……. Finance Chief Financial Officer HYDRO FUNDING LESOTHO RESPONSIBILITY Funding procurement / administration WATER TRANSFER RSA RESPONSIBILITY TCTA Funding procurement / administration 27

PERFORMANCE

Key Performance Indicator Yield – Water Delivery (Volume & Quality) Power Supply – Revenue (Availability) Sustainability – Policy (IFR, EAP) Safety – Instrumentation (DSR)

Effects of Climate Change

4 x 1

THANK YOU