Flood Map Modernization FEMA’s Flood Map Modernization Update for Advisory Committee on Water Information (ACWI) February 2008 Allyson Lichtenfels FEMA.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

State Historic Preservation Plan City & County of Honolulu May 22,
This is an audio-enhanced PowerPoint presentation. To hear the audio, please open this presentation in Slide Show view. Changes to the National Flood.
1 WMO First DPM Coordination Meeting Global results of the WMO Country-Level DPM Survey: Preliminary analysis of current capacities, gaps and needs of.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
February, 2010 LEA Support Advisory Council. Agenda 2:30-3:00Discuss plan revision process (feedback and support) 3:00-3:30Discuss February workshops.
Assistant Regional Director
Report to TACIR on Underground Utility Damage Prevention in Tennessee
0 - 0.
Addition Facts
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
What People Know About Flood Risk: Region 8 Results of the 2012 Risk MAP Public and Local Official Surveys.
FEMAs Role in Tsunami Mitigation NOAA East-Gulf Coast Caribbean Tsunami Conference June 10, 2011 Sandra Knight, Deputy Federal Insurance and Mitigation.
III. 1 III. Overview Of ADWR/ADEM Roles A. State NFIP Coordinator – ADEM.
Many Agencies, One Solution Welcome to Washington Silver Jackets Preliminary Meeting Bellevue, Washington 5 August 2010.
Effects on UK of Eustatic sea Level rise GIS is used to evaluate flood risk. Insurance companies use GIS models to assess likely impact and consequently.
Flood Map Modernization in North Dakota North Dakota State Water Commission FLOOD MAP MODERNIZATION.
Raising the Standard for Improved Flood Risk Management in the Midwest Raising the Standard for Improved Flood Risk Management in the Midwest Interagency.
Local Policy I Session Name: Local Policy I Coastal Hazards Management Course I. Introduction What Do We Mean By “Local Policy” General Police Power Session.
Hazard Mitigation Planning I Session Name: Hazard Mitigation Planning I Coastal Hazards Management Course Signed by the President on October 30, 2000 Amends.
FEMA PROGRAMS II Session Name: FEMA Programs II Coastal Hazards Management Course Amends the Stafford Act Establishes a Pre-Disaster Mitigation Program.
Addition 1’s to 20.
25 seconds left…...
Week 1.
The Role of Levees in the National Flood Risk Management Program Pete Rabbon June 19, 2008 Hazards Caucus Alliance.
1 No Adverse Impact presented by Larry Larson, CFM Executive Director Association of State Floodplain Managers A Common Sense Strategy for Floodplain Management.
We will resume in: 25 Minutes.
Sandy: Building Back Stronger, Safer & More Resilient Tim Crowley, Director, Mitigation Division, FEMA Region II December 2012.
Flood Map Modernization and FEMA Levee Policy February 2008 Doug Bellomo Director, Risk Analysis Division Mitigation Directorate, FEMA.
June 20, 2007 National HAZUS-MH User Conference 1 Optimizing Your Use of HAZUS through HAZUS User Groups and HAZUS.org Moderator: Jamie Caplan, Jamie Caplan.
Risk MAP Discovery Matanuska-Susitna Borough Information Exchange Sessions March 2013.
Scoping the North Carolina Cooperating Technical State Project Ed Curtis, P.E., CFM, North Carolina Division of Emergency Management Jerry Sparks, P.E.,
Alabama’s Floodplain Management Program Tom Littlepage Alabama Office of Water Resources.
Overview of FEMA Actions and Accomplishments Doug Bellomo July 13, 2009 National Flood Risk Management Summit.
FEMA Update: Flood Map Modernization and Risk MAP Presented on behalf of FEMA by David I. Maurstad, PBS&J.
> > > > Association of State Floodplain Managers.
Risk MAP and Discovery FEMA Region [#], [WATERSHED NAME] Watershed Discovery Meetings [DATE]
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Flood Risk Mapping Project Identifying the Risk Editorial Board Meeting [COMMUNITY NAME] Flood Risk Mapping Project.
In coordination with FEMA Scoping Meeting Lake County, California February 19, 2010.
FEMA’s Role in National Water Policy Supporting National Water Resource Policy Introduction Sandra K. Knight National Waterways Conference September 22-24,
Federal Emergency Management Agency Donna M. Dannels Director, Policy and Assessment Division Mitigation Directorate.
Flood Risk Management Program Rolf Olsen Institute for Water Resources U.S. Army Corps of Engineers.
‘Community Resilience Toolbox’ Training Series: Leveraging Public and Community Data to Assess Local Flood Risk Thursday, September 26, :00–1:00.
Georgia Flood M.A.P. Program
Infrastructure Challenges in Kentucky Carey Johnson Kentucky Division of Water 2014 Governor’s Conference on Energy and the Environment.
FEMA’s Coastal Mapping and Management Process. 2 2 Welcome  Background and Coastal study methodologies  Technical Opportunities  Management Opportunities.
+ 3D Elevation Program May 8, 2013 The National Map.
Doug Bellomo April 6, NFDA Retreat & Conference “Risk MAP--Foundation, Transition, Integration” Risk MAP: An Update to NFDA.
Relevant, Ready, Responsive, Reliable 1 Addressing the Flood Risk Challenge.
US Army Engineer Research and Development Center COASTAL OUTREACH ADVISORY TEAM Kick-off Meeting November 19, 2010 FEMA Region III Coastal Mapping Project.
Overview of Flood Program April Doug Bellomo, Director Risk Analyses Division Mitigation Directorate, FEMA.
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Flood Map Modernization June 11,  Obtain Best Available Data  Develop Partnerships for Production that Enhance Capability (local, state, fed)
Risk MAP and Discovery FEMA Region [#], [WATERSHED NAME] Watershed Information Exchange Sessions [DATES]
Mid-Course Adjustment Overview. Flood Map Modernization The Question “The committee understands that the 5-year, $1,000,000,000 program will not update.
FEMA’s Risk MAP Coastal Updates – An Overview Jonathan E. Westcott, P.E. ASFPM 2012 National Conference San Antonio, TX Session D.8.
A National Hazards Information Strategy (NHIS) Helen M. Wood Director, Office of Satellite Data Processing & Distribution “A coordinated approach for using.
Discovery Meeting FEMA Region [#]. 2 Introductions.
Mitigation Directorate FEMA’s Mitigation Directorate and Hurricane Emergency Management The Mitigation Directorate supports Hurricane risk assessment and.
Flood Map Modernization Mitigation Division, FEMA.
Monmouth County Multi-Jurisdictional Hazard Mitigation Plan Update.
Advanced Topics in Risk Communication: Skills and Techniques for Flood Risk Managers KY Risk Communication Toolbox 2012 USACE Flood Risk Management and.
December 16 th, 2009 Presented by Jennifer DiLorenzo, M.S., CFM Sustainable Coastal Community Liaison Developed in Cooperation with the ASFPM 1 Floodplain.
Risk MAP Discovery Malheur & Payette Counties Information Exchange Sessions July 2015.
BUILDING STRONG ® 1 Risk Management Center Silver Jackets Program Overview Jennifer Dunn USACE, Institute for Water Resources Silver Jackets Program Manager.
FEMA Risk MAP City of Yakima – Lower Yakima Discovery Information Exchange Session May 9, 2016.
City of Stockton Levee Flood Protection Status Report January 29, 2008 Agenda Item 4.03.
<<County Name>> <<Date>>
Presentation transcript:

Flood Map Modernization FEMA’s Flood Map Modernization Update for Advisory Committee on Water Information (ACWI) February 2008 Allyson Lichtenfels FEMA – Mitigation Risk Analysis Division

Flood Map Modernization 2 Agenda:  FEMA Flood Mapping supports the NFIP  Flood Map Modernization Successes (FY04-FY08)  Challenges Remaining  The Future ( FY09 and Beyond) Flood Map Modernization

FEMA Flood Mapping Supports the National Flood Insurance Program (NFIP)

Flood Map Modernization 4 Floods caused $50 Billion in damages in the 1990’s; NFIP losses alone totaled $20 Billion in 2005

Flood Map Modernization 5 Flood Map The Flood Insurance Rate Map (FIRM) Map Legend Map Index

Flood Map Modernization 6 NFIP 3 Legged Stool  Insurance Reduces burden on the Treasury and taxpayers  Floodplain Management and Mitigation Required for insurance eligibility Reduce the risks over time  Hazard Identification, Assessment, and Planning Supports sound floodplain management, enforcement of insurance requirements and insurance rating

Flood Map Modernization Flood Map Modernization Successes - FY04-FY08

Flood Map Modernization 8 Flood Map Modernization FY04-FY08  Flood Map Modernization is a 5-yr $1 billion Presidential Initiative that ends in FY08  FY08 Map Mod Budget – Appropriated $220M  Digital Flood Hazard Data and Maps for 92% of the Nation’s population  Enhanced Flood Map Quality – primarily the flood hazard boundary  Effective Program Management and Performance Measurement  Effective Partnerships with State, Local and National organizations as well as Other Federal Agencies

Flood Map Modernization 9 Performance Measurement – Key Performance Indicators (KPIs) FY04FY05FY06FY07FY08 TargetActualTargetActualTargetActualTargetActualTargetProj. Population w/ digital GIS flood data available online 20%17%50%39%50%48%60% 70% Population with effective maps that meet quality standards 10%8%20%16%25%23%35%32%50%

Flood Map Modernization 10 Effective Partnerships  Leveraging Resources Federal Agencies  USACE  USGS  NOAA  IAA with USGS to manage Map Mod Orthoimagery  National Digital Orthophoto Program (NDOP) and National Digital Elevation Program (NDEP)  State, Regional, and Local Resources Expanded Cooperating Technical Partners (CTP) Program

Flood Map Modernization 11 Levee Assessment Nationwide and Outreach  Continuing Coordination with the USACE  Continuing to work with communities and levee owners to assess levees as part of the mapping efforts  Furthering Levee Stakeholder Education Efforts

Flood Map Modernization 12 Risk-Based Resource Allocation and Planning  Multi-Year Flood Hazard Identification Plan Started in 2004 and updated yearly States and other key stakeholders involved through business planning Open and transparent resource allocation methodologies based on flood risk Gives other federal agencies an idea of where and when we will focus our flood mapping – facilitates leveraging Latest publication April 2007 available at: FY08 MHIP update in work; expected release Spring 2008

Flood Map Modernization 13 Where is Flood Risk the Greatest?

Flood Map Modernization 14 Effective Flood Maps in Map Mod (Projected counties in MHIP - February 2007)

Flood Map Modernization Challenges Remaining

Flood Map Modernization 16 Map Mod Challenges Challenges identified through Map Mod: Levees – good flood hazard data needed Coastal Flood Hazards – Storm surge and wave height updates critical NFIP participating communities – Not all will be “modernized” Degradation of Flood Hazard Data – What was done early in Map Mod needs to be assessed

Flood Map Modernization The Future FY09 and Beyond

Flood Map Modernization 18 Maps and the Mapping Process are Critical to reducing losses  Good flood maps are necessary but not the only component of flood risk reduction Without a good representation of the hazard you can’t reduce your risk Maps without follow-up action by communities and individuals are less valuable  The Mapping Process Drives Flood Mitigation Despite the media coverage many don’t see flooding as a problem for them Flood map updates help communicate flood risk – encourage action

Flood Map Modernization 19 Flood Risk Mapping, Analysis, and Planning (Risk MAP)  National Flood Insurance Reform Act of 1994 Requires that FEMA review and assess the NFIP map for each community for map update needs each 5 years  Draft Concepts for FEMA’s potential Flood Risk Mapping, Analysis and Planning efforts to address this requirement in FY09 and beyond being developed Draft FEMA FY09 Flood Mapping Concept Paper available at FEMA’s Flood Hazard Mapping Website:

Flood Map Modernization